Document Control Desk NRC MONTHLY OPERATING REPORT DOCKET NO: 50-361 UNIT NAME: SONGS - 2 DATE:
COMPLETED BY: J. L. Darlina TELEPHONE: (714) 368-6223 ,
OPERATING STATUS
- 1. Unit Name: San Onofre Nuclear Generatina Station, Unit 2 Reporting Period: May 1993 2.
- 3. Licensed Thermal Power (Mwt): 3390
- 4. Nameplate Rating (Gross MWe):
1127
- 5. Design Electrical Rating (Net MWe): 1070
- 6. Maximum Dependable Capacity (Gross MWe): 1127 l
- 7. Maximum Dependable Capacity (Net MWe): 1070
- 8. If Changes Occur In Capacity Ratings (Items Number 3 Through 7)
Since Last Report, Give Reasons: NA
- 9. Power Level To Which Restricted, If Any (Net MWe): NA
- 10. Reasons For Restrictions, If Any: NA This Month Yr.-to-Date Cumulative
- 11. Hours In Reporting Period 744.00 3,623.00 85,800.00
- 12. Number Of Hours Reactor Was Critical 744.00 3,623.00 64,357.36
- 13. Reactor Reserve Shutdown Hours 0.00 0.00 0.00
- 14. Hours Generator On-Line 744.00 3,623.00 63,280.27
- 15. Unit Reserve Shutdown Hours 0.00 0.00 0.00
- 16. Gross Thermal Energy Generated (MWH) 2,522,349.10 12,009,636.36 206,829,484.68
- 17. Gross Electrical Energy Generated (MWH) 845,719.00 4,053,044.50 70,098,604.50
- 18. Net Electrical Energy Generated (MWH) 806,475.00 3.859,302.00 66,466,817.83
- 19. Unit Service Factor 100.00% 100.00% 73.75%
- 20. Unit Availability Factor 100.00% 100.00% 73.75%
- 21. Unit Capacity Factor (Using MDC Net) 101.31% 99.55% 72.40% ,
- 22. Unit Capacity Factor (Using DER Net) 101.31% 99.55% 72.40% >
- 23. Unit Forced Outage Rate 0.00% 0.00% 6.51% i
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each): i Refuelina shutdown, June 5, 1993 Duration (77 days)
- 25. If Shutdown At End Of Report Period, Estimated Date of Startup: NA ,
- 26. Units In Test Status (Prior To Commercial Operation): Forecast Achieved INITIAL CRITICALITY NA NA INITIAL ELECTRICITY NA NA COMMERCIAL OPERATION NA NA i
mor.may/2 9306170014 930614 PDR R
ADOCK 05000361 PDR
Document Control Desk AVERAGE DAILY UNIT POWER LEVEL DOCKET NO: 50-361 UNIT NAME: SONGS - 2 DATE:
COMPLETED BY: J. L. Darlica TELEPHONE: (714) 365-6223-MONTH: May 1993 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) 1 1027.25 16 1095.75 2 1084.79 17 1090.67 3 1081.33 18 1094.25 4 1080.71 19 1094.71 5 1079.96 20 1092.88 6 1081.58 21 1079.83 7 1052.75 22 1089.67 8 1028.79 23 1088.17 9 1086.79 24 1087.46 10 1087.17 25 1089.54 11 1087.25 26 1091.38 12 1092.58 27 1093.33 13 1097.79 28 1083.04 14 1098.50 29 1090.50 t
15 1092.50 30 1091.63 31 __
1090.58 mor.may/3 l
Document Control. Desk UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO: 50-361 -
UNIT NAME: SONGS - 2 REPORT MONTH: May 1993 DATE: '
COMPLETED BY: J. L. Darlina TELEPHONE: (714) 368-6223 Method of Shutting Cause & Corrective Duration Down LER System Component Action to No. Date Type l (Hours) Reason z
Reactor 3 No. Code' Code' Prevent Recurrence There were no shutdowns or power reductions this reporting period.
1 2 2 F-Forced Reason: Method: "IEEE Std 805-1984 S-Scheduled A-Equipment Failure (Explain) 1-Manual B-Maintenance or Test 2-Manual Scram. S IEEE Std 803A-1983 C-Refueling 3-Automatic Scram.
0-Regulatory Restriction 4-Continuation from E-Operator Trainir.g & License Examination Previous Month F-Administrative 5-Reduction in the Average G-Operational Error (Explain) Daily Power Level of more H-Other (Explain) than 20% from the previous day 6-Other (Explain) mor.may/4 u _ _ _ _ _ _ _____ _ _ ____. _ _ _ _ _ __ _ ._ . - - _ _
Document Control Desk
SUMMARY
OF OPERATING EXPERIENCE FOR THE MONTH DOCKET N0: 50-361 UNIT NAME: SONGS - 2 DATE:
COMPLETED BY: J. L. Darlina TELEPHONE: (714) 368-6223 Date Time Event May 1 0001 Unit is in Mode 1, 100% reactor power, 1135 MWe.
May 7 2002 Commenced reactor power decrease to 80% to perform circulating water pump bumping (Momentary stopping of circulating water pumps to clear debris from
- water box tubesheets).
May 8 0010 Unit at 80% reactor power, 893 MWe.
0400 Commenced reactor power increase to 100% after bumping all four circulating water pumps.
0945 Unit at 100% reactor power. ,
May 31 2400 Unit at 100% reactor power, 1140 MWe.
mor.may/5
Document Control Desk REFUELING INFORMATION DOCKET NO: 50-361 UNIT NAME: SONGS - 2 DATE:
COMPLETED BY: J. L. Darlino TELEPHONE: (714) 368-6223 MONTH: May 1993 i
- 1. Scheduled date for next refueling shutdown.
Cycle 7 refueling outage is forecast for June 5,1993.
- 2. Scheduled date for restart following refueling.
Restart from Cycle 7 refueling outage is forecast for August 1903.
- 3. Will refueling or resumption of operation thereafter require a Technical Specification change or other license amendment?
Yes. -
What will these be?
The following Technical Specification change is desired in support "
of work being performed during the Unit 2 Cycle 7 refueling outage.
A change has been requested to Technical Specification 4.4.5.2.1 to allow a delay in performing an RCS inventory balance during plant transients. Although not required, NRC approval of this change is desired prior to startup from the Unit 2 Cycle 7 outage.
- 4. Scheduled date for submitting proposed licensing action and supporting information.
l Proposed Change on RCS Leakrate was submitted November 20, 1992.
- 5. Important licensing considerations associated with refueling, e.g. new or different fuel design or supplier, unreviewed design or performance analysis ,
methods, significant changes in fuel design, new operating procedures. ;
None. >
mor.may/6 i
Document Control Desk i
REFUELING INFORMATION DOCKET NO: 50-361 l UNIT NAME: SONGS - 2 DATE:
COMPLETED BY: J. L. Darlino TELEPHONE: (714) 368-6223 i
MONTH: May 1993
- 6. The number of fuel assemblies.
a) In the core. 217 In the spent fuel storage pool.
b) 662 (484 Unit 2 Spent Fuel Assemblies.108 New fuel Assemblies, 70 l Unit 1 Spent Fuel Assembl ies . )
- 7. Licensed spent fuel storage capacity. 1542 Intended change in spent fuel storage capacity. None
- 8. Projected date of last refueling that can be discharged to spent fuel storage pool assuming present capacity.
Approximately 2005 (full off-load capability)
Date revised to provide a closer approximation of full off-load - .
capability.
9 t
l mor.may/7
'I
Document Control Desk NRC MONTHLY OPERATING REPORT DOCKET NO: 50-362 UNIT NAME: SONGS - 3 DATE:
COMPLETED BY: J. L. Darlina TELEPHONE: (714) 368-6223 OPERATING STATUS
- 1. Unit Name: San Onofre Nuclear Generatina Station Unit 3
- 2. Reporting Period: May 1993
- 3. Licensed Thermal Power (MWt): 3390
- 4. Nameplate Rating (Gross MWe): 1127
- 5. Design Electrical Rating (Net MWe): 1080
- 6. Maximum Dependable Capacity (Gross MWe): 1127 l
- 7. Maximum Dependable Capacity (Net MWe): 1080
- 8. If Changes Occur In Capacity Ratings (Items Number 3 Through 7) '
Since Last Report, Give Reasons: NA
- 9. Power Level To Which Restricted, If Any (Net MWe): NA
- 10. Reasons For Restrictions, If Any: NA This Month Yr.-to-Date Cumulative
- 11. Hours In Reporting Period 744.00 3,623.00 80,351.00 i
- 12. Number Of Hours Reactor Was Critical 744.00 3,566.97 62,766.73 :
- 13. Reactor Reserve Shutdown Hours 0.00 0.00 0.00
- 14. Hours Generator On-Line 744.00 3,543.50 61,149.56 !
- 15. Unit Reserve Shutdown Hours 0.00 0.00 0.00 !
- 16. Gross Thermal Energy Generated (MWH) 2,443,620.00 11,672,358.20 196,306.432.44
- 17. Gross Electrical Energy Generated (MWH) 849,178.00 4,010,478.00 66,637,338.00
- 18. Net Electrical Energy Generated (MWH) 808,493.00 3,810,258.00 62,955,928.36
- 19. Unit Service Factor 100.00% 97.81% 76.10%
- 20. Unit Availability Factor 100.00% 97.81% 76.10%
- 21. Unit Capacity Factor (Using MDC Net) 100.62% 97.38% 72.55%
i
- 22. Unit Capacity Factor (Using DER Net) 100.62% 97.38% 72.55% .
- 23. Unit Forced Outage Rate 0.00% 2.19% 7.17%
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
Refuelina shutdown, October 9, 1993, duration 85 days.
- 25. If Shutdown At End Of Report Period, Estimated Date of Startup: NA i
- 26. Units In Test Status (Prior To Commercial Operation): Forecast Achieved INITIAL CRITICALITY NA NA :
INITIAL ELECTRICITY NA NA COMMERCIAL OPERATION NA NA r
mor.may/8 i i
i Dodument Control Desk :
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO: 50-362 -
UNIT NAME: SONGS - 3 DATE: >
COMPLETED BY: J. L. Darlino !
TELEPHONE: (714) 368-6223 MONTH: May 1993 k
DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Get)-
1 1094.63 16 1100.42 ,
2 1093.38 17 1100.04 3 1093.79 18 1104.13 4 1093.75 19 1102.21 5 1092.88 20 1102.33 l 6 1089.38 21 1099.46 7 1090.21 22 1093.33 8 1091.88 23 1097.67 9 1100.67 24 1096.92 10 1083.04 25 1098.88 f
11 1074.21 26 1101.21 12 1078.13 27 1105.00 13 1091.42 28 1097.92 ,
i 14 1102.38 29 870.21 '
15 1690.96 30 1058.79 31 1098.04 I
mor.may/9 j
Document Control Desk UNIT SHUTDOWNS AND POWER REDUCTIONS DOCXET NO: 50-362 UNIT NAME: SONGS - 3 REPORT MONTH: May 1993 DATE:
COMPLETED BY: J. L. Darlina TELEPHONE: (714) 368-6223 Methud of Shutting Cause & Corrective Duration Down LER System Component Action to No. Date Type l (Hours) Reason 2
Reactor' No. Code' Code' Prevent Recurrence 76 930528 S 0.0 H 5 NA KE COND Unit load reduced to allow circulating water system heat treat.
'F-Forced ' Reason: ' Method: 'IEEE Std 805-1984 S-Scheduled .A-Equipment Failure (Explain) 1-Manual 5
B-Maintenance or Test 2-Manual Scram. 1EEE Std 803A-1983 C-Refueling 3-Automatic Scram.
D-Regulatory Restriction 4-Continuation from E-Operator Training & License Examination Previous Month F-Administrative 5-Reduction in the Average G-Operational Error (Explain) Daily Power Level of more
.H-Other (Explain), than 20% from the previous day 6-Other (Explain) mor.may/10
Document Control Desk >
SUMMARY
OF OPERATING EXPERIENCE FOR THE MONTH DOCKET NO: 50-362 UNIT NAME: ~ SONGS - 3 ,
DATE:
COMPLETED BY: J. L. Darlina TELEPHONE: (714) 368-6223 Date Time Event May 1 0001 Unit is at 100% reactor power, 1148 MWe.
May 28 2200 Commenced power reduction to 80% in preparation for circulating water system heat treat. ;
May 29 0820 Unit at 80% reactor power.
May 30 0001 Commenced Unit load increase to 100% reactor power .
following completion of circulating water system heat treat.
1100 Unit at 100% reactor power.
May 31 2400 Unit is at 99% reactor Power, 1146 MWe.
4 r
t i
i i
i mor.may/11 t
I Y
Do6ument Control Desk REFUELING INFORMATION DOCKET NO: 50-362 UNIT NAME: SONGS - 3 DATE:
COMPLETED BY: J. L. Darlina TELEPHONE: (714) 368-6223 MONTH: May 1993
- 1. Scheduled date for next refueling shutdown.
Cycle 7 refueiing outage is forecast for October 9, 1993.
- 2. Scheduled date for restart following refueling.
Restart from Cycle 7 refueling outage is forecast for December 1993.
- 3. Will refueling or resumption of operation thereafter require a Technical '
Specification change or other license amendment? -
Yes.
What ':ill these be?
The following Technical Specification changes are desired in support of work being performed during the Unit 3 Cycle 7 refueling outage. !
T A. A change has been requested to Technical Specification 4.4.5.2.1 to allow a delay in performing an RCS inventory balance during plant transients. Although not required, NRC approval of this change is desired prior to startup from the Unit 3 Cycle 7 outage.
B. A change has been requested to Technical Specificati,.n 3.7.1.1 to allow an increased tolerance on the main steam safety valves for .the purpose of determining valve operability. Although not required, .
NRC approval of this change is desired to support the surveillance testing scheduled to be performed during the Unit 3 Cycle 7 outage.
- 4. Scheduled date for submitting proposea licensing action and supporting information.
A. Proposed Change on RCS Leakrate Submitted November 20, 1992 B. Proposed Change on MSSVs Submitted March 5, 1993
- 5. Important licensing considerations associated with refueling, e.g. new or different fuel desige rc c.upplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures.
None.
mor.may/12
Document Control Desk REFUELING INFORMATION DOCKET NO: 50-362 UNIT NAME: SONGS - 3 DATE: ,
COMPLETED BY: J. L Darlina TELEPHONE: (714) 368-6223 MONTH: May 1993 i
- 6. The number of fuel assemblies.
a) In the core. 217 ,
b) In the spent fuel storage pool. 602 (484 Unit 3 Spent Fuel Assemblies.118 Unit 1 Spent Fuel Assemblies)
- 7. Licensed spent fuel storage capacity. 1542 Intended change in spent fuel storage capacity. None !
- 8. Projected date of last refueling that can be discharged to spent fuel storage pool assuming present capacity.
Approximately 2004 (full off-load capability)
Date revised to provide a closer approximation of full off-load capability.
mor.may/13