HAR
31982
w
&
Docket No. 50-373(DETP)
hs
figkg %K
b
Coamonwealth Edison Company
NA?y h I3dp",
~
,
ATTN:
Mr. Cordell Reed
~
-O
-
?; h,
Vice President
(
Post Office Box 767
Nf?
s
Chicago, IL 60690
"r
'
3
,
,
'
/.
fys77-G'
Gentlemen:
% . '/
This refers to the routine safety inspection conducted by Messrs.
R. D. Lanksbury, I. N. Jackiw, M. A. Ring and D. L. Robinson of this
office on January 26-29, and February 9-12, 1982, of activities at
LaSalle County Nuclear Power Station, Unit 1, authorized by NRC
Construction Permit No. CPPR-99 and to the discussion of our findings
with Messrs. B. Stephenson and R. Holyoak and other members of your
staff at the conclusion of the inspection.
The enclosed copy of our inspection report identifies areas examined
during the inspection. Within these areas, the inspection consisted
of a selective examination of procedures and representative records,
observations, and interviews with personnel.
No items of noncompliance with NRC requirements were identified during
the course of this inspection.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy
of this letter and the enclosed inspection report will be placed in the
NRC's Public Document Room.
If this report contains any information
that you (or your contractors) believe to be exempt from disclosure under
10 CFR 9.5(a)(4), it is necessary that you (a) notify this office by tele-
-
phone within ten (10) days from the date of this letter of your intention
to file e request for withholding; and (b) submit within twenty-five (25)
days from the date of this letter a written application to this office
to withhold such information.
If your receipt of this letter has been
delayed such that less than seven (7) days are available for your review,
please notify this office promptly so that a new due date may be estab-
lished. Consistent with Section 2.790(b)(1), any such application must
8203190263 820303
N,O (
gDRADOCK 05000373
g
'/
.
o
.
Commonwealth Edison Company
2
MAR 3 582
be accompanied by an affidavit executed by the owner of the information
which identifies the document or part sought to be withheld, and which
contains a full statement of the reasons which are the bases for the
claim that the information should be withheld from public disclosure.
This section further requires the statement to address with specificity
the considerations listed in 10 CFR 2.790(b)(4). The information sought
to be withheld shall be incorporated as far as possible into a separate
part of the affidavit.
If we do not hear from you in this regard within
the specified periods noted above, a copy of this letter and the enclosed
inspection report will be placed in the Public Document Room.
We will gladly discuss any questions you have concerning this inspection.
Sincerely,
i:j 7] gin .{ ' 5icr.b! by C.I$. NkCII
C. E. Norelius, Director
Division of Engineering and
Technical Programs
Enclosure:
Inspection Report
No. 50-373/82-04(DETP)
cc w/ enc 1:
Louis 0. De1 George, Director
of Nuclear Licensing
L. J. Burke, Site
Construction Superintendent
T. E. Quaka, Quality
Assurance Supervisor
R. H. Holyoak, Station
Superintendent
B. B. Stephenson, Project Manager
DMB/ Document Control Desk (RIDS)
Resident Insna-tor, RIII
Mary Jo Mt. tray, Office of
Assistant Attorney General
III
RIII
RIII
RIII
R141
RIII
RIII
RIII
Lanksb(ury/jp (\\)$
?
.d
@ Knop"k
b.G
!! '
glpinas
4D
m' lng
Lihtle
Jackiw
Robinson Maura
R
2/24/82