Forwards Insp Rept 50-348/93-08 & 50-364/93-08 on 930416- 0521 & Notice of Violation
ML20045E550
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 06/08/1993
From: Verrelli D
NRC Office of Inspection & Enforcement (IE Region II)
To: Hairston W
Southern Nuclear Operating Co
Shared Package
ML20045E551 List:
References
NUDOCS 9307020190
Download: ML20045E550 (3)


See also: IR 05000348/1993008

Text

.

.

..

.

JUN , 81993

y

,

a

sD

Docket Nos.:

50-348,50-364

License Nos.: NPF-2, NPF-8

i

Southern Nuclear Operating Company, Inc.

ATTN: Mr. W.G. Hairston, III

President and Chief Operating Officer

P. O. Box 1295

Birmingham, AL 35201-1295

Gentlemen:

SUBJECT:

NOTICE OF VIOLATION

(NRC INSPECTION REPORT NOS. 50-348/93-08 AND 50-364/93-08)

This refers to the inspection conducted by G. F. Maxwell of this office on

April 16 through May 21, 1993. The inspection included a review of activities

authorized for your Farley facility. At the conclusion of the inspection, and

at various times during the inspection, the findings were discussed with those

members of your staff identified in the enclosed report.

-]

Areas examined during the inspection are identified in the report. Within

these areas, the inspection consisted of selective examinations of procedures

-l

and representative records, interviews with personnel and observation of

1

activities in progress.

Based on results of this inspection, certain aspects of your activities

appeared to be in violation of NRC requirements as specified in the enclosed

Notice of Violation (Notice).

The violation is of concern to the NRC because

on May 12, the. Unit 1 "1B" diesel generator output breaker "DG08-1" was

racked-out and removed from service'rather than the specified plant tag-

out/ clearance order breaker, the Unit 2 "2B" diesel generator output breaker

"DG08-2".

We understand per discussion between our resident inspector and your plant

management that you plan to further discuss your self-verification program

during a meeting to be scheduled in July 1993 at the Region II offices.

You are required to respond to this letter and follow' the instructions

specified in the enclosed Notice when preparing your response.

In your

response, you should document the specific actions taken and any additional

actions planned to prevent recurrence of the violations.

You should also

address the generic-and programmatic aspects of-this-issue. - After reviewing

your response to the Notice of Violation, including proposed corrective

~

actions and the results of any future inspections, the NRC will determine

whether further NRC enforcement action is necessary to ensure compliance with

NRC regulatory requirements.

In accordance with Section 2.790 of the NRC's " Rules of Practice," a copy of

this letter and its enclosures will be placed in the NRC Public Document _ Room.

The responses directed by this letter and the enclosed Notice are not subject-

9307020190 93060s

i',

PDR

ADOCK 05000348

I ,l

G

PDR

l~EDI

-.

.

-_

.

..

.

JUN , 81993

Southern Nuclear Operating-

2

Company, Inc.

to the clearance procedures of the Office of Management and Budget as required

by the Paper Work Reduction Act of 1980, Pub. L. No.96-511.

Should you have any questions concerning'this letter, please contact us.

-

Sincerely,

-

,

Original signed by:

David M. Verrelli

David M. Verrelli, Chief

Reactor Projects Branch 1

Division of Reactor Projects

Enclosures:

1.

Notice of Violation

2.

NRC Inspection Report

cc w/encls:

B. L. Moore

Manager, Licensing

Southern Nuclear Operating

Company, Inc.

P. O. Box 1295

Birmingham, AL' 35201-1295

R. D. Hill, Jr.

General Manager, Farley Plant

.

Southern Nuclear Operating

Company, Inc.

P. O. Box 470

.Ashford, AL 36312

W. R. Bayne, Supervisor

Safety Audit and Engineering Review

Farley Nuclear Plant

P. O. Box 470

Ashford, AL 36312

State Health Officer

Alabama Department of Public Health

434 Monroe Street

Montgomery ~, AL 36130 1701

James H. Miller, Ill, Esq.

Balch and Bingham

P. O. Box 306

1710 Sixth Avenue North

Birmingham, AL 35201

(cc w/encls con't - See page 3)

l

'

.

. .

.

_

_

.

..

I

Southern Nuclear Operating

3-

M

8 1993

.

,

Company, Inc.

.(cc w/encls cont'd)

Chairman

Houston County Commission

P. O. Box 6406

Dothan, AL 36302

bec w/encls:

Timothy A. Reed, NRR

F. Cantrell, RII

S. Vias, RII

Document Control Desk

NRC Resident Inspector

U.S. Nuclear Regulatory Commission

Route 2, Box 24

Columbia, AL 36319

.

.

9

?

>

.

.

.

.

.

RII:DRP

RII.:DRP

II:D

lU.M11Md{I".

'

RWr ht:tj

FC trell

rre

06/

93

fv]

.

06/g/93

/ /93

,

'

._.__________________________.;

-

.

.

.

m