ML20045F548

From kanterella
Jump to navigation Jump to search
Notice of Violation from Insp on 930428-0529.Violation Noted:Annual Insp of safety-related Control Room air-conditioning Unit X-03 Had Not Been Accomplished Since Jan 1991
ML20045F548
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 06/30/1993
From:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To:
Shared Package
ML20045F543 List:
References
50-445-93-22, 50-446-93-22, NUDOCS 9307080020
Download: ML20045F548 (2)


Text

.

l r

4 APPENDIX A NOTICE OF VIOLATION r

TU Electric Dockets:

50-445 1

50-446 Comanche Peak Steam Electric Station, Units 1 and 2 Licenses:

NPF-87 l

NPF-89 During an NRC inspection conducted on April 28 through May 29, 1993, a violation of NRC requirements was identified.

In accordance with the " General Statement of Policy and Procedure for NRC Enforcement Actions," 10 CFR Part 2, Appendix C, the violation is listed below:

{

Comant.he Peak Steam Electric Station Technical Specification 6.8.1 states, in part, that written procedures,shall be established, i

implemented, and maintained covering the applicable procedures i

recommended in Appendix A of Regulatory Guide 1.33, Revision 2,

~

February 1978. Appendix A to Regulatory Guide 1.33, paragraph 9a, requires that maintenance that can affect the performance of safety-related equipment be properly preplanned and performed in accordance with written procedures, documented instructions, or drawings appropriate to the circumstances.

Paragraph 9b requires the development i

of preventive maintenance (PM) schedules.

Station Administration Manual Procedure STA-677, Revision 2, " Preventive Maintenance Program," Section 6.4.6, requires that delinquent PM work i

orders be evaluated by plant engineering. A technical evaluation shall i

be issued addressing the effect of the PM's delay on equipment operability.

Contrary to the above, on May 26, 1993, the inspectors identified that I

an annual inspection of the safety-related Control Room Air-Conditioning Unit X-03 had not been accomplished since January 1991, and a technical evaluation had not been issued addressing the effect delaying the PM had on eg'tipment operability.

This is a Seve,'ity Level IV violation.

(Supplement 1) (445/9322-01; 446/9322-01)

Pursuant to the provisions of 10 CFR Part 2.201, TV Electric is hereby required to submit a written statement or explanation to the U.S. Nucir><

i Regulatory Commission, ATIN: Document Control-Desk, Washington, D.C. 20555.

with a copy to the Regional Administrator, Region IV, and a copy to tie NRC Resident inspector at the facility that is the subject of this Notic., w;thir, 30 days of the date of the letter transmitting this Notice of Viola ion (Notice). This reply should be clearly marked as a " Reply to a Noti e of j

c Violation" and should include for each violation:

(1) the reason foi the

~

violation, or, if contested, the basis for disputing the violation; (:' dv l

corrective steps that have been taken and the results achieved; (3) tb corrective steps that will be taken to avoid further violations; and (

+he date when full compliance will be achieved.

If an adequate reply is not received within the time specified in this Notice. an order or demand for f

9307080020 930630 PDR ADOCK 05000445 PDR G

i

l J

1 information may be issued as to why the license should not be modified, i

suspended, or revoked, or why such other action as may be proper should not be taken. Where good cause is shown, consideration will be given to. extending' the response time.

l t

Dated at Arl'ngton, Tex this 3 C ay of A

1993 l

I P

l

)

f h

l l

l I

t 8

l F

)

h I

I 4

f k

?

k i

--, - =

r w

~

e-

~ -

y