Text
'
.(.-
t i
Tennessee Vaney Authytty. Post Ofhce Box ?2rJ. Soody-ia sy, Tennessee 373742000
'(
b Robert A. Fenech Vce Prescent, Sequoyah Nuclear Plant i
June 14, 1993 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555 Gentlemen:
In the Matter of
)
Docket Nos. 50-327
)
50-328 l
Tennessee Valley Authority SEQUOYAH NUCLEAR PLANT (SQN) - MAY 1993 MONTHLY OPERATING REPORT Enclosed is the May 1993 Monthly Op-rating Report as required by SQN Technical Specification 6.9.1.10.
If you have any questions concerning this matter, please call l
J. W. Proffitt at (615) 843-6651.
Sincerely, 4- ^ #
.y Robert A. Fenech Enclosure cc: See page 2 I
h 1
l' i
h 9306170369 930531 L 7
/r h 1
PDR. ADDCK 05000327 l
1
?
R pan t.
a y'
{s
.t
f P
U.S. Nuclear Regulatory Commission Page 2 June 14, 1993 I
cc (Enclosure):
INPO Records Center Institute of Nuclear Power Operations l
700 Galleria Parkway
?
Atlanta, Georgia-30339-5957 j
Mr. D. E. LaBarge, Project Manager i
U.S. Nuclear Regulatory Commission One White Flint, North 11555 Rockville Pike Rockville, Maryland 20852-2739 Mr. Ted Marston, Director i
Electric Power Research Institute r
P.O. Box 10412 Palo Alto, California 94304 t
NRC Resident Inspector Sequoyah Nuclear Plant 2600 Igou. Ferry Road.
Soddy-Daisy, Tennessee 37379-3624 Regional Administration U.S. Nuclear Regulatory Commission i
Office of Inspection and Enforcement Region II 101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30323-2711
(
Regional Administrator i
U.S. Nuclear Regulatory Commission Region II 101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30323-2711 Mr. F. Yost, Director Research Services Utility Data Institute 1700 K Street, NW, Suite.400 Washington, D.C. 20006-3800 l
i l
j l
TENNESSEE VAY1RY AUTHORITY NUCIEAR POWER GROUP
'i
-i SEQUOYAH NUCIEAR FIANT
~i j
I i
MONTHLY OPERATING REPORT TU THE l
r NUCLEAR REGUIATORY CGWIISSIGt F
IMI 1993 i
.'l t
>1 i
7 UNIT 1-t I
DOCKET NUMBER 50-327 LICENSE NIMBER DPR-77
. i
-i I
r F
UNIT 2 DOCKET NIMBER 50-328 i
LICENSE NIMBER DPR-79 l
f f
-. i l
?
t I
i
'. i r
l l
t t;
l t
ht
?
e
l OPERATIONAL
SUMMARY
MAY 1993 IINIT 1 4
Unit I remained in "no mode" the entire month of May as the Unit 1 Cycle 6 refueling outage continued. The scheduled date for generator synchronization is August 23, 1993.
t UNIL2 Unit 2 remained in Mode 5 during the entire month of May as a result of outage activities. The outage began on March 1, 1993, as a result of erosion / corrosion problems on the secondary side piping. The scheduled date for generator synchronization is July 26, 1993.
I m
POWER-OPERATED RELIEF _YAlVES (PORVs) AND SAFETY VALVES
SUMMARY
There were no challenges to PORVs or safety valves in May.
R 1
I i
i
+
?
t 5
I AVERACE DAILY UNIT POWER LEVEL i
DOCKET NO.
50-327.
UNIT No.
One DATE:
,76-04-93 COMPLETED BY:
T. J. Ilollomon TELEPHONE:
(615) 843-7528 MONTH:
__t%Y 1993 J
AVERAGE DAILY POWFR LEVEL AVERAGE DAILY POWER LEVEL DAY (fee-Net)
DAX (MWe-Net) 1
-5 17
-5 2
-7 18
-5 3
-5 19
-5 9
4
-7 20
-10 5
-8 21
-8 6
-8 22
-3 7
-8 23
-6 8
-7 24
-6 9
-4 25 5
i 10
-4 26
-7 11
-4 27
-5 i
12
~3 28
-3 13
-5 29
-7 14
-5 30
-5 3
15
-6 31
-3 16
-5 i
l l
+
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
__.5D-328 UNIT No.
Two DATE: _Q6-04-93 COMPLETED BY:
T. J. Hollomon TELEPHONE: Ifil5) 843-7528 MONTH:
MAY 1193 AVERAGE DAILY POWER LEVEL AVERAGE DAILY POWER LEVEL DAY (MWe: Net)
DAY (MWe-Het) 1
-7 17
-7 2
-5 18
-9 3
-2 19
-7 4
-7 20
-5 S
-5 21
-2 6
-5 22
-2 7
-2 23
-2 8
-2 24
-2 9
-1 25
-2 10
-1 26
-2 11
-2 27
-7 12
-2 28
-5 13
-2 29
-2 14
-2 30
-5 t
15
-8 31
-2 16
-8 j
l
OPERATING DATA REPORT DOCKET NO.
50-327 DATE 06/04/93 COMPLETED BY L J. Hollomon_
TELEPHONE (615) 843-7528 QEERATING STATUS j
l Notes
-l 1.
Unit Name: __1gguaysh Unit One l
l 2.
Reporting Period: _Egy 1993 l
l 3.
Licensed Thermal Power (MWt): 3411.0 l
l 4
Nameplate Rating (Gross MWe): 1220.6 l
l S.
Design Electrical Rating (Net MWe): 1148.0 l
l 6.
Maximum Dependable Capacity (Gross MWe): 1162.0 l
l 7.
Hsximum Dependable Capacity (Net MWe): 1122.0 1
1 8.
If Changes Occur in Capacity Ratings (Item Numbers 3 Through 7) $1nce last Report, Give Reasons:
9 Power Level To Which Restricted, If Any (Net MWe):
N/A
- 10. Reasons for. Restrictions, If Any:
N /A.
This Month Yr-to-Date Cumulative
- 11. Hours in Reporting Period 744 3.623 104.472
- 12. Number of Hours Reactor Was Critical Q_
1.281.3 SE.029
?
- 13. Reactor Reserve Shutdown Hours 0
0 0
- 14. Hours Generator On-Line 0
1.22Q,h_
542H28.5.
- 15. Unit Reserve Shutdown Hours 0
0 0
- 16. Gross Thermal Energy Generated (MWH) 0 3.915.2021E_
.178.893.754-
- 17. Gross Electrical Energy Generated (MWH) 0
...1.35B E 0 _.
_50.702.614 i
- 18. Het Electrical Energy Generated (MWH)-
-3/024 1.285.215 58.207.437
- 19. Unit Service Factor 0
33.7 S2.5
- 20. Unit Availability Factor 0-33.7 52.5
- 21. Unit Capacity Factor (Using MDC Net)
,0,4
-31.6 49.7 i
I
- 22. Unit Capacity Factor (Using DER Net)
-0.4 30.9 48.5
- 23. Unit forced Outage Rate 0
47.5 38.7
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each): '
L h
- 25. If Shut Down At End Of Report Period, Estimated Pate of Startup: __ August. 23. 1993 4
'l i
t I
t I
r
'I r
i
- - - ~
=... _
5 OPERATING DATA REPORT'
,i DOCKET NO. _50-328 j
DATE 06/04/91 l
COMPLETED BY - T. J. HolloMD._ -
.[
TELEPHONE (6151 843-7528 i
QEEEhllM_$1A1113 l Notes l
1.
Unit Name: _ $12ygyah Unit Two l
l.
2.
Reporting Period: Hav 1993 l
.l 3.
Licensed Thermal Power (HWt): 3411.0 l
l 4
Nameplate Rating (Gross HWe): 1220.6 l
l.
5.
Design Electrical Rating (Net HWe): 1148.0 l
l
'i f>. Maximum Dependable Capacity (Gross HWe): _j162.0 l
l 7.
Maximum Dependable Capacity (Net HWe): _.ll22J l
l-D.
If Changes Occur in Capacity Ratings (Item Numbers 3 Through 7) Since Last Report, Give Reasons:
'?I i
9.
Power Level To Which Restricted, if Any (Net HWe):
N/A
- 10. Reasons for Restrictions. If Any:
N/A
}
t i
f This Month-Yr-to-Date Cumulative.
- 11. Hours in Reporting Period 744 3.623 96.432
- 12. Number of Hours Reactor Was Critical 0
1.291.9 57.505
- 13. Reactor Reserve Shutdown Hours 0
0
'O
- 14. Hours Generator On-Line D
1.158 2_
56.235.6
- 15. Unit Reserve Shutdown Hours 0
0 0
16 Gross Thermal Energy Generated (HWH) 0 3.773.305.1
_126..SSLDB4
}
- 17. Gross Electrical Energy Generated (HWH) 0
.. 1.283,783......
,_bL006.902-
- 18. Net Electrical Energy Generated (HWH)
-4.812 1.216.346 57.431.621
(
- 19. Unit Service factor 0
32.0' 58.3 l
- 20. Unit Availability factor 0
32.0-58.3'
- 21. Unit Capacity factor (Using HDC Net)
-0. 6._
29.9 5 3,.1_.
- 22. Unit Capacity Factor (Using DER Net)
-0 6 29.2 51J _,
f
- 23. Unit forced Outage Rate 100.0 68.0
'34d_'
l
- 24. Shutdowns Scheduled Over Next 6 Honths (Type Date, and Duration of Each):
l-f 1
- 25. If Shut Down At End Of Report Period, Estimated Date of Startup: Jul126. 1993 i
i l
l-
DCCttET NO:
50-327 O'4IT SHUTDOWNS AND POWER REDUCTIONS UNIT NAME:
One DATE:
06/04/93 REPORT MONTH:
MAY 1993 COMPLETED BY:T. J. Hollorgn TELEPHONE:16151 843-7523 Method of Licensee Cause and Corrective Duration Shuttina Down Event System Component Action to I
2 3
4 5
No.
Date Type (Hours)
Reason Reactor Report No.
Code Code Prevent Recurrence
-4 930501' F-744 C
4 N/A N/A N/A The Unit 1 Cycle 6 refueling outage continued through the end of May.
d i
y f
l i
l
~~~
I: Forced g,,3nn Method:
Exhibit G-Instructions 2
c3 F
l-5: Scheduled A-Equipment Failure (Explain)
.1-Manual for Preparation of Data l
B-Haintenance or Test 2-Manual Scram Entry sheets for Licensee l-C-Refueling:
3-Automatic Scram Event Report (LER) File l
D-Regulatory Restruction 4-Continuation of Existing Outage (NUREG-1022)
E-Operator Training and License Examination 5-Reduction F-Administrative 9-Other 5
'G-Operational Error (Explain).
Exhibit I-Same Source H-Other (Explain) i
. _ _ _ _ _ _ _ _ _ _ _ _ _. _ _. _ _ _ _. ~... _ _,. -
4.., - -
vm**,...-,,
,<,.......,_m...
,.. _. ~.,,, -.
DOCKET NO: 328
-UNIT SHUTDOWNS AND POWER REDUCTIONS UNIT NAME:
Two DATE:
06/04/93-REPORT MONTH: MAY 1993 COMPLETED BY:T. J. Holloma -
r TELEPHONE:(615) 843-7528 Method of Licensee Cause and Corrective Duration Shutting Down Event System Component Action to l
2 3
4 5
No.
Date Type (Hours)'
Reason Reactor Report No.
Code Code Prevent Recurrence 3
930501 F-744 A
4 328/93001 TL EXC Unit 2 remained in the forced outage through the end of May.
I: Forced Reason:
Hethod:
Exhibit G-Instructions 2
3 F
S: Scheduled-A-Equipment Failure'(Explain) 1-Manual for Preparation of Data B-Maintenance or. Test 2-Manual Scram Entry sheets for Licensee C4efueling 3-Automatic Scram Event Report (LER) File -
D-Regulatory Restruction 4-Continuation of Existing Outaga -
E-Operator. Training and License Examination 5-Reduction F-Administrative 9-Other 5
G-Operational Error (Explain)
Exhibit I-Same Source
.H-Other (Explain)-
l-L
_