Monthly Operating Repts for Feb 1993 for Braidwood Nuclear Power Station,Units 1 & 2
ML20044C035
Person / Time
Site: Braidwood  Constellation icon.png
Issue date: 02/28/1993
From: Kofron K, Stanczak P
COMMONWEALTH EDISON CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
BW-93-0081, BW-93-81, NUDOCS 9303170023
Download: ML20044C035 (14)


Text

\\ Carnmonwarith Edis:n I

'J > ) Braidwood Nuclear Power Station C'7 -

Route #1, Box 84 Braceville, Illinois 60407 Telephone 815/458-2801 March 10, 1993 BH/93-0081 Director, Office of Resource Management United States Nuclear Regulatory Commission Washington, D.C.

20555 t'

ATTN: Document Control Desk Gentlemen:

Enclosed for your information is the Monthly' Performance Report'-

covering Braidwood Nuclear Power Station for the period February 1 through February 28, 1993.

/

K. L. Kofron Station Manager i

Braidwood Nuclear Station KLK/JL/dla ZCREG/24 Attachments cc:

A. B. Davis, N.R.C., Region III J. Hickman, U.S.N.R.C.

IL Dept. of Nuclear Safety N.R.C Resident Inspector, Braidwood INPO Records Center M. J. Hallace, V.P., Chief Nucl. Op. Officer.

D. L Farrar, Nucl. Reg. Serv. Mgr..

T. H.'Simpkin, Nucl. Licensing Admin.

D. R. Eggett, Nucl. Eng. Dept.

i S. M. Berg, Site V.P., Braidwood Nucl. fuel Serv., PHR Plant Support Results Engineering Grp., Tech Staff, Braidwood Nuclear Group, Tech Staff Braidwood 1

/'/ ) b

/

9303170023 930228 8

Dl}f n

PDR ADOCK 05000456 f

'R PDR V

1 4

BRAIDWOOD NUCLEAR POWER STATION UNIT 1 AND UNIT 2 MONTHLY PERFORMANCE REPORT Com0NHEALTH EDISON COMPANY NRC DOCKET NO. 050-456, LICENSE NO. NPF-72 NRC DOCKET NO. 050-457, LICENSE NO. NPF-77

)

l

.. ~

4 I.

Monthly Report for Braidwood Unit 1 l

A.

Sy_mmary of Operatina Experience Braidwood Unit 1 entered the month of February 1993 at approximately 1001, capable.

The Unit operated routinely throu1h f

the end~of the month.

i i

l I

i l

i t

s

(

i 1

t

' i

' i ZCREG/24 b

9 ac y

.m,,

B.

QEER.ATING DATA REPORT DOCKET NO.:

50-456 UNIT:

Braidwood 1-i DATE:

03/10/93 COMPILED BY:

P. Stantzak TELEPHONE:

(815)458-2801 Ext. 2486 OPERATING STATUS

1. Reporting Period:

February 1993 Gross Hours:

672

2. Currently Authorized Power Level (MHt):

3411 Design Electrical Rating'(MWe-gross):

1175 Design Electrical Rating (MWe-net):

1120 Max Dependable Capacity _(MWe-gross):

1175 Max Dependable Capacity (MWe-net):

1120 1

3. Power level to which restricted (If Any): _None
4. Reasons for restriction (If Any):

None THIS MONTH YR TO DATE-CUMULATIXE_

5. Report Period Hours:

672.0 1416.0-40209.0

6. Hours Reactor Critical 672.0 1256.3 30773.5--
7. RX Reserve Shutdown Hours:

0.0 0.0_

0.0 -

8. Hours Generator on Line 672.0 1249.5 30225.2
9. Unit Reserve Shutdown Hours:

0.0 0.0 0.0

10. Gross Thermal Energy (MHHt) 2221506.0 4031949.0 90933589.0L
11. Gross Elect. Energy (MHH) 778256.0 1410364.0-31199012.0-
12. Het Elect. Energy-(MWH):

750521.0 1356613.0~

29806308.0

13. Reactor Service Factor:

100.0 88.7 76.5

14. Reactor Availability Factor:

100.0 88.7 76.5:

15. Unit Service Factor:

100.0 88.2 75.2.

16. Unit Availability Factor:

100.0 88.2 75.2 r

17. Unit Capacity Factor (MDC NET):

99.7 85.5-66.2

18. Unit Capacity Factor-(DER NET):

99.7 85.5 66.2

19. Unit Forced Outage Rate:

0.0 11.8 10.1

20. Unit Forced Outage Hours:

0.0 166.5' 3402.8 4

21. Shutdown Schedule Over Next 6 months:

N/A

-22. If Shutdown at r Report Period, Estimated Dat<

Startup:

N/A l

ZCREG/24 l

f g-u-

4 ey,

t C.

MEMCtLMILY UNIT NET PORER LEVEL LOG DOCKET NO.:

50-456 UNIT:

Braidwood 1 DATE:

03/10/93.

COMPILED BY:

P. Stantzak TELEPHONE:

(815)458-2801 Ext. 2486 MONTH:

February 1993 1.

  • 1L18 16
  • 1131 l

2.

  • 1142 17.
  • 1139 1

3.

1120 18.

  • 1138 4.

1107 19.

  • 1126 5.

1106 20.

  • 1133 6.

1102 21.

1120 l

7.

1098

._ 22.

  • 1139 8.

1917 23.

  • 1140 9.

1111 24.

  • 1133 10.
  • 1121 25.
  • 1142 11.

1099 26.

  • 1139

)

12.

1106 27.

1120 13.

1116 28.

1099 14.

1Q53 29.

i 15.

1064 30.

I INSTRUCTIONS On this form list the average daily unit power level in MWe-Net for each day in the reporting month.

Compute to the nearest whole megawatt.

These figures will be used to plot a graph for each reporting-month.

Note that when maximum dependable capacity-is used for the net electrical.

rating of the unit, there may be occasions when the daily average power-level exceeds the 100% line (or the restricted power level line).

In such cases the average daily unit power output sheet should-be footnoted to explain the apparent anomaly.

i

  • Due to condenser efficiency.

j 2CREG/24

)

\\

'D.

UNIT SHUTDOWNS / REDUCTIONS DOCKET NO.- 50-656 UNIT:'Braidwood l'.,

- ~

DATE: 03/10/93 COMPILED.BY: P. Stanczak.

TELEPHONE: (815)458-2801 REPORT PERIOD:

February 1993 Ext. 2486 i

l No DAIE IXEE HQURS REASON METHOD LER NUMBER SYSTEM COMPONENT CAUSE & CORRECTIVE ACTION TO PREVENT RECURRENCE-l l-l i

i t

TYPE REASON METHOD SYSTEM & COMPONENT F-Forced A-Equipment Failure Maint or Test 1 - Method Exhibit F & H-S-Scheduled B-Maint or Test 2 - Manual Scram Instructions ~for Preparation of C-Refueling 3 - Auto Scram Data Entry. Sheet

.0-Regulatory Restriction 4 - Continued Licensee Event Report E-Operator. Training & License Examb '; ion 5 - Reduced Load (LER) File (NUREG-0161)

F-Administration 9:- Other G-Oper Error H-Other ZCREG/24.

~.

a w

E.

UNIOUE REPORTING REQUIREMENTS - UNIT 1 1.

Safety / Relief-valve. operations.

VALVES NO & TYPE PLANT-DESCRIPTION DAIE ACTUATED ACTUATION-CONDITION OF EVENT None f

2.

Licensee generated changes to ODCM.

None

+

ZCREG/24' t

, -. _-.. u. -...:.. u _..

i F.

LICENSEE EVENT REPORTS - UNIT 1 The following is a tabular summary of all Licensee Event Reports submitted during the reporting period February 1 through February 28, 1993.

This information--is provided pursuant-to the reportable.

l occurrence reporting requirements as set forth in 10 CFR 50.73.

i Licensee Event Report Bfport Number Date

. Title of Occurrence-None 1

4 P

I i

l

.i I

-j

)

'l O

ZCREG/24 l

4

-II.

Monthly Report for Braidwood Unit 2 A.

Sy_mmary_of_QparAt_ing_E x p e r i e n c g Braidwood Unit 2 entered the month of February 1993 at approximately 99% capable. On February 5, power was reduced to approximately 83% due to a steam leak on the line downstream of a high pressure turbine ventilating valve.

The unit operated at i

this approximate power level through the end of the month.

l l

l i

P t

l 1

I ZCREC/24 i

i

B.

REEMluiG_DAIA_REEQRI DOCKET *NO.:

50-457 UNIT:

Braidwood 2 DATE:

03/10/93 COMPILED BY:

P. Stanczak TELEPHONE:

(815)458-2801 Ext. 2486 OPERATING STATUS

1. Reporting Period:

February 1993 Gross Hours:

672

2. Currently Authorized Power Level (MWt):

3411 Design Electrical Rating (MWe-gross):

1175 Design Electrical Rating (MWe-net):

1120 Max Dependable Capacity (MWe-gross):

1175 Max Dependable Capacity (MWe-net):

1120

3. Power level to which restricted (If Any):

None

4. Reasons for restriction (If Any):

None THIS MONTH YR TO DATE _Culi4LAI11E

5. Report Period Hours:

672.0 1416.0 38291.0

6. Hours Reactor Critical 672.0 1416.0 32578.5
7. RX Reserve Shutdown Hours:

0.0 0.0 0.0

8. Hours Generator on Line 672.0 1416.0 32303.8
9. Unit Reserve Shutdown Hours:

0.0 0.0 0.0

10. Gross Thermal Energy (MWHt) 1930383.8 4329848.8 96342591.8
11. Gross Elect. Energy (MWH) 657612.0 1467085.0 32923806.0
12. Net Elect. Energy (MWH):

630723.0 1408476.0 31522512.0

13. Reactor Service Factor:

100.0 100.0 85.1

14. Reactor Availability Factor:

100.0 100.0 85.1

15. Unit Service Factor:

100.0 100.0 84.4

16. Unit Availability Factor:

100.0 100.0 84.4

17. Unit Capacity Factor (MDC NET):

83.8 88.8 73.5

18. Unit Capacity Factor (DER NET):

83.8 88.8 73.5

19. Unit forced Outage Rate:

0.0 0.0 3.6

20. Unit Forced Outage Hours:

0.0 0.0 1197.3

21. Shutdown Scheduled Over 3rd Refuel Outage, March 1993 Next 6 Months:
22. If Shutdown at End of Report Period.

Estimated Date of Startup:

N/A ZCREG/24

i a

C.

AVERAGE DAILY UNIT _ RET POWER LEVEL LOG DOCKET NO.:

50-457 s

UNIT:

Braidwood 2 DATE:

03/10/93 COMPILED BY:

P. Stanczak i

TELEPHONE:

(815)458-2801 1

Ext. 2486 MONTH:

February 1993 i

1.

1106 16.

904 2.

1106 17.

903 t

3.

1106 18.

905 4.

1033 19.

906 5.

909 20.

907 i

i 6.

921 21.

912 1

7.

920 22.

899 8.

921 23.

899_

s 9.

922 24.

901 10.

922 25.

901 I

11.

922 26.

102 12.

921 27.

901 13, 920 28.

900 14.

919-30.

l 15.

918 INSTRUCTIONS On this form list the average daily unit power level in MWe-Net for each day in-the reporting month.

Compute to the nearest whole megawatt.

These figures will be used to plot a graph for each reporting month.

Note that when maximum dependable capacity is-used for the net electrical 5

rating of the. unit there may be occasions when the daily average. power-level exceeds the 100% line (or the restricted power level line)~.

In j

such cases;the average daily unit power output sheet should be footnoted i

to explain.the apparent' anomaly.

l

~

i ZCREG/24

=

6 6

  • ^

D.

UNIT SKUTDSHNS/ RED _UfIl0XS DOCKET NO.: 50-457l-

' UNIT: Braidwood 2 4-DATE:.03/10/93 COMPILED BY: P. Stanczak-i m

TELEPHONE: (815)458-2801.

Ext. 2486 REPORT PERIOD:

February 1993

'No DA_LE TYPE HOURS REASON METHOD LE!Lt[ UMBER SYSTEM COMPONENT CAUSE & CORRF,.CTIVE ACTION TO PREVENT RECURRENCE' i

l TYPE REASON METHOD SYSTEM & COMPONENT F-Forced A-Equipment Failure Maint or Test 1 - Method Exhibit F & H S-Scheduled B-Maint or Test.

2 - Manual Scram Instructions for Preparation of C-Refueling 3 - Auto Scram Data Entry Sheet 0-Regulatory Restriction 4 - Continued Licensee Event Report

E-Operator Training & License Examination 5 - Reduced Load (LER) Flie (NUREG-0161)

F-Administration' 9 - Other-G-Oper Error H-Other ZCREG/24-

.. ~..

'E.

[LNJOUE REPORTING REOUIREMENTS - UNIT 2 1.

-Safety / Relief valve operations.

VALVES NO & TYPE PLANT DESCRIPTION

_D_AIT_E ACTUATED ACTUATION CONDITION OF EVENT None f

'2.

Licensee generated changes to ODCH.

None

.ZCREG/24 t

- 5

.E.'-.s

-m-- -.... -

  • . m+

s..----.

,..<-,.w.--..---.ce.-~----

.v

-+,---,.e--.~.v-.<---.

-,--rww.

,-w~,-

,2-w,

.I,.

.-w,~1,

-,..-I

..+.,Im~.-,4--w..~vm..4._

-e..

i

~,

F.

LICENSEE EVENT REEORTS - UNIT 2 i

The.following-is.a tabular summary of all Licensee Event Reports submitted during the reporting' period February 1 through February 28 -

1993. This information is provided pursuant to the reportable occurrence reporting requirements as set forth in 10 CFR 50.73.

Licensee Event Report

.l Reoort Nupber Date Title of Occurrents None

.i

[

l i

-i

'i 1

i h

I 6

I l

ZCREG/22' l

i 1

I

'l