ML20044E301
| ML20044E301 | |
| Person / Time | |
|---|---|
| Site: | Nine Mile Point |
| Issue date: | 05/14/1993 |
| From: | Joyner J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Sylvia B NIAGARA MOHAWK POWER CORP. |
| Shared Package | |
| ML20044E302 | List: |
| References | |
| NUDOCS 9305240167 | |
| Download: ML20044E301 (4) | |
See also: IR 05000220/1993008
Text
._
_ -
-
.
-
l
Qesigna 4
priginal
cc 9
'
[
Mkd
db
N& :
i
,
v
'
WY 14 1935
l
!
Docket Nos. 50-220
.'
50-410
r
l
Mr. B. Ralph Sylvia
l
Executive Vice President - Nuclear
,
Niagara Mohawk Power Corporation
301 Plainfield Road
<
j
Syracuse, New York 13212
l
Dear Mr. Sylvia:
Subject:
Combined Inspection 50-220/93-08 and 50-410/93-08
t
This letter refers to the physical security inspection conducted by Mr. E. B. King of this office
on April 19-23, 1993, of activities at the Nine Mile Point Nuclear Station Units 1 and 2,
I
authorized by NRC License Nos. DPR-63 and NPF-69 and to the discussions of our findings
I
held with Messrs. Abbott, Christensen and others by Mr. King at the conclusion of the
j
inspection.
l
t
Areas examined during the inspection are described in the enclosed NRC Region I Inspection
Report. Within these areas, the inspection consisted of selective examinations of security
i
procedures and representative records, interviews with personnel and observations by the
inspector.
!
l
We found that your physical security program is generally effective and directed toward assuring
i
public health and safety. Management support for the program was evident through the
,
implementation of several program enhancements. However, one of your activities was not
I
conducted in full accordance with NRC requirements, as set fonh in the Notice of Violation,-
enclosed herewith as Appendix A.
The violation involves your failure to satisfy cenain
j
requirements relative to assessment aids contained in your NRC-approved Physical Security Plan.
l
Tne violation has been categorized by severity level in accordance with the " General Statement
of Policy and Procedure for NRC Enforcement Actions," 10 CFR Part 2, Appendix C
(Enforcement Policy). You are required to respond to this letter, and in preparing your response,
i
t
you should follaw the instructions in Appendix A.
l
During this inspection and two previous inspections of your security program, we identified
j
l
several examples of performance that are uncharacteristic of your previous performance in the
security area. For example, during our inspection in April,1992, we observed intrusion
detection system zone problems existed that were not detected by the security force patrols.
'
Additionally, during our inspection in October,1992, we observed problems with unattended
,
vehicles and inadequate lighting in the protected area. Those observations, combined with the
!
i
l
!-
9305240167 930524
OFFCIALRECORD COPY
l
ADOCK 05000220
h=h,
j
-
'
O
i
, ;
_,
. _ , .
,
___ _ __
_
'
.
.
.
IlltY 14 1933L
Niagara Mohawk Power Corporation
2
violation identified during this inspection suggest a declining trend in your overall performance
in this area, and we believe that your attention is required. In your response to this letter, we
would appreciate your assessment of the matter.
Sections of the Notice of Violation and the enclosed inspection report contain details of your
security program that have been determined to be exempt from public disclosure in accordance
i
with 10 CFR 73.21 (Safeguards Information). Therefore, those sections will not be placed in
the NRC Public Document Room and will receive limited distribution. This letter and the
remainder of the Notice and the inspection report will be placed in the Public Document Room,
in accordance with 10 CFR 2.790(a).
1
Your cooperation with us in this matter is appreciated.
1
Sincerely,
OriginalSigned By:
James H.Joyner
i
James H. Joyner, Chief
Facilities Radiological Safety
and Safeguards Branch
j
Division of Radiation Safety
i
and Safeguards
Enclosures:
1.
Appendix A, Notice of Violation (Contains Safeguards Information (SGI))
2.
Combined Inspection Report No. 50-220/93-08 and 50-410/9348 (Contains Safeguards
Information (SGI) in Paragraph 4.3)
.
OFFICIAL RECORD COPY
,
l
~
,
.
.
!!4)' 1 4 1993
Niag:ua Mohawk Power Corporation
3
cc w/ encl (w/o SGI):
Vice President - Nuclear Generation
C. Terry, Vice President - Nuclear Engineering
J. Perry, Vice President - Quality Assurance
K. Dahlberg, Unit 1 Plant Manager
M. McCormick, Unit 2 Plant Manager
D. Greene, Manager, Licensing
H. Christensen, Supervisor, Nuclear Security (w/SGI)
J. Warden, New York Consumer Protection Branch
G. Wilson, Senior Attorney
M. Wetterhahn, Winston and Strawn
Director, Power Division, Department of Public Service, State of New York
C. Donaldson, Esquire, Assistant Attorney General, New York Department oflaw
K. Abraham, PAO (2)
Public Document Room (PDR)
Iocal Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
NRC Resident Inspector (w/SGI)
State of New York, SLO Designee
.
,
l
OFFICIAL RECORD COPY
_
._
. _ . . _.
.-
.
_.
___
_
.._..
.
.
!
l
j
I
.
I
l
i
Niagara Mohawk Power Corporation
4
4 I53
l
bec w/enci (w/a SGI):
j
Region I Docket Room (with concurrences)
W. Lanning, DRS
J. Joyner, DRSS
C. Cowgill, DRP
J. Yerokun, DRP
L. Nicholson, DRP
S. Greenlee, DRP
W. Schmidt, SRI - Nine Mile
V. McCree, OEDO
R. Capra, NRR
D. Brinkman, NRR -
J. Menning, NRR
DRS/EB SALP Coordinator
.!
D. Holody, EO
1
!
l
l
!
{
L
.
!
l
pfn:DRSS
RI: RSS
p
g
S
R
.
05/W93
0513/93
05 y93
4
.
!
OFFICIAL RECORD COPY
L
l
i
!
-
.-.
,- , . - - -
..
-
- . , - . - - .
, . , - , . . ,