x GPU Nuclear Corporation Q
gf Post Office Box 388 Route 9 South Forked River, New Jersey 08731-0388 1
609 971-4000 I
Writer's Direct Dial Number; j
i C321-93-2177 June 14, 1993 d
U.S. Nuclear Regulatory Commission ATTH: Document Control Desk Washington, D.C.
20555
Dear Sir:
Subject:
Oyster Creek Nuclear Generating Station Docket No. 50-219 j
Monthly Operating Report i
In accordance with the Oyster Creek Nuclear Generating Station Operating License No. DPR-16, Appendix A, Section 6.9.1.C, enclosed are two (2) copies of the Monthly Operating Data (gray book information) for the Oyster Creek Nuclear Generating Station.
If you should have any questions, please contact Brenda DeMerchant, Oyster Creek Licensing Engineer at (609) 971-4642.
Sincerely, J.J. Bar en p # Vice President and Director t
Oyster Creek JJB/BDEM: Jc Attachment (MOR-RPT.MAV) cc:
Administrator, Region 1 Senior NRC Resident Inspector Oyster Creek NRC Project Manager 9306220186 930531 PDR ADOCK 05000219 O
R PDR
[1
/ p GPU Nuclear Corporation is a subsidiary of General Pubhc Utrut es Corporation j
SUMMARY
MAY. 1993 Oyster Creek entered May operating at full power.
On May 8, power was reduced to perform the Main Steam Isolation Valve full closure surveillance. The plant returned to full power at 2100 hours0.0243 days <br />0.583 hours <br />0.00347 weeks <br />7.9905e-4 months <br /> the same day. On May 19, power was reduced by 5% for two hours due to an inadvertent scram of control rod 18-31. After the rod was restored, the plant returned to full power. The plant maintained full power operation for the remainder of the month.
i I
tLONTHLY OPERATING REPORT LICENSEE EVENT REPORTS The following Licensee Event Reports were submitted during the month of May, 1993:
None i
n
-~.
~
- _ =. - -
.~
Oyster Creek Station #1 Docket No. 50-219 REFUELING INFORMATION - MAY, 1993 Name of Facility: Oyster Creek Station #1 Scheduled date for next refueling shutdown: Currently projected for September, 1994 Scheduled date for restart following refueling: Currently projected for December,1994 Will refueling or resumption of operation thereafter require a Technical Specification change or other license amendment?
No Important licensing considerations associated with refueling, e.g.,
new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures 1.
General Electric Fuel Assemblies Fuel design and performance analysis methods have been approved by the NRC.
The number of fuel assemblies (a) in the core 560
=
(b) in the spent fuel storage pool 1878
=
(c) in dry storage 8
=
The present licensed opent fuel pool storage capacity and the size of any increase in licensed storage capacity that has been requested or is planned, in number of fuel assemblies:
Present Licensed capacity:
2600 The projected date of the last refueling that can be discharged to the spent fuel pool assuming the present licensed capacity:
1 Based on a projected reload of 184 bundles, full core discharge capacity to the spent fuel pool will be lost after the 15R refueling outaga (December, 1994).
NRC_RPT.WPD
,,. -, _. _.~
OPERATING ~ DATA REPORT OPERATING STATUS
- 1. DOCKET:
50-219
- 2. REPORTING PERIOD:
05/93 3
- 3. UTILITY CONTACT:
JIM KRALL (609)971-4115
- 4. LICENSED THERMAL POWER (MWt):
1930 S. NAMEPLATE RATING (GROSS MWe):
687.5 x 0.8 = 550
- 6. DESIGN ELECTRICAL RATING (NET MWe):
650 7.
MAXIMUM DEPENDABLE CAPACITY (GROSS MWe):
632
- 8. KAXIMUM DEPENDABLE CAPACITY (NET MWe):
610
- 9. IF CHANCES OCCUR ABOVE SINCE LAST REPORT, GIVE REASONS:
NONE
- 10. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWe):
NONE
- 11. REASON FOR RESTRICTION, IF ANY:
NONE MONTH XEAB CUMULATIVE'
- 12. REPORT PERIOD HOURS 744.0 3623.0 205463.0
- 13. HOURS RX CRITICAL 744.0 2553.6 134462.0 l
- 14. RX RESERVE SHUTDOWN HRS 0.0 0.0 918.2=
l
- 15. HRS GENERATOR ON-LINE 744.0 2517.4 131064.7
- 17. GROSS THERM ENERGY (MWH) 1420277 4787118 223255753
- 18. GROSS ELEC ENERGY (MWH) 474123 1607886 75004024
- 19. NET ELEC ENERGY (MWH) 456772 1544013 71979529
- 20. UT SERVICE FACTOR 100.0 69.5 63.8
- 21. UT AVAIL FACTOR 100.0 69.5 64.4
- 24. UT FORCED OUTAGE RATE 0.0 0.0 10.9
- 25. FORCED OUTAGE HRS 0.0 0.0 15957.3
- 26. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, DURATION):
NONE
- 27. IF CURRENTLY SHUTDOWN, ESTIMATED STARTUP DATE:
N/A NRC_RPT.WPD-
AVERAGE DAILY POWER LEVEL NET MWe 5
DOCKET #.
.50-219 UNIT.
. OYSTER CREEK #1 REPORT DATE.
. 06-02-93 I
COMPILED BY.
. JIM KRALL TELEPHONE #.
.609-971-4115 l
1 i
l MONTH:
MAY, 1993 i
l DAX E
Dal M
1.
624 16.
617 1
2.
624 17.
618 i
3.
624 18, 618 4.
625 19.
620 5.
623 20.
622 6.
621 21.
623 j
7.
622 22.
623 8.
428 23.
623 9.
620 24.
620 10.
619 25.
616 11.
620 26.
619 12.
618 27.
620 13.
619 28.
619 l
14.
620 29.
617 15.
618 30.
618 31.
614 NRC_RPT.WPD
b l' NIT SHt'T'iG35 AND 7%TR REDUCTIONS DOCKET NO:
50-219 UNIT NAME:
O? ster Creek DATE:
June 2e 1993 COMPLT'D BY:
David Enan TELETBONE:
971-5818 RIPORT HONTHt Mar 1993 TTPE METHOD OF SHUTTING CORRECTIVE No.
DATE F: Terced DURATION REASON (1)
DOWN THE REACTOR OR ACTIONS / COMMENTS Sr Scheduled (hours)
REDUCING POWER (2) 1 930508 5
0 b
1 Power was manually reduced to 401 to -
perform the Main Steam Isolatten Valve full elosure test.
4 i
i i
I f
SUMMARY
(1) REASON (2) METROD
- s. - Equipment Failure (Explain)
- e.
Operator Training L 1.Lc Enam 1.
Manual-l b.
Hsintenanes or Test
, f.' Administrative 2.
Manual Scram c.
Refueling g.
Operational Error (Explain) 3.
Regulatory Restriction h.
Other.(ExplaLn) 4 Other (Explain)
-m---m.--