Wisconsin Electnc POWER COMPANY 231 W. M:chgan PC. Box 2046. Mdwoukee. W! 53201 (414)221-2345 VPNPD 0 61 NRC 0 3 6 March 8, 1993 Document Control Desk U.S.
NUCLEAR REGULATORY COMMISSION Mail Station F1-137 Washington, D.C.
20555 Centlemen:
DOCKETS 50-266 AND 50-301 MONTHLY OPERATING REPORTS POINT BEACH NUCLEAR PLANT, UNITS 1 AND 2 Attached are monthly operating reports for Units 1 and 2 of the Point Beach Nuclear Plant for the calendar month of Januar-y 1993.
&b/voftl Sincerely, (f/
t
(
y Bob Link Vice President Nuclear Power MFB/jg cc:
L.
L. Smith, PSCW NRC Regional Administrator, Region III NRC Resident Inspector
.l i
9303160321 930228 pp-ADDCKOSOOg6 DR
,g
.g
[
OPERATIWG DATA REPORT DOCKET No. 50-266 DATE:
03/05/93
~
COMPLETED BY:
Richard F. Arnold TELEPHONE:
755-2321 ext.193 OPERATING STATUS
- 1. UNIT NAME POINT BEACH NUCLEAR PLANT - UNIT 1 NOTES
- 2. REPORTING PERIOD: February - 1993
- 3. LICENSED THERMAL POWER (MWT):
1518.5
- 4. NAMEPLATE RATING (GROSS MWE) 523.8.
- 5. DESIGN ELECTRICAL RATING (NET MWE):
497.0
- 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE):
509.0.
- 7. MAXIMUM DEPENDABLE CAPACITY (NET MWE):
485.0 8.
IF CHANGES _ OCCUR IN CAPACITY RATINGS (ITEMS 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS:
na
- 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE):
na
- 10. REASONS FOR RESTRICTIONS, (IF ANY)*
na THIS MONTH YEAR TO DATE CUMULATIVE
- 11. HOURS IN REPORTING PERIOD 672.0 1,416.0 195,624.0
- 12. NUMBER ~OF HOURS REACTOR WAS CRITICAL 672.0 1,416.0 162,299.3 13.. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 667.3.
- 14. HOURS GENERATOR ON LINE 672.0 1,416.0 159,255.4
- 15. UNIT RESERVE: SHUTDOWN HOURS 0.0 0.0 846.9
- 16. GROSS THERMAL ENERGY GENERATED (MWH) 1,018,667 2,147,575 223,884,548
- 17. GROSS ELECTRICAL ENERGY GENERATED 344,470 726,170 75,602,570 18.. NET ELECTRICAL ENERGY GENERATED (MWH) 330,301 696,336-72,048,499
- 19. UNIT SERVICE FACTOR 100.0%
100.0%
81.4%
- 20. UNIT AVAILABILITY FACTOR 100.0%
100.0%
81.8%
- 21. UNIT CAPACITY FACTOR (USING MDC NET) 101.3%
101.4%
75.6%
- 22. UNIT CAPACITY FACTOR (USING DER NET) 98.9%
98.9%
74.1%
23.-UNIT FORCED OUTAGE RATE 0.0%
0.0%
1.7%
- 24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):
Refueling Outage 3/27/93-5/13/93'(47 Days)
~25. IF~ SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
na DATA REPORTED AND' FACTORS. CALCULATED AS REQUESTED IN NRC LETTER DATED SEPTEMBER 22, 1977 M
= --
~
,.. - ~ ~,
v.w.x v-,
~-c i
+
.-.w w
.w--
. ~. -
=
4--
~
s e
,w+
DOCKET NO.
50-266 POINT BEACH NUCLEAR PLANT UNIT NAME Point Beach.' Unit 1 AVERAGE DAILY UNIT POWER LEVEL DATE March 5.1993 '
MONTH FEBRUARY - 1993 COMPLETED BY R. F. Amold TELEPHONE 414/755-2321 AVERAGE AVERAGE DAILY AVERAGE DAILY POWER LEVEL DAILY POWER LEVEL
- MWe NET ___
__f0[
D POWER LEVEL MWe NET DE MWe NET DE 492 21 492 11 1
494 490 22 493 12 t
2 493 491 23 492 13
-3 491 490 24 493 14 4
493 491 25 -
493 15 5
491 494 26 493 16 F
6 493 492 27 493 17 7
470~
493 28 492 18 8
494 491 19 9
493 493 20 10
'494 s
PBF.0028e
- ~ ~. --
~
.. =.. -..
.... ~ ~,,
POINT BEACH NUCLEAR PLANT Daket No..
50-266 Unit Name Point Beach. Unit 1 UNIT SHUTDOWNS AND POWER REDUCTIONS Date March 5.1993 -
~
Completed By R. F. Amold REPORT MONTH FEBRUARY - 1993 Telephone No.
414/755-2321. Ext.193 Method of '
Shuning No.
Date Type
- Duration Reason
- Down Licensee Event System Component Cause and Conective Action 4
'F: Forced Reason:
' Method:
' Exhibit G - Instructions 2
S: Scheduled A - Equipment Failure (explain) 1 - Manual for preparation of B - Maintenance or Testing 2 - Manual Scram data entry sheets C - Refueling
' 3 - Automatic Scram LER file (NUREG-0161)
D - Regulatory Restriction 4 '- Continuation of E - Operator Training &
Previous Shutdown Licensing Exam 5 - Reduced lead F - Administrative 6 - Other (explain)
' Exhibit I - Same Source G _- Operational Error (explain)
H - Other (explain)
PBFM8b (03-90)
... ~.
DOCKET No.
50-266 UNIT NAME Point Beach Unit 1 DATE March 5, 1993 COMPLETED BY R. F.: Arnold TELEPHONE 414/755-2321, Ext. 193 i
Unit 1 operated at approximately 492 MWe net throughout the report period with no significant load reductions.
i During the annual maintenance overhaul of G01 emergency diesel generator the ethylene glocal in the engine was replaced with treated water containing a rust inhibitor. G01 was rerated to original FSAR values when it was returned to service on February 25, 1993.
Licensee Event Report 266/93-001-00 was submitted.
Safety-related maintenance included:
1.
Repositioned pins on latch check switches of eight 4160 V safeguards breakers.
2.
Completed annual maintenance overhaul of the G01 emergency diesel.
t P
1 6
i u
\\cs t? h OPERATI2G DATA REPORT DOCKET NO. 50-301 DATE: 03/05/93 COMPLETED BY Richard F. Arnold TELEPHONE: 755-2321 ext.193 OPERATING STATUS
- 1. UNIT NAME:
POINT BEACH NUCLEAR PLANT - UNIT 2 NOTES
- 2. REPORTING PERIOD: February - 1993
- 3. LICENSED THERMAL POWER (MWT):
1518.5
- 4. NAMEPLATE RATING (GROSS MWE):
523.8
- 5. DESIGN ELECTRICAL RATING (NET MWE):
497.0 6.-MAXIMUM DEPENDABLE CAPACITY (GROSS MWE):
509.0.
- 7. MAXIMUM DEPENDABLE CAPACITY (NET MWE):
485.0
- 8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS:
na
- 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET'MWE): na
- 10. REASONS FOR RESTRICTIONS,'(IF ANY):
na THIS MONTH YEAR TO DATE CUMULATIVE
- 11. HOURS IN REPORTING PERIOD 672.0 1,416.0 180,409.0
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL 672.0 1,416.0
~157,691.9
- 13. REACTOR RESERVE SHUTDOWN Hobas 0.0 0.0 229.9
- 14. HOURS. GENERATOR ON LINE 672.0 1,416.0 155,398.5 15.. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 302.2
- 16. GROSS THERMAL ENERGY GENERATED (MWH) 1,003,337 2,120,292 222,766,553
- 17. GROSS ELECTRICAL. ENERGY GENERATED 344,570 728,260 75,728,380
- 18. NET ELECTRICAL ENERGY GENERATED (MWH) 330,155 697,899 72,184,306
- 19. UNIT SERVICE FACTOR 100.0%
100.0%
86.1%
- 20. UNIT AVAILABILITY FACTOR 100.0%
100.0%
86.3%
- 21. UNIT CAPACITY FACTOR (USING MDC NET) 101.3%
.101.6%
81.9%
- 22. UNIT CAPACITY FACTOR (USING DER NET) 98.9%
99.2%
80.5%
- 23. UNIT FORCED OUTAGE RATE 0.0%
0.0%
1.0%.
- 24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE,.DATE, AND DURATION OF EACH):
na 25..IF; SHUTDOWN AT END OF PEPORT PERIOD, ESTIMATED DATE OF STARTUP:
na DATA REPORTED AND FACTORS CALCULATED.AS REQUESTED'IN NRC LETTER DATED SEPTEMBER 22, 1977
~...
. -.. ~. =
POINT BEACII NUCLEAR PLANT DOCKET NO.
50-301 AVERAGE DAILY UNIT POWER LEVEL UNIT NAME Point Beach. Unit 2 MONTH FEBRUARY - 1993 DATE March 5.1993' COMPLETED BY R. F. Arnold TELEPHONE 414/755-2321 AVERAGE AVERAGE AVERAGE DAILY DAILY DAILY POWER LEVEL POWER LEVEL POWER LEVEL -
PR MWe NET
_DR MWe NET DE MWe NET 1
496 11 494 21 4%
2 494 12~
495 22 493 t
3 494 13 494 23 494 4
496 14 495 24 494 5
494 15 495 25 494 6
495 16 499 26 495 7
496 17 495 27 494 8
496 18 490 28 395 9'
495 19 494 10 -
497 20 495 l'
i PBF-0028a (03-90) 1 m
POINT BEACH NUCLEAR PLANT Dockct No.
50-301 Unit Name Point Beach. Unit 2 UNIT STIUTDOWNS AND POWER REDUCTIO?iS Date l' arch 5.1993 Completed By R. F. Arnold REPORT MONTH FEBRUARY - 1993 Telephone No.
414/755-2321. Ext.193 Method of Shutting Duration Down 13censee Event System Cornpones Cause and Corrective Action y
No.
Dew -
Type'
- (Hours)
Reason' pe g Report No.
Code' Code' To Prevent Recunence t
2r28N3 F
0 A
5 IF INSTRU Fai!ure of pressure transmittee which provides an input signal to the feedwater turbine trip c:rcuit. The pressure transmitter was replaced.
I
'F: Forced 2Reason:
' Method:
- Exhibit G - Instructions
. S: Scheduled A - Equipment Failure (explain) 1 - Manual for preparation of B - Maintenance or Testing 2 - Manual Scram data entry sheets C_- Refueling 3 - Automatic Scram LER file (NUREG-0161)
D - Regulatory Restriction 4 - Continuation of E - Operator Training &
- Previous Shutdown Licensing Exam 5 - Reduced Load F - Administrative 6 - Other (explain)
' Exhibit I - Same Source G - Operational Error (explain)
H - Other (explain) i PBF-00286
. 03-90)
(
DOCKET NO.
50-301 UNIT NAME Point Beach Unit 2 DATE March 5, 1993 COMPLETED BY R.
F. Arnold TELEPHONE 414/755-2321, Ext. 193 Unit 2 operated at approximately 491 Mwe net throughout the report period with one significant load reduction because of the failure of a pressure transmitter which.provides input to the-feedwater turbine trip circuit (AMSAC).
Licensee Event Reports 301/92-006-01 and 301/93-001-00 were submitted.
Safety-related maintenance included:
1.
Repositioned pins on latch check switches of four 4160 V safeguards breakers.
2.
Replaced Loop "A" reactor coolant flow low bistable.
<