Category:MONTHLY OPERATING ANALYSIS REPORT
MONTHYEARML20217H0201999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Catawba Nuclear Station,Units 1 & 2 ML20212B4711999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Catawba Nuclear Station,Units 1 & 2 ML20217H0321999-08-31031 August 1999 Revised Monthly Operating Rept for Aug 1999 for Catawba Nuclear Station,Units 1 & 2 ML20210S2891999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Catawba Nuclear Station,Units 1 & 2 ML20212B4871999-07-31031 July 1999 Revised Monthly Operating Rept for July 1999 for Catawba Nuclear Station,Units 1 & 2 ML20209H4501999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Catawba Nuclear Station,Units 1 & 2 ML20210S2951999-06-30030 June 1999 Revised Monthly Operating Rept for June 1999 for Catawba Nuclear Station,Units 1 & 2 ML20209H4561999-05-31031 May 1999 Revised Monthly Operating Rept for May 1999 for Catawba Nuclear Station,Units 1 & 2 ML20196A0001999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Catawba Nuclear Station,Units 1 & 2 ML20206R1811999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Catawba Nuclear Station,Units 1 & 2 ML20196A0041999-04-30030 April 1999 Revised Monthly Operating Repts for Apr 1999 for Catawba Nuclear Station,Units 1 & 2 ML20206R1931999-03-31031 March 1999 Revised Monthly Operating Repts for Apr 1999 for Catawba Nuclear Station,Units 1 & 2 ML20205P9521999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Catawba Nuclear Station,Units 1 & 2 ML20204C9111999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Catawba Nuclear Station,Units 1 & 2 ML20205P9561999-02-28028 February 1999 Revised Monthly Operating Repts for Feb 1999 for Catawba Nuclear Station,Units 1 & 2 ML20204C9161999-01-31031 January 1999 Revised Monthly Operating Repts for Jan 1999 for Catawba Nuclear Station,Units 1 & 2 ML20199E3071998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Catawba Nuclear Station,Units 1 & 2 ML20198E3151998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Catawba Nuclear Station,Units 1 & 2 ML20199E3221998-11-30030 November 1998 Revised MOR for Nov 1998 for Catawba Nuclear Station,Units 1 & 2 Re Personnel Exposure ML20195E5521998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Catawba Nuclear Station,Units 1 & 2 ML20198E3261998-10-31031 October 1998 Revised Monthly Operating Repts for Oct 1998 for Catawba Nuclear Station,Units 1 & 2 ML20154L6551998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Catawba Nuclear Station,Units 1 & 2 ML20195E5611998-09-30030 September 1998 Revised Monthly Operating Rept for Sept 1998 for Catawba Nuclear Station,Units 1 & 2 ML20154L6661998-08-31031 August 1998 Rev 1 to MOR for Aug 1998 for Catawba Nuclear Station,Unit 2 ML20153B2921998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Catawba Nuclear Station,Units 1 & 2 ML20153B3071998-07-31031 July 1998 Revised Monthly Operating Repts for Jul 1998 for Catawba Nuclear Station,Units 1 & 2 ML20237B2531998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Catawba Nuclear Station,Units 1 & 2 ML20236Q8071998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Catawba Nuclear Station,Units 1 & 2 ML20237B2551998-06-30030 June 1998 Revised Monthly Operating Rept for June 1998 for Catawba Nuclear Station,Units 1 & 2 ML20236F0321998-05-31031 May 1998 Monthly Operating Repts for May 1998 for Catawba Nuclear Station,Units 1 & 2 ML20236Q8091998-05-31031 May 1998 Revised MOR for May 1998 for Catawba Nuclear Station,Units 1 & 2 ML20247K4451998-04-30030 April 1998 Narrative Summary Pages to Apr 1998 MOR for Catawba Nuclear Station ML20247M0251998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for Catawba Nuclear Station,Units 1 & 2 ML20247M0361998-03-31031 March 1998 Revised Monthly Operating Rept for Mar 1998 for Catawba Nuclear Station,Units 1 & 2 ML20217B2271998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Catawba Nuclear Station,Units 1 & 2 ML20216E2371998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Catawba Nuclear Station ML20217B2341998-02-28028 February 1998 Revised Monthly Operating Repts for Feb 1998 for Catawba Nuclear Station,Units 1 & 2 ML20202G8641998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for Catawba Nuclear Station,Units 1 & 2 ML20216F4301998-01-31031 January 1998 Revised Monthly Operating Repts for Jan 1998 for Catawba Nuclear Station ML20198P3261997-12-31031 December 1997 Monthly Operating Rept for Dec 1997 for Catawba Nuclear Station,Units 1 & 2 ML20202G8911997-12-31031 December 1997 Revised Monthly Operating Repts for Dec 1997 for Catawba Nuclear Station,Units 1 & 2 ML20198P3431997-11-30030 November 1997 Revised MOR for Nov 1997 for Catawba Nuclear Station,Unit 1 ML20203H5721997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for Catawba Nuclear Station,Units 1 & 2 ML20199C7271997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for Catawba Nuclear Station ML20203H5801997-10-31031 October 1997 Revised Monthly Operating Repts for Catawba Nuclear Station, Units 1 & 2,for Oct 1997 ML20211P9771997-09-30030 September 1997 Monthly Operating Repts for Sept 1997 for Catawba Nuclear Station ML20216K1511997-08-31031 August 1997 Monthly Operating Repts for Aug 1997 for CNS ML20210L0411997-07-31031 July 1997 Monthly Operating Repts for July 1997 for CNS ML20216K1611997-07-31031 July 1997 Revised MORs for July 1997 for CNS ML20141H2221997-06-30030 June 1997 Monthly Operating Repts for June 1997 for Catawba Nuclear Station,Units 1 & 2 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217H0201999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Catawba Nuclear Station,Units 1 & 2 ML20216E5401999-09-0707 September 1999 Special Rept:On 990826,discovered That Meteorological Sys Upper Wind Speed Cup Set Broken,Causing Upper Wind Channel to Be Inoperable.Cup Set Replaced & Channel Restored to Operable Status on 990826 ML20212B4711999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Catawba Nuclear Station,Units 1 & 2 ML20217H0321999-08-31031 August 1999 Revised Monthly Operating Rept for Aug 1999 for Catawba Nuclear Station,Units 1 & 2 ML20211B1281999-08-31031 August 1999 Dynamic Rod Worth Measurement Using Casmo/Simulate ML20211A9791999-08-20020 August 1999 Safety Evaluation Granting Licensee Request for Approval of Proposed Relief from Volumetric Exam Requirements of ASME B&PV Code,Section Xi,For Plant,Unit 2 ML20211F3441999-08-17017 August 1999 Updated non-proprietary Page 2-4 of TR DPC-NE-2009 ML20211C1291999-08-17017 August 1999 ISI Rept Unit 1 Catawba 1999 RFO 11 ML20210R1051999-08-0606 August 1999 Special Rept:On 990628,cathodic Protection Sys Was Declared Inoperable After Sys Did Not Pass Acceptance Criteria of Bimonthly Surveillance.Work Request 98085802 Was Initiated & Connections on Well Anode Were Cleaned or Replaced ML20210S2891999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Catawba Nuclear Station,Units 1 & 2 ML20212B4871999-07-31031 July 1999 Revised Monthly Operating Rept for July 1999 for Catawba Nuclear Station,Units 1 & 2 ML20209E4361999-07-0909 July 1999 SER Agreeing with Licensee General Interpretation of TS LCO 3.0.6,but Finds No Technical Basis or Guidance That Snubbers Could Be Treated as Exception to General Interpretation ML20196K6631999-07-0707 July 1999 Safety Evaluation Supporting Licensee 990520 Position Re Inoperable Snubbers ML20210S2951999-06-30030 June 1999 Revised Monthly Operating Rept for June 1999 for Catawba Nuclear Station,Units 1 & 2 ML20209H4501999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Catawba Nuclear Station,Units 1 & 2 ML20209H4561999-05-31031 May 1999 Revised Monthly Operating Rept for May 1999 for Catawba Nuclear Station,Units 1 & 2 ML20206T4771999-05-31031 May 1999 Rev 3 to UFSAR Chapter 15 Sys Transient Analysis Methodology ML20196L1881999-05-31031 May 1999 Non-proprietary Rev 1 to DPC-NE-3004, Mass & Energy Release & Containment Response Methodology ML20196A0001999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Catawba Nuclear Station,Units 1 & 2 ML20206P5201999-05-14014 May 1999 Safety Evaluation Accepting GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Motor-Operated Valves ML20206N8391999-05-0404 May 1999 Rev 16 to CNEI-0400-24, Catawba Unit 1 Cycle 12 Colr ML20206R1811999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Catawba Nuclear Station,Units 1 & 2 ML20196A0041999-04-30030 April 1999 Revised Monthly Operating Repts for Apr 1999 for Catawba Nuclear Station,Units 1 & 2 ML20206N8261999-04-22022 April 1999 Rev 15 to CNEI-0400-24, Catawba Unit 1 Cycle 12 Colr. Page 145 of 270 of Incoming Submittal Not Included ML20205S5551999-04-21021 April 1999 Safety Evaluation Accepting Response to GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design Basis Accident Conditions ML20205N3651999-04-12012 April 1999 Safety Evaluation Accepting IPE of External Events Submittal ML18016A9011999-04-12012 April 1999 Part 21 Rept Re Defect in Component of DSRV-16-4,Enterprise DG Sys.Caused by Potential Problem with Connecting Rod Assemblies Built Since 1986,that Have Been Converted to Use Prestressed Fasteners.Affected Rods Should Be Inspected ML20206R1931999-03-31031 March 1999 Revised Monthly Operating Repts for Apr 1999 for Catawba Nuclear Station,Units 1 & 2 ML20205P9521999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Catawba Nuclear Station,Units 1 & 2 ML20205P9561999-02-28028 February 1999 Revised Monthly Operating Repts for Feb 1999 for Catawba Nuclear Station,Units 1 & 2 ML20204C9111999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Catawba Nuclear Station,Units 1 & 2 ML20203A2581999-02-0505 February 1999 Safety Evaluation of TR DPC-NE-3002-A,Rev 2, UFSAR Chapter 15 Sys Transient Analysis Methodology. Rept Acceptable. Staff Requests Duke Energy Corp to Publish Accepted Version of TR within 3 Months of Receipt of SE ML20204C9161999-01-31031 January 1999 Revised Monthly Operating Repts for Jan 1999 for Catawba Nuclear Station,Units 1 & 2 ML20199K8711999-01-13013 January 1999 Inservice Insp Rept for Unit 2 Catawba 1998 Refueling Outage 9 ML20199E3071998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Catawba Nuclear Station,Units 1 & 2 ML20216F9931998-12-31031 December 1998 Piedmont Municipal Power Agency 1998 Annual Rept ML20205E9441998-12-31031 December 1998 1998 10CFR50.59 Rept for Catawba Nuclear Station,Units 1 & 2, Containing Brief Description of Changes,Tests & Experiments,Including Summary of Ses.With ML20206P2081998-12-31031 December 1998 Special Rept:On 981218,inoperability of Meteorological Monitoring Instrumentation Channels,Was Observed.Caused by Data Logger Overloading Circuit.Replaced & Repaired Temp Signal Processor ML20203A4101998-12-22022 December 1998 Rev 16 to CNEI-0400-25, Catawba Unit 2 Cycle 10 Colr ML20203A4041998-12-22022 December 1998 Rev 14 to CNEI-0400-24, Catawba Unit 1 Cycle 11 Colr ML20198B1341998-12-14014 December 1998 Revised Special Rept:On 980505,discovered That Certain Fire Barriers Appeared to Be Degraded.Caused by Removal of Firestop Damming Boards.Hourly Fire Watches Established in Affected Areas ML20196J8351998-12-0808 December 1998 Safety Evaluation Granting Relief Request Re Relief Valves in Diesel Generator Fuel Oil Sys ML20199E3221998-11-30030 November 1998 Revised MOR for Nov 1998 for Catawba Nuclear Station,Units 1 & 2 Re Personnel Exposure ML20198E3151998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Catawba Nuclear Station,Units 1 & 2 ML20196C0251998-11-27027 November 1998 SER Accepting Clarification on Calibration Tolerances on Trip Setpoints for Catawba Nuclear Station ML20196A6881998-11-25025 November 1998 Safety Evaluation Granting Relief Request 98-02 Re Limited Exam for Three Welds ML20196D4041998-11-19019 November 1998 Rev 1 to Special Rept:On 980618,determined That Method Used to Calibrate Wind Speed Instrumentation Loops of Meteorological Monitoring Instrumentation Sys Does Not Meet TS Definition for Channel Calibration.Procedure Revised ML20195E5521998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Catawba Nuclear Station,Units 1 & 2 ML20198E3261998-10-31031 October 1998 Revised Monthly Operating Repts for Oct 1998 for Catawba Nuclear Station,Units 1 & 2 ML20154M7661998-10-12012 October 1998 LER 98-S01-00:on 980913,terminated Vendor Employee Entered Protected Area.Caused by Computer Interface Malfunction. Security Retained Vendor Employee Badge to Prevent Further Access & Computer Malfunction Was Repaired.With 1999-09-07
[Table view] |
Text
. . _
OPERATlh6 DATA REFDRi DOCrET NO 50-413 DATE June 15,1943 crERAT:NE STAit's CCMPLETED BY R.A. Willians TELEPHONE 704-3E2-5346
- 1. Urst hase: Catamba 1
- 2. Fercrting Ferie:!: May 1, ic93-May 31, 1993
- 3. L1:ensed Tsersal ?c=er (Pit): 3411 <
4, Naseplate Ratir,; (5 toss NWe): 1305* Notes *Naseplate Fating ;
- 5. Design Electrical Fating (Net FWei: 1145 (Stoss !!Wel calculated as ,
- e. Maxis.:: :e;endat'e Capacity (Eross MWe): 1192 1450.000 MVA x .90 poner
- 7. Pniece Depencable Capacity (het MWe): 1129 ,
fatter per Fage iii,
- s. If Changes Occur in Ca;atity Eatings (Itees Nutter 3 Threngh 7) Since Last NURES-0020.
Fe;crt. Give Feas:r.s:
- i. Fr.*er Level Tc Mith Festricted, if Any (het NWe):
IC. Tieas:n For Festrictions, If any:
T This fienth Yr.-to-Date Cuaulative
!!. H: vs In Fe:crt:r4; Ferled 744.0 3623.0 69456.0
- 12. Leter Df riws Fea: tor has Crits:al 744.0 3623.0 52409.6
- 13. Fea:ter Resene Shuteent Hours --0-- --0-- --0-- l
- 14. Hours Generatcc On-Line 744.0 3623.0 51357.B :
- 15. Unit Ressn e Stutdon Heers --0-- --0-- --0-- !
16, Srcss T$ersal Energy Generated (MWH1 2508340 12099661 166636469 !
I
- 17. Eress Ele: trita! Energy Generated (MWH) 876163 430B399 5B633618
- 16. Net Electratal Energy Eenerated (MWH) 630354 4085499 55050740 l
- 19. Unit Service fatter 100.0 100.0 73.9
- 20. Unit Availatility Facter 100.0 100.0 73.9
- 21. Urit Capacity Fatter iusing MEC het) 99.9 99.9 69.9
- 22. Unit Capacity Factor (Using DEF het) 97.5 98.5 69.2 ,
f
- 23. Unit Force: Dutage Rate 0.0 0.0 10.4
- 24. SNthen Scheduled Dver Next 6 Menths (Type, Date, and Duration of Each)-
Ref uelirist - October 16, 1993 - 72 days [
- 25. If Shut Down At End Of Report Feriod. Estinated Cate of Startup: )
- 26. t! nits In Test Status (Frier to Ctesercial Operation): Forecast Achieved t
INIT!AL CRITICALITY INITIAL ELECTRICITY !
C0"".ERCIAL OPERATION i
i l
9306160407ADOCK930615 05000413 ;
i PDR ,
R PDR l i
0FERATINS LATA REF0FT DDCtET ND 50-413 UNIT Catamba 1 DATE Jur.e 15, 1993 COMPLETED BY R.A. Willises TELEPHONE 704-382-5346 MONTH Mar. 1993 D4 AVER EE DAILY F0WER LEVEL DH AVEFASE DAILY F0WER LEVEE (MWe-het) (MWe-Net) 1 1124 !? 1121 2 I!?0 IB 1117 3 1121 14 1119 4 1l!9 20 1123 5 1117 21 1126 6 111; 22 !!?7 7 1119 23 !!25 2 1119 24 1120 >
i 1121 25 1116 10 !125 26 1117 11 111: 27 1115 1E I120 2B 1073 13 1122 29 1091 14 1124 30 1092 15 !!?? 31 1092 16 1123
Ui4IT SIIUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-413 UNIT NAME CATAWBA 1 DATE Ubfib/9J REPORT MONTH May 1993 COMPLETED BY I4 . c. s1MMuras TELEPHONE (iU4}-JUZ-DZbJ.
(1) 2) _
(4) (5)
E HOD T A OF LICENSE N Y S SHUT EVENT SYS- CAUSE AND CORRECTIVE O P DURATION O DOWN REPORT TEM COMPONENT ACTION TO
. DATE E HOURS N R/X NO. CODE CODE PREVENT RECURRENCE NO SHUTDOWNS OR REDUCTION S
'(1)F Forced (2) (3) (4)
S Scheduled Reason
1-Manual Exhibit G - Instructici for Preparation of Data A-Equipment FailureB-Maintenance or test (Explain) Ent W Sheets For Licensee C-Refueling 2-Manual Scram 3-Automatic Scram Event Report (LER D-Regulato n R9striction 4-Other (Explain)- File (NUREG-0161))
E-Operator Training & License Examination F-Administrative (5)
G-Operator Error (Explain) Exhibit I - Same Source H-Other (Explain)
__ _ _ - . _ _ _ . _ - _ _ _ - _ - _ _ _ _ _ _ - - - - _ _ - _ _ _ _ - _ _ - _ . - - - - - - _ _ _ - - - _ _ _ .. - --- -- . - _-. . _ . . _ _ _ _ _ _ ~ _.
MONTHLY REFUELING INFORMATION REOUEST
- 1. Facility name: Catawba, Unit 1
- 2. Scheduled next refueling shutdown: October 1993
- 3. Scheduled restart following refueling: December 1994 THE PROJECT MANAGER HAS BEEN ADVISED BY SEPARATE COMMUNICATION OF ANY T.S. CHANGE OR LICENSE AMENDMENT. THEREFORE, QUESTIONS 4 THROUGH 6 WILL NO LONGER BE MAINTAINED IN THIS REPORT.
- 4. Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?
If'yes, what will these be?
If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions?
- 5. Scheduled date(s) for submitting proposed licensing action and supporting information.
- 6. Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, ;
significant changes in design or new operating procedures).
- 7. Number of Fuel assemblies (a) in the core: 193 (b) in the spent fuel pool: 408
- 8. Present licensed fuel pool capacity: 1418 Size of requested or planned increase: -
i
- 9. Projected date of last refueling which can be accommodated by present licensed capacity: September 2009 DUKE POWER COMPANY DATE: June 15, 1993 Name of
Contact:
N. C. Simmons Phone: 704-382-5263
t DOCKET: 50-413 UNIT: Catawba 1 Date: 06/15/93 NARRATIVE
SUMMARY
i MONTH: May 1993 I Catawba Unit 1 began the month of May operating at 100% full power. The unit operated at or near 100% I full power for the entire month !
i t
i i
Prepared by N. C. Simmons Telephone: 704-382-5263
OPERATING DATA REPORT DDCKET ND 50-414 DATE June 15. 1993 OPESAi!NE STATUS COMPLETED BY R.A. Willias.s TELEPHONE 704-382-5346
- 1. Unit Nase: Catauta E
- 2. Re;trting feriod: May 1, li93-May 31, 1993
- 3. Licensed itersal Power (%t): 3411
- 4. Naseplate Rating (Gross MWe): 1305e Notes INaseplate Fating
- 5. Design Electrical Rating (Net Ne): 1145 (Bress MWel calculated as
- c. Manaus Dependable Capacity (Cross MWe): 1192 1450.000 MVA r .90 power !
- 7. Maxieue Dependable Capa: ty (Net MWe): 1129 ,
factor per Page iii, B. If Changes Oc:ur in Capa:Ity Ratings (!tess Number 3 ihtough 7) Since Last NUREG-0020.
Re;srt. 62ve Reascns:
- 9. Fewer Le.el To Which Restricted, If Any (Net MWe):
- 10. Reascn Fct Restri:tions, If ar.y:
This Month Yr.-to-Cate Cusulative
- 11. hours in Re;orting Ferted 744.0 3623.0 59472.0
- 12. N.ater Of Heurs Rea:ter Was Crit: cal 744.0 2169.2 44834.6
- 13. Reatter Reserve Sht.tdown hours --0-- --0-- --0--
- 14. Hours Generator On-Line 744.0 2140.9 43956.5
- 15. Unit feserve Shutdomn Hours --0-- --0-- --0--
- 16. Bicss Thersal Energy Benerated (S H) 2474101 7039156 139730302
- 17. Srcss Ele:trical Energy Generateo (M W) 822493 2509906 494702B1
- 12. Net Electrical Energy Bene ated (MWH) B32158 2365919 46493245
- 19. Unit Service Fa: tor 100.0 59.1 74.0
- 20. Unit Availability Fa: tor 100.0 59.1 74.0
- 21. Unit Capacity Fattcr (Using MLC Net) 99.9 57.8 69.1
- 22. Unit Capacity Fatter fusing DER Net) 98.4 57.0 68.3
- 23. Unit Forced Dutage Rate 0.0 0.0 10.6
- 24. Shutdcwn Scheduled Over Next 6 Months (Type, Date, and Duration of Each): !
None
- 25. If Shut Dcwn At End Of Report Period. Estiaated Date of Startup:
- 26. Units In Test Status (Prior to Ceasercial Operation): Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY E0*,MERCIAL OPERATION t
OPERAT!NS DATA REFORT DOCLET ND 50-414 1mli Catawba 2 DATE June 15, 1993 COMFLETED BY R.A. Williaes TELEPHONE 704-382-5346 ;
I KAih NY. 1993 Le AVERAE:E DAILY F0WER LEVEL DAf AVERAGE DAILY F0WER LEVEL .l
!MWeiet) (Nt4etl I i
! !!61 17 1154 i
E 1154 la 1151 l 2 !!60 19 1156 4 359 20 1164
! 1004 21 !!65 e 115B 22 1166 1159 23 1163 6 1157 24 1159 9 !!55 25 1156 10 1155 26 1154 11 1155 27 1155 12 1154 28 1154 13 1156 29 1151 14 1160 30 1154 15 1157 31 1151 16 1157 l
l l
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-414 UNIT NAME CATAwt3A z DATE ub/13/9J REPORT MONTH May 1993 COMPLETED BY I4 C. s1MMurds TELEPHONE t / 0 4 J -J t3 2-JZ b J.
(1) 2) _
(4) (5)
E HOD T A OF LICENSE N Y S SHUT EVENT SYS- CAUSE AND CORRECTIVE O P DURATION O DOWN REPORT TEM COMPONENT ACTION TO
. DATE E HOURS N R/X NO. CODE CODE PREVENT RECURRENCE 7-P 93 4 F --
A --
HB XXXXXX ATWS MITIGATION SYSTEM ACTUATION CIRCUITRY RESET LIGHT NOT CLEARING 8-P 93 4 S --
A --
CD PUMPXX ADD OIL TO REACTOR COOLANT PUMP 9-P 93 5 F --
A --
HH PUMPXX FEEDWATER PUMP REPAIR (1) (2)Reason- (3) (4)
F Forced Method: Exhibit G - Instructior S Scheduled A-Equipment FailureB-Maintenance or test (Explain) 1-Manual for Preparation of,Datt 2-Manual Scram Entry Sneets For Licensee C-Refueling D-Regulatory Restriction 3-Automatic Scram 4-Other (Explain)
(LER Eyent Report (NUREG-0161))
File E-Operator Training & License Examination F-Administrative (5)
G-Operator Errgr (Explain) Exhibit I - Same Source H-Other (Explain)
MONTHLY REFUELING INFORMATION REOUEST
- 1. Facility name: Catawba. Unit 2
- 2. Scheduled next refueling shutdown: May 1994 f
- 3. Scheduled restart following refueling: July 1994 THE PROJECT MANAGER HAS BEEN ADVISED BY SEPARATE COMMUNICATION OF ANY T.S. CHANGE OR LICENSE AMENDMENT. THEREFORE, QUESTIONS 4 THROUGH 6 WILL NO LONGER BE MAINTAINED IN THIS REPORT.
- 4. Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?
If yes, what will these be?
If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions?
- 5. Scheduled date(s) for submitting proposed licensing action and supporting information.
- 6. Important licensing considerations (new or different design or I supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures).
- 7. Number of Fuel assemblies -( a ) in the core: 191 (b) in the spent fuel pool: 1E1 j
- 8. Present licensed fuel pool capacity: 3418 <
Size of requested or planned increase: -
- 9. Projected date of last refueling which can be accommodated by present licensed capacity: September 2011 DUKE POWER COMPANY DATE: June 15, 1993 Name of
Contact:
N. C. Simmons Phone: 704-382-5263 1
t DOCKET: 50414 UNIT: Catawba 2 Date: 06/15/93 NARRATIVE
SUMMARY
MONTH: May 1993 Catawba Unit 2 began the month of May operating at 100% power. The unit started a power decrease on 5/4 at 0001. During the power decrease, the unit held at approximately 30% power from 0601 to 0851 due to ATWS mitigation system actuation circuitry reset Ilght not clearing. The unit held at approximately 15%
power from 1100 to 1736 to add oil to a reactor coolant pump and perform feedwater valve work. During power escalation, the unit held at approximately 45% power from 5/5 at 0035 to 0300 for feedwater pump -
repair. The unit reached 100% power on 5/5 at 1100. The unit operated at or near '00% power for the remainder of the month. ,
i i
1 i
l Prepared by N. C. Simmons Telephone: 704-382-5263 l