APPENDIX A i
.i Houston Lighting & Power Company Dockets:
50-498
'[
South Texas Project, Units 1 and 2 50-499
.i i
Licenses:
]
NPF-80 During an NRC inspection conducted May 10 through June 10, 1993, a violation j
of NRC requirements was identified.
In accordance with the " General Statement of Policy and Procedure for NRC Enforcement Actions," 10 CFR Part 2, t
Appendix C, the violations are listed below:
l Criterion XVI to 10 CFR Part 50, Appendix B, requires, in part, that measures shall be established to assure that conditions adverse to I
quality, such as failures, malfunctions, deficiencies, deviations, defective material, and nonconformances are promptly identified and corrected.
Contrary to the above, prompt corrective actions were not initiated to l
correct a condition that rendered the Qualified Display Processing r
System seismically inoperable. On January 4,1993, a system engineer identified missing seismic fasteners on the card cages and power supply
~
racks of the Qualified Display Parameter. System, but actions to correct this condition were not taken until April 29, 1993.
This is a Severity Level IV violation.
(Supplement I) (498/9321-01)
Although 10 CFR Section 2.201 requires you to submit to this office, within
]
30 days of your receipt of this Notice, a written statement of explanation, we
.l note that significant actions have been initiated, as a result of previous enforcement actions, to address. weaknesses in your corrective action program.
Therefore, no response with respect to this Notice is required.
i Dated at Arlington, Texas, l
this 30th day of June 1993 i