J mcq
-f 4
UNITED STATES 1
'i NUCLEAR REGULATORY COMMISSION l
WASHING 10N, D.C,20555@01 May.26, 1993 i
Docket No. 50-271' i
LICENSEE: Vermont Yankee Nuclear Power Corporation j
FACILITY: Vermont Yankee Nuclear Power Station-j
SUBJECT:
SUMMARY
OF MAY 21, 1993, MEETING WITH REPRESENTATIVES 0F:
VERMONT YANKEE NUCLEAR POWER CORPORATION On May 21, 1993, Vermont Yankee Nuclear Power Corporation (the licensee) at Bolto Nuclear Power Station (VY). Massachusetts, to discuss licensing issues i
i A list of attendees is provided as Enclosure 1.
had recently submitted to the NRC'its recommendations I
BWR vessel water level indication issue (Generic Letter (GL) 92-0 i
BWROG recommended that licensees m;odify. level instrumentation systems to The-resolve non-condensible gas induced errors or show that plant-unique features i
result in an acceptable error."' The licensee noted that it has contracted 3
with the Electric Power Research Institute (EPRI) for testing of the' plant-specific instrumentation system configuration.
Following completion of the VY and report its plans to the NRC by Julytesting, the licensee w letter from the NRC staff to the licensee dated March 30, 1993,_as requested in the 30, 1993.
t The licensee had previously committed to submit a proposed technical specification (TS) change regarding leakage detection ' requirements for intergranular stress corrosion cracking (GL 88-01).
The licensee indicated that this proposal was under review by the Plant Operations Review Committee (PORC).
The staff reviewed the status of the licensee's'in-service testing (IST) program relief requests.
relief requests in early June,1993.The staff expects to issue its evaluation of those r
The licensee had two proposed TS changes pending before the C'ommission.
Proposed change no.167 relates to calibration requirements for power range -
meters. This change is being processed on a-low be issued before July 1993. Proposed change no. priority basis and will not 169.would incorporate ~'into had previously been approved by the staff-for use at..VY.the. p l-1 Report (COLR) for Cycle 17.be incorporated into the'TS;for use in develo May.1993.
This change.'is expected to_be~ approved in late hvWEsw p s' nM 9306070234 930526 M
PDR ADOCK 05000271 (s i P
\\
g
. The staff will meet with the licensee in the near future to discuss the licensee's plans for addressing seismic issues-in'its integrated plant evaluation for external events (IPEEE) (GL 88-20, Supplement 4).
The licensee had previously indicated its intent to eliminate reliance on Thermo-Lag fire barrier material by June 1, _1993, and to report when its actions had been completed. The staff requested that the licensee also'_ report what actions it had taken to eliminate reliance on Thermo-Lag.
l
/S/
Daniel H. Dorman, Project Manager Project Directorate I-3 Division of Reactor Projects - I/II
Enclosures:
1.
List of Attendees cc w/ enclosures:
See next page DISTRIBUTION:
Docket' File.No._50-27,1 NRC & Local PDRs PDI-3 Reading File T. Murley/F. Miraglia l
J. Partlow l
S.. Varga J. CAlvo W. Butler D. Dorman T. Clark OGC E. Jordan ACRS (10)
V. McCree, RI J. Wiggins, RI J. Linville, RI
$$3L, 0FFICE PDI-3:LA,
PDI-3:Pym,n PDI-3:D 3 NAME GlTClark d DDorman WButlerff)
Y f 24/93 MP(d93 DATE T/2 (/93
/
0FFICIAL RECORD COPY DOCUMENT NAME: A:\\VYMTGSUM.521
- l
~
The staff will meet with the licensee in the near future to discuss the licensee's plans for addressing seismic issues in its. integrated plant
_l evaluation for external events (IPEEE) (GL 88-20, Supplement. 4).
i The licensee had previously indicated its intent t'o eliminate: reliance on Thermo-Lag fire barrier material by June 1,1993, and to report when its l
actions had been completed. The staff requested that the licensee also report.
l what actions it had taken to eliminate reliance on Thermo-Lag.
.C
]
1 Daniel'H. Dorman, Project Manager
'l Project Directorate I-3
.i Division of-Reactor Projects - I/II i
Enclosures' 2
1.
List of Attendees cc w/ enclosures:
l See next page l
l l
i a
i i
l i
4 I
I I'l t
v
i.
l Mr. Donald A. Reid, Vice President Vermont Yankee Nuclear Power Station-Operations CC' Mr. Jay Thayer, Vice President G. Dana Bisbee, Esq.
Yankee Atomic Electric Company Office of the Attorney General.
580 Main Street Environmental. Protection Bureau l
Bolton, Massachusetts 01740-1398 State House Annex 25 Capitol Street Regional Administrator, Region I Concord, New Hampshire. 03301-6937.
U.S. Nuclear Regulatory Commission 475 Allendale Road Resident Inspector
. King of Prussia, Pennsylvania 19406 Vermont Yankee: Nuclear Power Station U.S. Nuclear Regulatory Commission R. K. Gad'III P.O. Box 176 Ropes & Gray Vernon, Vermont 05354-
.i One International Place Boston, Massachusetts 02110-2624 Chief, Safety Unit i
Office of the Attorney General-Mr. Richard P. Sedano, Commissioner One Ashburton Place,19th Floor Vermont Department of Public Service Boston, Massachusetts 02108 l
120 State-Street, 3rd F1oor Montpelier, Vermont 05602-Mr. David Rodham... Director:,
j Massachusetts Civil Defense-Agency Public Service Board 400 Worcester Rd.
State of Vermont P.O. Box.1496 120 State Street Montpelier, Vermont 05602.
Framingham, Massachusetts 01701-0317 1
-ATTN: James Muckerheide.
l 1
Chairman, Board of Selectmen Mr. Raymond N. McCandless Town of Vernon Vermont Division of-Occupational P.O. Box 116 and Radiological Health Vernon, Vermont 05354-0116 Administration Building Montpelier,. Vermont 05602 j
Mr. L. A. Tremblay Mr. J. P. Pelletier, Vice President Senior Licensing Engineer Vermont Yankee Nucle'ar Power Vermont Yankee Nuclear Power Corp.
Corporation 580 Main Street Ferry Road Bolton, Massachusetts 01740-1398 Brattleboro, Vermont 05301-7002 i
1';
i l
s LIST OF ATTENDEES LICENSING ISSUES MEETING REGARDING VERMONT YANKEE NUCLEAR POWER STATION BOLTON. MASSACHUSETTS MAY 21. 1993 NAME AFFILIATION TITLE Dan Dorman NRC/NRR/ Project Directorate I-3 Project Manager Len Tremblay Yankee Atomic Electric Company Sr. Licensing Engineer VY Project i
Dean Porter Vermont Yankee Nuclear Power Corp.
Engineering Project Sup.
l l
i i
1
,