i 1

Document Control Desk NRC MONTHLY OPERATING REPORT DOCKET NO: 50-361 UNIT NAME: SONGS - 2 DATE:

COMPLETED BY: J. L. Darlina TELEPHONE: (714) 368-6223 ,

OPERATING STATUS

1. Unit Name: San Onofre Nuclear Generatina Station, Unit 2 Reporting Period: May 1993 2.
3. Licensed Thermal Power (Mwt): 3390
4. Nameplate Rating (Gross MWe):

1127

5. Design Electrical Rating (Net MWe): 1070
6. Maximum Dependable Capacity (Gross MWe): 1127 l
7. Maximum Dependable Capacity (Net MWe): 1070
8. If Changes Occur In Capacity Ratings (Items Number 3 Through 7)

Since Last Report, Give Reasons: NA

9. Power Level To Which Restricted, If Any (Net MWe): NA
10. Reasons For Restrictions, If Any: NA This Month Yr.-to-Date Cumulative
11. Hours In Reporting Period 744.00 3,623.00 85,800.00
12. Number Of Hours Reactor Was Critical 744.00 3,623.00 64,357.36
13. Reactor Reserve Shutdown Hours 0.00 0.00 0.00
14. Hours Generator On-Line 744.00 3,623.00 63,280.27
15. Unit Reserve Shutdown Hours 0.00 0.00 0.00
16. Gross Thermal Energy Generated (MWH) 2,522,349.10 12,009,636.36 206,829,484.68
17. Gross Electrical Energy Generated (MWH) 845,719.00 4,053,044.50 70,098,604.50
18. Net Electrical Energy Generated (MWH) 806,475.00 3.859,302.00 66,466,817.83
19. Unit Service Factor 100.00% 100.00% 73.75%
20. Unit Availability Factor 100.00% 100.00% 73.75%
21. Unit Capacity Factor (Using MDC Net) 101.31% 99.55% 72.40% ,
22. Unit Capacity Factor (Using DER Net) 101.31% 99.55% 72.40% >
23. Unit Forced Outage Rate 0.00% 0.00% 6.51% i
24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each): i Refuelina shutdown, June 5, 1993 Duration (77 days)
25. If Shutdown At End Of Report Period, Estimated Date of Startup: NA ,
26. Units In Test Status (Prior To Commercial Operation): Forecast Achieved INITIAL CRITICALITY NA NA INITIAL ELECTRICITY NA NA COMMERCIAL OPERATION NA NA i

mor.may/2 9306170014 930614 PDR R

ADOCK 05000361 PDR

Document Control Desk AVERAGE DAILY UNIT POWER LEVEL DOCKET NO: 50-361 UNIT NAME: SONGS - 2 DATE:

COMPLETED BY: J. L. Darlica TELEPHONE: (714) 365-6223-MONTH: May 1993 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) 1 1027.25 16 1095.75 2 1084.79 17 1090.67 3 1081.33 18 1094.25 4 1080.71 19 1094.71 5 1079.96 20 1092.88 6 1081.58 21 1079.83 7 1052.75 22 1089.67 8 1028.79 23 1088.17 9 1086.79 24 1087.46 10 1087.17 25 1089.54 11 1087.25 26 1091.38 12 1092.58 27 1093.33 13 1097.79 28 1083.04 14 1098.50 29 1090.50 t

15 1092.50 30 1091.63 31 __

1090.58 mor.may/3 l

Document Control. Desk UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO: 50-361 -

UNIT NAME: SONGS - 2 REPORT MONTH: May 1993 DATE: '

COMPLETED BY: J. L. Darlina TELEPHONE: (714) 368-6223 Method of Shutting Cause & Corrective Duration Down LER System Component Action to No. Date Type l (Hours) Reason z

Reactor 3 No. Code' Code' Prevent Recurrence There were no shutdowns or power reductions this reporting period.

1 2 2 F-Forced Reason: Method: "IEEE Std 805-1984 S-Scheduled A-Equipment Failure (Explain) 1-Manual B-Maintenance or Test 2-Manual Scram. S IEEE Std 803A-1983 C-Refueling 3-Automatic Scram.

0-Regulatory Restriction 4-Continuation from E-Operator Trainir.g & License Examination Previous Month F-Administrative 5-Reduction in the Average G-Operational Error (Explain) Daily Power Level of more H-Other (Explain) than 20% from the previous day 6-Other (Explain) mor.may/4 u _ _ _ _ _ _ _____ _ _ ____. _ _ _ _ _ __ _ ._ . - - _ _

Document Control Desk

SUMMARY

OF OPERATING EXPERIENCE FOR THE MONTH DOCKET N0: 50-361 UNIT NAME: SONGS - 2 DATE:

COMPLETED BY: J. L. Darlina TELEPHONE: (714) 368-6223 Date Time Event May 1 0001 Unit is in Mode 1, 100% reactor power, 1135 MWe.

May 7 2002 Commenced reactor power decrease to 80% to perform circulating water pump bumping (Momentary stopping of circulating water pumps to clear debris from

  • water box tubesheets).

May 8 0010 Unit at 80% reactor power, 893 MWe.

0400 Commenced reactor power increase to 100% after bumping all four circulating water pumps.

0945 Unit at 100% reactor power. ,

May 31 2400 Unit at 100% reactor power, 1140 MWe.

mor.may/5

Document Control Desk REFUELING INFORMATION DOCKET NO: 50-361 UNIT NAME: SONGS - 2 DATE:

COMPLETED BY: J. L. Darlino TELEPHONE: (714) 368-6223 MONTH: May 1993 i

1. Scheduled date for next refueling shutdown.

Cycle 7 refueling outage is forecast for June 5,1993.

2. Scheduled date for restart following refueling.

Restart from Cycle 7 refueling outage is forecast for August 1903.

3. Will refueling or resumption of operation thereafter require a Technical Specification change or other license amendment?

Yes. -

What will these be?

The following Technical Specification change is desired in support "

of work being performed during the Unit 2 Cycle 7 refueling outage.

A change has been requested to Technical Specification 4.4.5.2.1 to allow a delay in performing an RCS inventory balance during plant transients. Although not required, NRC approval of this change is desired prior to startup from the Unit 2 Cycle 7 outage.

4. Scheduled date for submitting proposed licensing action and supporting information.

l Proposed Change on RCS Leakrate was submitted November 20, 1992.

5. Important licensing considerations associated with refueling, e.g. new or different fuel design or supplier, unreviewed design or performance analysis ,

methods, significant changes in fuel design, new operating procedures.  ;

None. >

mor.may/6 i

Document Control Desk i

REFUELING INFORMATION DOCKET NO: 50-361 l UNIT NAME: SONGS - 2 DATE:

COMPLETED BY: J. L. Darlino TELEPHONE: (714) 368-6223 i

MONTH: May 1993

6. The number of fuel assemblies.

a) In the core. 217 In the spent fuel storage pool.

b) 662 (484 Unit 2 Spent Fuel Assemblies.108 New fuel Assemblies, 70 l Unit 1 Spent Fuel Assembl ies . )

7. Licensed spent fuel storage capacity. 1542 Intended change in spent fuel storage capacity. None
8. Projected date of last refueling that can be discharged to spent fuel storage pool assuming present capacity.

Approximately 2005 (full off-load capability)

Date revised to provide a closer approximation of full off-load - .

capability.

9 t

l mor.may/7

'I

Document Control Desk NRC MONTHLY OPERATING REPORT DOCKET NO: 50-362 UNIT NAME: SONGS - 3 DATE:

COMPLETED BY: J. L. Darlina TELEPHONE: (714) 368-6223 OPERATING STATUS

1. Unit Name: San Onofre Nuclear Generatina Station Unit 3
2. Reporting Period: May 1993
3. Licensed Thermal Power (MWt): 3390
4. Nameplate Rating (Gross MWe): 1127
5. Design Electrical Rating (Net MWe): 1080
6. Maximum Dependable Capacity (Gross MWe): 1127 l
7. Maximum Dependable Capacity (Net MWe): 1080
8. If Changes Occur In Capacity Ratings (Items Number 3 Through 7) '

Since Last Report, Give Reasons: NA

9. Power Level To Which Restricted, If Any (Net MWe): NA
10. Reasons For Restrictions, If Any: NA This Month Yr.-to-Date Cumulative
11. Hours In Reporting Period 744.00 3,623.00 80,351.00 i
12. Number Of Hours Reactor Was Critical 744.00 3,566.97 62,766.73  :
13. Reactor Reserve Shutdown Hours 0.00 0.00 0.00
14. Hours Generator On-Line 744.00 3,543.50 61,149.56  !
15. Unit Reserve Shutdown Hours 0.00 0.00 0.00  !
16. Gross Thermal Energy Generated (MWH) 2,443,620.00 11,672,358.20 196,306.432.44
17. Gross Electrical Energy Generated (MWH) 849,178.00 4,010,478.00 66,637,338.00
18. Net Electrical Energy Generated (MWH) 808,493.00 3,810,258.00 62,955,928.36
19. Unit Service Factor 100.00% 97.81% 76.10%
20. Unit Availability Factor 100.00% 97.81% 76.10%
21. Unit Capacity Factor (Using MDC Net) 100.62% 97.38% 72.55%

i

22. Unit Capacity Factor (Using DER Net) 100.62% 97.38% 72.55% .
23. Unit Forced Outage Rate 0.00% 2.19% 7.17%
24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

Refuelina shutdown, October 9, 1993, duration 85 days.

25. If Shutdown At End Of Report Period, Estimated Date of Startup: NA i
26. Units In Test Status (Prior To Commercial Operation): Forecast Achieved INITIAL CRITICALITY NA NA  :

INITIAL ELECTRICITY NA NA COMMERCIAL OPERATION NA NA r

mor.may/8 i i

i Dodument Control Desk  :

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO: 50-362 -

UNIT NAME: SONGS - 3 DATE: >

COMPLETED BY: J. L. Darlino  !

TELEPHONE: (714) 368-6223 MONTH: May 1993 k

DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Get)-

1 1094.63 16 1100.42 ,

2 1093.38 17 1100.04 3 1093.79 18 1104.13 4 1093.75 19 1102.21 5 1092.88 20 1102.33 l 6 1089.38 21 1099.46 7 1090.21 22 1093.33 8 1091.88 23 1097.67 9 1100.67 24 1096.92 10 1083.04 25 1098.88 f

11 1074.21 26 1101.21 12 1078.13 27 1105.00 13 1091.42 28 1097.92 ,

i 14 1102.38 29 870.21 '

15 1690.96 30 1058.79 31 1098.04 I

mor.may/9 j

Document Control Desk UNIT SHUTDOWNS AND POWER REDUCTIONS DOCXET NO: 50-362 UNIT NAME: SONGS - 3 REPORT MONTH: May 1993 DATE:

COMPLETED BY: J. L. Darlina TELEPHONE: (714) 368-6223 Methud of Shutting Cause & Corrective Duration Down LER System Component Action to No. Date Type l (Hours) Reason 2

Reactor' No. Code' Code' Prevent Recurrence 76 930528 S 0.0 H 5 NA KE COND Unit load reduced to allow circulating water system heat treat.

'F-Forced ' Reason: ' Method: 'IEEE Std 805-1984 S-Scheduled .A-Equipment Failure (Explain) 1-Manual 5

B-Maintenance or Test 2-Manual Scram. 1EEE Std 803A-1983 C-Refueling 3-Automatic Scram.

D-Regulatory Restriction 4-Continuation from E-Operator Training & License Examination Previous Month F-Administrative 5-Reduction in the Average G-Operational Error (Explain) Daily Power Level of more

.H-Other (Explain), than 20% from the previous day 6-Other (Explain) mor.may/10

Document Control Desk >

SUMMARY

OF OPERATING EXPERIENCE FOR THE MONTH DOCKET NO: 50-362 UNIT NAME: ~ SONGS - 3 ,

DATE:

COMPLETED BY: J. L. Darlina TELEPHONE: (714) 368-6223 Date Time Event May 1 0001 Unit is at 100% reactor power, 1148 MWe.

May 28 2200 Commenced power reduction to 80% in preparation for circulating water system heat treat.  ;

May 29 0820 Unit at 80% reactor power.

May 30 0001 Commenced Unit load increase to 100% reactor power .

following completion of circulating water system heat treat.

1100 Unit at 100% reactor power.

May 31 2400 Unit is at 99% reactor Power, 1146 MWe.

4 r

t i

i i

i mor.may/11 t

I Y

Do6ument Control Desk REFUELING INFORMATION DOCKET NO: 50-362 UNIT NAME: SONGS - 3 DATE:

COMPLETED BY: J. L. Darlina TELEPHONE: (714) 368-6223 MONTH: May 1993

1. Scheduled date for next refueling shutdown.

Cycle 7 refueiing outage is forecast for October 9, 1993.

2. Scheduled date for restart following refueling.

Restart from Cycle 7 refueling outage is forecast for December 1993.

3. Will refueling or resumption of operation thereafter require a Technical '

Specification change or other license amendment? -

Yes.

What ':ill these be?

The following Technical Specification changes are desired in support of work being performed during the Unit 3 Cycle 7 refueling outage.  !

T A. A change has been requested to Technical Specification 4.4.5.2.1 to allow a delay in performing an RCS inventory balance during plant transients. Although not required, NRC approval of this change is desired prior to startup from the Unit 3 Cycle 7 outage.

B. A change has been requested to Technical Specificati,.n 3.7.1.1 to allow an increased tolerance on the main steam safety valves for .the purpose of determining valve operability. Although not required, .

NRC approval of this change is desired to support the surveillance testing scheduled to be performed during the Unit 3 Cycle 7 outage.

4. Scheduled date for submitting proposea licensing action and supporting information.

A. Proposed Change on RCS Leakrate Submitted November 20, 1992 B. Proposed Change on MSSVs Submitted March 5, 1993

5. Important licensing considerations associated with refueling, e.g. new or different fuel desige rc c.upplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures.

None.

mor.may/12

Document Control Desk REFUELING INFORMATION DOCKET NO: 50-362 UNIT NAME: SONGS - 3 DATE: ,

COMPLETED BY: J. L Darlina TELEPHONE: (714) 368-6223 MONTH: May 1993 i

6. The number of fuel assemblies.

a) In the core. 217 ,

b) In the spent fuel storage pool. 602 (484 Unit 3 Spent Fuel Assemblies.118 Unit 1 Spent Fuel Assemblies)

7. Licensed spent fuel storage capacity. 1542 Intended change in spent fuel storage capacity. None  !
8. Projected date of last refueling that can be discharged to spent fuel storage pool assuming present capacity.

Approximately 2004 (full off-load capability)

Date revised to provide a closer approximation of full off-load capability.

mor.may/13