Forwards Rev 19 to McGuire Nuclear Station IST Program, Unit 1 & Rev 14 to McGuire Nuclear Station Pump & Valve IST Program, Unit 2
ML20045B265
Person / Time
Site: Mcguire, McGuire  Duke Energy icon.png
Issue date: 06/04/1993
From: Mcmeekin T
DUKE POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20045B266 List:
References
NUDOCS 9306170096
Download: ML20045B265 (7)


Text

&

t' Dukeibuer Company T C ikttm CcGuire Nuclear Generation Departrnent Vice President 12700 Hagers Ferry Road (MG01A) (704)675-4800 Hunterwille, NC 23078-898S G04)STS 4809 fu DUKEPOWER June 4, 1993 U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D. C. 20555 0

Subject:

McGuire Nuclear Station, Units 1 and 2 Docket Nos. 50-369 and 50-370 Inservice Testing Plan (IST)

Revision 19 (Unit 1) and Revision 14 (Unit 2)

McGuire Pump and Valve IST program Manual Dear Sir; For your information, please find attached (attachment 2) updates to the McGuire Pump and Valve IST program Manual.

This update provide recent changes that have been made to our IST program. The following is a brief synopsis of the changes made, a more detailed explanation of the changes is provided in attachment 1:

1) The frequency of testing valves changed from quarterly to cold shutdown,
2) The frequency of testing valves changed from cold shutdown to quarterly,
3) Added valves to the program to be tested,
4) Editorial changes made to correct past documentation errors,
5) Deleted valves from the program due to modifications made to the plant,
6) Deleted previous relief requests from the program due to relief not approved by the NRC and due to modifications made to the plant,
7) Updated the cold shutdown justification for several valves.

1

{

9306170096 930604 / I PDR ADDCK 05000369 s P PDR '"[U*'

\

n,wwwwwmn

l_

,(:  :,;

L

[ U..S.' Nuclear Regulatory Commission June 4, 1993 page 2-Please note that'this update affects both units at McGuire Nuclear Station. As such, Revision 19 is the current revision for Unit I and Revision 14 is the current revision for Unit 2. The effective date for these changes as provided by this submittal was March 11, 1993.

There are no request from relief from code requirements included with this submittal. This submittal is provided for your information only, no NRC action is requested.  :

Please contact' Paul Guill at (704) 875-4002 if there are any  !

questicas regarding this submittal.  :

i Very truly yours, i I

,ff /r' 5 T. C. McMeekin '

\

i xc: Mr. S. D. Ebneter  !

Regional Administrator, Esgion II  ;

U. S. Nuclear Regulatory Commission '

101 Marietta Street, NW, Suite 2900  ;

Atlanta, Georgia 30323  !

Mr. P. K. Van Doorn i Senior NRC Resident Inspector, McGuire McGuire Nuclear Station '

Mr. Victor Nerses, Project Manager  ;

Office of Nuclear Reactor Regulation '

U. S. Nuclear Regulatory Commission One White Flint _ North, Mail Stop 9H3 L Washington, D.C. 20555 ,

I John C. Brooks, Commissioner of Labor Attention: Director , Boiler & Pressure Vessel Division Department of Labor State of North Carolina ,

4 West Edenton Street  !

Raleigh, North Carolina 27601 '

i

[

d I

.e

)

U. S. Nuclear Regulatory Commission -

June 4, 1993 page 3 -

bec With Attachments R. O. Sharpe P. F. Guill T. D. Curtis M. D. Rains J. G. Heffner G. A. Copp (NS)

E. E. Hite (NS)

File: 801.01

\pfgD95.nrc' I

f f

F s

i k

J

  1. f h

Attachment 1 l McGuire Unit 1 and Unit 2 program revisions.  :

Page 1 of 3  !

Note: Revisions are for both units unless indicated otherwise.

f

1. Data Sheets f

a) 2NI-0103A i Moved valve to cold shutdown frequency testing. PIR 0-M90-0108 identified this valve makes both trains of High Pressure injection inoperable when it is i closed. Unit 2 only, Unit 1 valve was moved to cold shutdown with the recent  ;

Unit 1 ten year interval update.  !

I b) 2NI-0115B j Moved valve to cold shutdown frequency testing. PIR 0-M90-0108 identified [

this valve makes both trains of Safety injection inoperable when it is closed. i Unit 2 only, Unit 1 valve was moved to cold shutdown with the recent Unit 1 ten year interval update. ,

~

c) 2NI-0332A, 2NI-03338, 2NI-0334B Moved valves to cold shutdown frequency testing. PlR 0-M90-0108 identified these valves make both trains of High Pressure injection inoperable when they i are closed. Unit 2 only, Unit 1 valves were moved to cold shutdown with the  ;

recent Unit 1 ten year interval update.

d) 2NI-0430A, 2Ni-0431 B  !

Valves moved to quarterly testing, taken off cold shutdown testing list. These f' valves were justified previously for cold shutdown testing due to the piping and valves downstream not being qualified and tested for isolation. Modifications  ;

to this piping now allow testing of the downstream check valves, and therefore  ;

these Ni valves do not provide the final barrier between the safety related ,

piping and the non safety portion. Unit 2 only, Unit 1 valves were moved to quarterly testing frequency with the ten year interval update.

e) NV-0143

{

Valves added to the test program as a result of VIL-W 93-02, Westinghouse letter NSL-92-012. This letter identified a possible leak path during recirculation flow from RHR pumps through the check valve, through relief valve NV-482 and into the Volume Control Tank. This chec!( valve will be tested at cold shutdown trequency, and will be verified for movement test I closed. The open function of this valve is not safety related. This applies to I both Unit 1 and Unit 2. j

e 1

=

g }

i 1

Attachment 1 (cont) l Page 2 of 3 i i

f) 2NM-0006AC, 2NM-0026B Added t.eak Test (g . fueling to Test Requirement #2. These valves were  :

I always in the leak te,. program, reviewing the data sheets revealed they were not indicated correctly. A past review of the old submittals indicated that ,

between revision 6 and revision 7 for Unit 2, the Leak Test requirement was ' -

omitted. This corresponds to a manual format change at that time. Unit I has always been correct.

g) 2RN-0994 Valve incorrectly references flow diagram 2574-2.1. The valve is actually shown on 2574-3.1. Data sheet revised to reflect this. Identified by RN SITA  :

Audit. Applies to Unit 2 only, h) 2VI-0135, 2VI-0136, 2VI-0137, 2VI-0138, ,

2VI-0139, 2VI-0140, 2VI-0141, 2VI-0142, Valves deleted from program. Modification MEVN 3134 deleted the air assist to close the Main Steam isolation Valve function, thereby eliminating the need for these check valves to be tested. Unit 1 previously revised for the same modification to those valves.

2. General Relief Requests Deleted General Relief (IV). This general relief was not approved by the NRC, and is not being re-applied for. The relief from trending of EMO valves without automatic signals was never implemented at McGuire. The corresponding Unit 1 general relief was eliminated during the Unit 1 ten year interval update. This item applies to Unit 2 only.
3. Specific Relief Requests RR-Vl3 Relief request deleted since the valves associated with it were removed from the test program.
4. Cold Shutdown Justifications a) CS-NI4 Revised to include valve 2Ni-1158. Applies to Unit 2 only. ,

b) CS-N122 New shutdown justification for 2NI-103A. Applies to Unit 2 only.

4 gs i

P i

Attachment 1 (cont)  !

Page 3 of 3 l 5

c) CS-N123 '

New shutdown justification for 2NI-332A and 2NI-3338. Applies to Unit 2 l only.  ;

d) CS-NI24 l New shutdown justification for 2NI-3348. Applies tc Unit 2 only. }

e) CS-N!2 ,

t Shutdown justification deleted since valves 2NI-430A and 2NI-4318 were j meved to quarterly testing frequency Applies to Unit 2 only.  ;

f) CS-NV14 (Unit 1), CS-NV18 (Unit 2) i New shutdown lustification for NV-143. Different numbers between the units  ;

because Unit 1 shutdown justifications were re-written and deleted  !

justifications eliminated at the ten year interval update. Unit 2 justifications will !

be changes at its ten year update to match the Unit 1 numbers. >

l r

f I

4 a

i d

i Nn g ir appropriate sections l

I J

%  !