ML20045E536

From kanterella
Jump to navigation Jump to search
Forwards Insp Repts 50-321/93-07 & 50-366/93-07 on 930503-07 & Notice of Violations
ML20045E536
Person / Time
Site: Hatch  Southern Nuclear icon.png
Issue date: 06/04/1993
From: Stohr J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Hairston W
GEORGIA POWER CO.
Shared Package
ML20045E537 List:
References
NUDOCS 9307020179
Download: ML20045E536 (3)


See also: IR 05000321/1993007

Text

~

'h

'k

f'

.

!0FRGAL RECORD CO

l

JWi 0 (1933

i

Docket Nos. 50-321, 50-366

.

License Nos. DPR-57, NPF-5

Georgia Power Company

-

ATTN: Mr. W. G. Hairston, III

Executive Vice President

Nuclear Operations

,

P. O. Box 1295

Birmingham, AL 35201

Gentlemen:

SUBJECT:

NOTICE OF VIOLATION

(NRC INSPECTION. REPORT N05. 50-321/93-07 AND 50-366/93-07)

.This refers to the' inspection conducted by E. B. Pharr of this office on May 3-7,

1993. The inspection included a review of activities authorized'for your Hatch '

facility. At the conclusion of the inspection, the findings were discussed with

those members of your staff identified in the enclosed report.

Areas examined during the inspection are identified'in the report. Within these

[

areas,- the inspection consisted of selective examinations of procedures and

representative records, interviews with personnel, and observation of activities

-!

'

.in progress.

~

Based on the results of this inspection, certain of your~ activities appeared-to

be in violation of NRC requirements, as specified in the enclosed Notice of

i

Violation (Notice). Although we recognize that you identified'this violation,

the violation is of concern because entries into posted High Radiation Areas-

without the proper radiation monitoring devices or Health Physics LTechnician

,

coverage could lead to-individuals being inadvertently exposed to high levels-of

radiation. Therefore, we have determined to. issue this as a: Severity Level IV

violation.

In addition,' the enclosed Inspection Report identifies activities '

-s

that violated NRC requirements that will not be subject to enforcement action

.

because the licensee's efforts in identifying and/or correcting -the violation

meet the criteria specified in Section VII.B of the Enforcement Policy.

You are required to respond to this letter and should follow the instructions

!

specified in the enclosed Notice when preparing your response. In your response,

you should document-the specific. actions;taken and any -additional actions:you

plan to prevent recurrence.

After reviewing your response ~ to this -Notice,

including your proposed corrective actions and the results of future inspections,

.

3

the NRC will-determine whether further NRC enforcement action is necessary to

ensure compliance with NRC regulatory requirements.

In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of.this.

letter and its enclosures will be placed in the NRC Public Document Room.

-9307020179 930604

,

_PDR

ADOCK 0500

1

{4

g

G

v

l

.

- --

.

-

-

. .

.

- .

N

..

'

'

J[JN 0 41993-

Georgia Power Company

2

.

!

.

~

The responses-directed by this letter and the enclosed Notice are not subject to

the-clearance procedures of the Office of Management and Budget as required by-

the. Paperwork Reduction Act of 1980, Pub. L. No.96-511.

Should you have any questions concerning this letter, please contact us.

Sincerely,

4

/d/6kn

J. Phi' lip Stohr,

irector

Division of Radiation Safety

,

and Safeguards

Enclosures:

1.

Notice of Violation

-

2.

NRC Inspection Report

'

cc w/encls:

J.

T-.

Beckham

Vice President, Plant Hatch

Georgia Power Company

P. O. Box 1295

Birmingham, AL 35201

H. L. Sumner

'l

General Manager, Plant Hatch

Georgia Power Company

Route 1, Box 439

,

Baxley, GA 31513

'

S. J. Bethay

'

Manager Licensing - Hatch

Georgia Power Company

P. O. Box 1295

Birmingham, AL 35201

Ernest L. Blake, Esq.

Shaw, Pittman, Potts and

Trowbridge

2300 N Street, NW

Washington, D. C.

20037

l

,

Charles H. Badger

Office of Planning and Budget

.

Room 610

270 Washington Street, SW

!

'

Atlanta, GA 30334

cc w/encls:

(See page 3)

-

- -

-

-

.b

-.

,

-

.

.l'

JUN 0 g 1993

.

.

~ Georgia Power Comp'any

3

(cc w/encis: cont'd)

Harold Reheis, Director

Department of Natural Resources

~

205 Butler Street, SE, Suite 1252

Atlanta, GA 30334

Thomas Hill, Manager

Radioactive Materials Program

Department of Natural Resources

4244 International Parkway

Suite 114

Atlanta, GA 30354-

Chairman

Appling County Commissioners

County Courthouse

Baxley, GA 31513

Dan H. Smith

Vice President

Power Supply Operations

Oglethorpe Power Corporation

2100 E. Exchange P1 ace

Tucker, GA 30085-1349

Charles A. Patrizia, Esq.

Paul, Hastings, Janofsky. & Walker

12th Floor

1050 Connecticut Avenue, NW

Washington, D. C.

20036

bec w/encls:

K. N. Jabbour, NRR

A. R. Herdt, RII

P. H. Skinner, RII

S. J. Vias, RII

Document Control Desk

NRC Resident Inspector

U.S._ Nuclear Regulatory Commission

Route 1,. Box 725

Baxley, GA 31513

{cDRSS

,pRSS

Q.D)5

RII:DJ1SS

RI DRP

RII

RII:DRSS

'

il

Wy

~

BSA

.

EP arr-

rker

WRan in

WCline

PSkinner

G

s BMallett

6/</93

6/gy93

6/y93

6ff/93

6/4/93

6/g93

6/f/93

=

-

--

-

--

m

- -