ML20049H345

From kanterella
Jump to navigation Jump to search
Slides for SLR Lessons Learned Meeting #3 - 022020_Final
ML20049H345
Person / Time
Issue date: 02/18/2020
From: William Burton
NRC/NRR/DNRL/NLRP
To:
Burton W, NRR-DNRL 415-6332
Shared Package
ML20049H344 List:
References
Download: ML20049H345 (10)


Text

Subsequent License Renewal (SLR)

Lessons Learned Public Meeting #3 February 20, 2020

AGENDA

  • Welcome and Introductions
  • Proposed Industry Revisions to GALL-SLR and SRP-SLR
  • Summary/Next Actions
  • Next Lessons Learned Meeting
  • Embark Venture Studios
  • Closeout and Adjourn 2

Proposed Industry Revisions to GALL-SLR and SRP-SLR High-Priority Revisions

- AMPs XI.M2 and XI.M21A - Water Chemistry Update

- AMP XI.M12: Thermal Aging Embrittlement of CASS

- AMP XI.M16A : MRP-227-1

- AMP XI.M42: Internal Coatings/Linings

- New FE / AMR item: RPV steel supports

- AMP XI.E7: Insulators

- AMPs XI.E3A/B/C: Insulation for Inaccessible Cables

- AMP XI.S1: ASME,Section XI, Subsection IWE *

- AMR items: Table 3.5-1 revisions

- AMR Items: Generic F-J Notes

  • Staff not aligned or under staff review 3

Proposed Industry Revisions to GALL-SLR and SRP-SLR Lower-Priority Revisions

- AMP X.M2: Neutron Fluence Monitoring

- AMP XI.M33: Selective Leaching

- AMP XI.S8: Protective Coatings*

  • Staff not aligned or under staff review 4

NEI Proposed High-Priority Revisions AMR Items: Generic F-J Notes

- Management of reduction of heat transfer for steel fuel oil piping by the Fuel Oil Chemistry Program (XI.M30)

- Management of loss of coating integrity for compressed air steel tanks with internal coatings by the Internal Coatings/Linings for In-Scope Components (XI.M42)

- Management of loss of material for compressed air steel tanks with internal coatings by the Internal Coatings/Linings for In-Scope Components (XI.M42).

- Management of loss of material for nickel alloy strainer components in a fuel oil environment by the Fuel Oil Chemistry Program (XI.M30) and One-Time Inspection Program (XI.M32).

NEI Proposed High-Priority Revisions AMR Items: Generic F-J Notes

- TLAA management of the stainless steel spent fuel pool liner plate fatigue.

- Management of cracking/delamination and loss of material/flaking in subliming compound fireproofing/fire barriers (thermolag, darmatt, and others) by the Fire Protection Program

- Management of cracking/delamination and loss of material/spalling in cementitious fireproofing/fire barriers (Cafecote and others) by the Fire Protection Program (XI.M26)

- Management of cracking/delamination and loss of material/flaking in aluminum silicate fireproofing/fire barriers (kaowool, and others) by the Fire Protection program (XI.M26)

NEI Proposed High-Priority Revisions AMR Items: Generic F-J Notes

- Management of loss of material/wear in elastomers exposed to condensation by the Inspection of Internal Surfaces in Miscellaneous Piping and Ducting Components program (XI.M38)

- Management of loss of material/general, pitting, crevice corrosion in zinc exposed to lubricating oil by the Lubrication Oil Analysis program (XI.M39) and One-Time Inspection program (XI.M32)

- Management of loss of material/general, pitting, crevice corrosion in zinc exposed to a condensation environment by the Inspection of Internal Surfaces in Miscellaneous Piping and Ducting Components program (XI.M38)

NEI Proposed High-Priority Revisions AMR Items: Generic F-J Notes

- Management of loss of material/general, pitting, crevice corrosion in carbon steel, stainless steel, and copper alloy exposed to a treated water environment by Water Chemistry (XI.M2) and One-Time Inspection Program (XI.M32) for GALL-SLR Chapter VII PWR Systems (e.g. CVCS or HVAC).

Next Actions

  • Proposed Industry Revisions

- Draft ISGs for use and comment

- Available 2- 3 months: 30-day comment period

  • Staff-initiated revisions

- Draft revisions available for the next Lessons Learned Meeting

- Draft ISGs for use and comment

- Available 2 - 3 months: 30-day comment period 9

Next Lessons Learned Meeting

  • March/April

- Topics

  • Status of guidance revisions
  • Embark Venture Studios

- Process improvements

- Risk informing SLR reviews 10