Proposed Tech Spec Pages,Changing Tables 4.3-8 & 4.3-9 to Reflect Downscale Failure Alarms,Per OL Conditions 2.C(18)a & 2.C(11)a for Units 1 & 2,respectively
ML20049J134
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 03/09/1982
From:
TENNESSEE VALLEY AUTHORITY
To:
Shared Package
ML20049J128 List:
References
NUDOCS 8203120130
Download: ML20049J134 (9)


Text

{{#Wiki_filter:. ENCLOSURE 1 PROI JSED TEC11NICAL SPECIFICATIONS FOR SRQUbYAll NUCLEAR PLANT e 8203120130 820309 PDR ADOCK 05000327 P PDR

a s ( i i 1

  1. P-PROPOSED TECilNICAL SPECIFICATIONS SEQUOYAll NUCLEAR PLANT UNIT 1 f

4 i i

k, TABLE 4.3-P,(Continued) \\ TABLE NOTATION During liquid additions to the tank. ~ ~~'- ~ (1) The CHANNEL FUNCTIONAL TEST shall also demonstrate that automatic isolation of this pathway and control room alarm annunciation occurs if any of the following conditions exists: 1. Instrument indicates measured levels above the alarm / trip setpoint. 2. Circuit failure. , f 3. Downscale failure (2) The CHANNEL FUNCTIONAL TEST shall also demonstrate that control room alarm annunciation occurs if any of the following conditions exists: 1. Instrument indicates measured levels above the alarm setpoint. 2. Circuit failure. 3. Downscale failure (3) The initial CHANNEL CALIBRATION shall be performed using one or more of the reference standards certified by the National Bureau of Standards or using stahdards that have been obtained from suppliers that participate in measurement assurance activities with NBS. These standards shall permit calibrating the system over its intended range of energy and measurement range. For subsequent CHANNEL CALIBRATION, sources that have been related to the initial calibration shall be used. (4) CHANNEL CHECK shall consist of verifying indication of flow during periods of release. CHANNEL CHECK shall be made at least once per 24 hours on days on which continuous, periodic, or batch releases are made. O ~59 I .,g SEQUOYAH - UNIT 1. 3/4 3-73

TABLE 4.3-9 (Continued) TABLE NOTATION At all times. During waste gas disposal system operation. During shield building exhaust system operation.

        • During waste gas releases.

(1) The CHAtitlEL FUtlCTI0ilAL TEST shall also demonstrate that automatic isolation of this pathway and control room alarm annunciation occurs if any of the following conditions exists: 1. Instrument indicates measured levels above the alarm / trip setpoint. 2. Circuit failure. \\ (2) The CHANNEL FullCTI0!lAL TEST shall also demonstrate that control room alarm annunciation occurs if any of the following conditions exists: 1. Instrument indicates measured levels above the alarm setpoint. 2. Circuit failure. 3. Downscale failure (3) The initial CHANtlEL CALIBRATION shall be performed using one or more of the reference standards certified by the National Bureau of Standards or using standards that have been obtained from suppliers that participate in measurement assurance activities with NBS. These standards shall permit calibrating the system over its intended range of energy and measurement range. For subsequent CHANNEL CALIBRATION, sources that have been related to the initial calibration shall be used. (4) The CHAthlEL CALIBRATION shall include the use of s'tandard gas samples containing a nominal: 1. One volume percent hydrogen, balance nitrogen, and 2. Four volume percent hydrogen, balance nitrogen. (b) The CHAtlNEL CALIBRATION shall include the use of standard gas samples containing a nominal: 1. One volume percent oxygen, balance ni'rogen, and 2. Four volume percent oxygen, balance nitrogen. SEQUOYAH - UNIT 1 3/4 3-80

\\ PROPOSED TECHNICAL SPECIFICATIONS SEQUOYMI NUCLEAR PLANT f UNIT 2 e g E t

TABLE 4.3-8 (Continued) TABLE NOTATION i f During liquid additions to the tank: (1) The CHANNEL FUNCTIONAL TEST shall also demonstrate that automatic isolation of this pathwa/ and control room alarm annunciation occurs if 4 any of the following conditions exists: ( l. Ins +.rument indicates measured, levels above the alarm / trip setpcint. 4 l 2. Circuit failure. -{- 3. Downscale fallare (2) The CHANNEL FUNCTIONAL TEST shall also demonstrate that' control room. alarm annunciation occurs if any of the following conditions exists: j l. Instrument ind'icates measured levels above the alarm setpoint. J 2. Circuit failure. 3. Downscale failure (3) The initial CHANNEL CALIBRATION shall be perforT.ed using one or more of the reference standarcs certified by the National Bureau of Standards or using standards that have been obtained from' suppliers:that participate in measurement assurance activities with NBS. These standards shall permit calibrating the system over its intended range of energy and measurement range. For subsequent CHANNEL CALIBRATION, sources that have been related to the initial calibration shall be used. l (4) CHANNEL CHECK shall consist of verifying indication of flow during periods of release. CHANNEL CHECK shall be made at least once per 24 hours on days on which continuous, periodic, or batch releases are made. i i e SEQUOYAH - UNIT 2 3/4 3-75 i

TABLE 4.3-9 (Continued) TABLE NOTATION At all times. _ ^^ During waste gas disposal system operation. ^^^ During shield building exhaust system operation.

        • During waste gas releases.

(1) The CHANNEL FUNCTIONAL TEST shall also demonstrate that autcmatic isolation of this pathway and control rcom alarm annunciation occurs if any of the following conditions exists: 1. Instrument indicates measured levels above the alarm / trip setpoint. 2. Circuit failure. (2) The CHANNEL FUNCTIONAL TEST shall also demonstrate that control room a! ara annunciation occurs if any of the following conditions exist 3: 1. Instrument indicates measured levels above the alarm setpoint. 2. Circuit failure. 3. Downscale failure (3) The initial CHANNEL CALIBRATION shall be performed using :re Or more of the reference standards certified by the National Bureau of Standards or using standards that have been obtained from suppliers that participate in measurement assurance activities with NBS. These standards shall permit ca!ibrating the system over its intended range of energy and measurement range. For subsequent CHANNEL CALIBRATION, sources that have been related to Uie initial calibration shall be used. s (4) The CHANNEL CALIBRATION shall include the use of standard gas samples containing a nominal: 1. One volume percent hydrogen, balance nitro, gen, and 2. Four volume percent hydrogen, balance nitrogen. (5) The CHANNEL CALIBRATION shall include the use of standard gas samples containing a nominal: 1. One volume percent oxygen, balance nitrogen, and 2. Four volume percent oxygen, balance nitrogen. SEQUOYAH - UNIT 2 3/4 3-82

0 ENCLOSURE 2 JUSTIFICATION FOR PROPOSED TECIINICAL SPECIFICATIONS This change is being subciitted to reflect the changes to Tables 4.3-8 and 4.3-9 required by the installation of the downscale failure alarms as required by the operating license conditions 2.C(18)a for unit 1 and 2.C(11)a for unit 2. M e a

.____ ~ _ _ _ _. _ _ _.. _ _. - _ i .. =

  • i i

1 ] ENCLOSURE.1 i ) i i e i 1 i PROPOSED TECllNICAL SPECIFICATIONS FOR i SRQUOYAll NUCLEAR PLANT i t b f I .I l 3 I .i t 4 I ) I i t 1 ___..~,-,.,__m,--.,_ - - - - - - - - - --- -}}