ML20049H581

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Repts 50-237/82-01,50-249/82-01, 50-254/82-01 & 50-265/82-01 on 820104-07 & Notice of Violation
ML20049H581
Person / Time
Site: Dresden, Quad Cities, 05000000
Issue date: 02/16/1982
From: Norelius C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Reed C
COMMONWEALTH EDISON CO.
Shared Package
ML20049H582 List:
References
NUDOCS 8203030324
Download: ML20049H581 (2)


See also: IR 05000237/1982001

Text

,

'

.

RU1e Gk

Docket No. 50-237

Docket No. 50-249

gt ! q

[4'v

' '

Docket No. 50-254

Docket No. 50-265

'

c'

r . .; .

.,;

'

Commonwealth Edison Company

"

MM3

1037 3 ;;

.

ATTN:

Mr. Cordell Reed

.

  1. 99pm r 77

Vice President

"~i^,' W[M

Post Office Box 767

'-

Chica8o, IL 60690

k

QW,l'f "

I

Gentlemen:

This refers to the special safety inspection conducted by Mr. I. T. Yin

of this office on January 4-7, 1982, at EDS Nuclear Inc., Walnut Creek,

California, of activities at Dresden Station, Units 2 and 3, authorized

by NRC Operating Licenses No. DPR-19 and No. DPR-25, and of activities

at the Quad-Cities Station, Units 1 and 2, authorized by NRC Operating

Licenses No. DPR-29 and No. DPR-30 and to the discussion of our findings

with your representatives prior to the conclusion of the inspection.

The enclosed copy of our inspection report identifies areas examined during

the inspection. Within these areas, the inspection consisted of a selective

examination of procedures and representative records, observations, and in-

terviews with personnel.

During this inspection, certain of your activities appeared to be in non-

compliance with NRC requirements, as specified in the enclosed Appendix.

A written response, submitted under oath or affirmation, is required.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of

this letter, the enclosures, and your response to this letter will be placed

in the NRC's Public Document Room.

If this report contains any information

that you (or your contractors) believe to be exempt from disclosure under

10 CFR 9.5(a)(4), it is necessary that you (a) notify this office by tele-

phone within ten (10) days from the date of this letter of your intention to

file a request for withholding; and (b) submit within twenty-five (25) days

from the date of this letter a written application to this office to withhold

such information.

If your receipt of this letter has been delayed such that

less than seven (7) days are available for your review, please notify this

office promptly so that a new due date may be established. Consistent with

'l ECl

$

8203030324 820216

PDR ADOCK 05000237

/ j

G

PDR

!

.

.

'

l

'

i

i

!

!

Commonwealth Edison Company

-2-

i

l

Section 2.790(b)(1), any such application must be accompanied by an. affidavit

,

'

executed by the owner of the information which identifies the document or part

j

sought to be withheld, and which contains a full statement of the reasons which

are the bases for the claim that the information should be withheld from public

disclosure. This section further requires the statement to address with speci-

ficity the considerations listed in 10 CFR 2.790(b)(4). The information sought

,

to be withheld shall be incorporated as far as possible into a separate part of

j

!

the affidavit.

If we do not hear from you in this regard within the specified

periods noted above, a copy of this letter, the enclosures, and your response

'

to this letter will be placed in the Public Document Room.

l

The responses directed by this letter (and the accompanying Notice) are not

i

subject to the clearance procedures of the Office of Management and Budget as

required by the Paperwork Reduction Act of 1980, PL 96-511.

,

We will gladly discuss any questions you-have concerning this inspection.

Sincerely,

i

l

c.t...

..

  • ' :'""; D Cncd by C,c, ,' yg 7,,9;

'

C. E. Norelius, Director

Division of Engineering and

Technical Inspection

Enclosures:

1.

Appendix, Notice

of Violation

!

2.

Inspection Reports

No. 50-237/82-02,

No. 50-249/82-01,

!

No. 50-254/82-02,

and No. 50-265/82-02

4

cc w/encls:

Louis 0. DelGeorge, Director

of Nuclear Licensing

i

D. J. Scott, Station

'

Superintendent

N. Kalivianakis, Plant

,

Superintendent

!

DMB/ Document Control Desk (RIDS)

Resident Inspector, RIII

Mary Jo Murray, Office of

i

Assistant Attorney General

RjI k!

RIII

RIII

RIII

RIII

I

!

sny

at

,

-

,

Yin /so f

Knop [db

Littly.

.

Danielson

lus

2[/

E

g}i2!I'

J?/1 M2-

i

2/4/82