Forwards Application to Amend License DPR-59,changing Tech Spec Table 3.7-1 Re HPCI Pump Suction Line Isolation Valve Closure Time.W/Class II Amend Fee
ML20049J726
Person / Time
Site: FitzPatrick Constellation icon.png
Issue date: 03/09/1982
From: Bayne J
POWER AUTHORITY OF THE STATE OF NEW YORK (NEW YORK
To: Vassallo D
Office of Nuclear Reactor Regulation
Shared Package
ML20049J727 List:
References
JPN-82-29, NUDOCS 8203190318
Download: ML20049J726 (2)


Text

- _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ - _ _ _

t POWER AUTHORITY OF THE STATE OF NEW YORK 10 CoLUMaus CIRCLE NEW YORK N. Y OO1'9Q p (212) 397-6200 y' No$Q E7 BERRY 7

tausTres p a*Tias orricia

]J 3H ~ BosTO soHN s.oysON ,, { g CM.54 M.N . ,, SI D ENTWR OCE DU R E S p' (

GEORGE L. ING ALLS

...E c.......

g pag

, , e ) '.cy ,i,c,or.

W Of T & CMIEF RICH AMO M. FLYNN

. .iuCoxi, nascar o Mittown u 9 tw= ton vecE passicaNT Faroenicx n. cLanx March 9, 1982  % _

@\ $r*E"l "''

JPN-82-29 THOM AS R. FREY l'.".'U.'.c "'A o' "'

Director of Nuclear Regulatory Regulation U. S. Nuclear Regulatory Commission Wa shington, D. C. 20555 Atte ntion: Mr. Domenic B. Vassallo, Chief Operating Reactor Branch No. 2 Division of Licensing Subj ect : James A. FitzPatrick Nuclear Power Plant Docket No. 50-333 Proposed Changes to the Technical Specifications Regarding H,PCI Pump Suction Line Isoltion Valve Closure Time

Dear Sir:

Enclosed for filing are three (3) sf gned orginals and nineteen (19) copies of a document entitled, " Application for Amendment to Operating License, "together with forty (40) copies of Attachments I and II thereto, comprising a statement of the proposed changes to the Technical Specifications and the associated Safety Evaluation.

This proposed amendment to Appendix A of the Operating License deletes the closure time, limit of the High Pressure Coolant Injection (HPCI) pump suction line isolation valves. This closure time limit is given in Table 3.7-1 of the Technical Specifications (page 202). The proposed changs deletes a time limit requirement which was included in the original Technical Specifications, but which is not necessary to assure the safe operation of the plant or the health and saf ety of the public. This change will conform the Technical Specifications to the Final Saf ety Analysis Report which states that a closure time requirement is r.ot applicable to these valves. This change is also consistent with the existing Technical Specification Bases.

The proposed change is Attachment I to the Application for Amendment of the Operating License included with this letter. The Safety Evaluation for the proposed change to the '?echnical Specifications is Attachment II to the O i Application for Amendement

  • I g(Sb

/

y nOo a 8203190318 820309 ,

PDR ADOCK 05000333 '

P PDR

-________-----___a

The Authority has classified this operating license amendment application as Class II. Enclosed is a check in the amount of $1,260 as the filing fee per 10 CFR 170.22, which the Authority pays under protest pending a final determination of the legality of the fee schedule.

Very truly yours,

/ /lP. yne

{J. Senbr ice President Nucle' r Generation

. .