ML20049J712

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Rept 50-373/82-04 on 820126-29 & 0209-12. No Noncompliance Noted
ML20049J712
Person / Time
Site: LaSalle 
Issue date: 03/03/1982
From: Norelius C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Cordell R
COMMONWEALTH EDISON CO.
Shared Package
ML20049J713 List:
References
NUDOCS 8203190263
Download: ML20049J712 (2)


See also: IR 05000373/1982004

Text

.

HAR

31982

w

&

Docket No. 50-373(DETP)

hs

figkg %K

b

Coamonwealth Edison Company

NA?y h I3dp",

~

,

ATTN:

Mr. Cordell Reed

~

-O

-

?; h,

Vice President

(

Post Office Box 767

Nf?

s

Chicago, IL 60690

"r

'

3

,

,

'

/.

fys77-G'

Gentlemen:

% . '/

This refers to the routine safety inspection conducted by Messrs.

R. D. Lanksbury, I. N. Jackiw, M. A. Ring and D. L. Robinson of this

office on January 26-29, and February 9-12, 1982, of activities at

LaSalle County Nuclear Power Station, Unit 1, authorized by NRC

Construction Permit No. CPPR-99 and to the discussion of our findings

with Messrs. B. Stephenson and R. Holyoak and other members of your

staff at the conclusion of the inspection.

The enclosed copy of our inspection report identifies areas examined

during the inspection. Within these areas, the inspection consisted

of a selective examination of procedures and representative records,

observations, and interviews with personnel.

No items of noncompliance with NRC requirements were identified during

the course of this inspection.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy

of this letter and the enclosed inspection report will be placed in the

NRC's Public Document Room.

If this report contains any information

that you (or your contractors) believe to be exempt from disclosure under

10 CFR 9.5(a)(4), it is necessary that you (a) notify this office by tele-

-

phone within ten (10) days from the date of this letter of your intention

to file e request for withholding; and (b) submit within twenty-five (25)

days from the date of this letter a written application to this office

to withhold such information.

If your receipt of this letter has been

delayed such that less than seven (7) days are available for your review,

please notify this office promptly so that a new due date may be estab-

lished. Consistent with Section 2.790(b)(1), any such application must

8203190263 820303

N,O (

gDRADOCK 05000373

g

PDR

'/

.

o

.

Commonwealth Edison Company

2

MAR 3 582

be accompanied by an affidavit executed by the owner of the information

which identifies the document or part sought to be withheld, and which

contains a full statement of the reasons which are the bases for the

claim that the information should be withheld from public disclosure.

This section further requires the statement to address with specificity

the considerations listed in 10 CFR 2.790(b)(4). The information sought

to be withheld shall be incorporated as far as possible into a separate

part of the affidavit.

If we do not hear from you in this regard within

the specified periods noted above, a copy of this letter and the enclosed

inspection report will be placed in the Public Document Room.

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

i:j 7] gin .{ ' 5icr.b! by C.I$. NkCII

C. E. Norelius, Director

Division of Engineering and

Technical Programs

Enclosure:

Inspection Report

No. 50-373/82-04(DETP)

cc w/ enc 1:

Louis 0. De1 George, Director

of Nuclear Licensing

L. J. Burke, Site

Construction Superintendent

T. E. Quaka, Quality

Assurance Supervisor

R. H. Holyoak, Station

Superintendent

B. B. Stephenson, Project Manager

DMB/ Document Control Desk (RIDS)

Resident Insna-tor, RIII

Mary Jo Mt. tray, Office of

Assistant Attorney General

III

RIII

RIII

RIII

R141

RIII

RIII

RIII

Lanksb(ury/jp (\\)$

?

.d

@ Knop"k

b.G

!! '

glpinas

4D

m' lng

Lihtle

Jackiw

Robinson Maura

R

2/24/82

g _M - 71

.