| Site: | San Onofre |
| Issue date: | 06/14/1993 |
| From: | Rosenblum R SOUTHERN CALIFORNIA EDISON CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML20045B243 | List: |
| References | |
| NUDOCS 9306170013 | |
| Download: ML20045B242 (1) | |
Text
~
l 1*%
n/*,***
Southem Califomia Edison Company 23 PARKEH STREET 1RVINE, CALIFORNIA 9271B H. M. ROSE NBLUM TEMPHONE MANAGEROF
{7,4) d54-450S June 14, 1993
~ucuanem u,m m m uns f
U. S. Nuclear Regulatory Commission
[
Document Control Desk i
Washington, D.C.
20555
Subject:
Docket Nos. 50-361 and 50-362 f
Monthly Operating Reports for May 1993 1
San Onofre Nuclear Generating Station, Units 2 and 3 Technical Specification 6.9.1.10 to Facility Operating Licenses NPF-10 and NPF-15 for the San Onofre Nuclear Generating Station, Units 2 and 3, respectively, requires SCE to provide a Monthly Operating Report for each Unit, 1
which includes: routine operating statistics and shutdown experience; all challenges to safety valves; any changes to the Offsite Dose Calculation Manual i
(ODCM); and any major changes to the radioactive waste treatment system. All covered activities are reported monthly, except for ODCM' changes, which are reported within 90 days from the-time the changes were made effective.
j l
This letter transmits the May 1993 Monthly Operating Reports for Units 2 and 3, l
respectively.
There were no challenges to safety valves, no changes to the ODCM, and no major changes to the Units 2 and 3 radioactive waste treatment systems during the reporting period.
I If you require any additional information, please let me know.
1 Sincerely, l
/
f' h
t Enclosures I
cc:
R. H. Faulkenberry (Regional Administrator, USNRC Region V)
M. B. Fields (NRC Project Manager, Units 2 and 3) l C. W. Caldwell (USNRC Senior Resident Inspector, Units 1, 2 and 3) l l
}
/\\