>Q CW Go UNITED STATES (k
NUCLE AR REGULATORY COMMISSION l
8 g
i
(
n AssinoTon, o. c.20sss s
j <;
k..v /
February 25, 1993 Docket No.50-029 Dr. Andrew C. Kadak, President j
and Chief Executive Officer i
Yankee Atomic Electric Company l
580 Main Street Bolton, Massachusetts 01740-1398 j
Dear Dr. Kadak-i
SUBJECT:
SITE RELEASE CRITERIA FOR DECOMMISSIONED NUCLEAR PLANTS At your meeting of October 6, 1992 with Dr. Murley, you requested site release criteria for decommissioning of nuclear plants.
I am providing the following pertinent documents for your review as well as a brief summary of the criteria.
1.
U.S. Nuclear. Regulatory Commission (NRC) staff requirements I
memorandum (SRM) approving the Action Plan proposed in SECY-92-106, l
dated April 6, 1992 2.
Regulatory Guide 1.86, " Termination of Operating Licenses for Nuclear Reactors," dated June 1974 3.
NRC letter, James R. Miller to Dr. Roland A. Finston at Stanford j
University, dated April 21, 1982.
j Item I is primarily focused on the cleanup of specific materials licensee sites. However, it also contains information which is directly applicable to reactor site cleanup.
i i
Items 2 and 3 are referenced in the Action Plan and are being supplied to you j
for completeness.
You may wish to obtain NUREG/CR-5849, " Guidance Manual for Conducting Radiological Surveys in Support of License Termination," which is also referenced in the Action Plan; it was published this year and contains j
guidance which you may find useful.
In addition, NUREG/CR-5512, Vol. 1, j
" Residual Radioactive Contamination From Decommissioning," published in October 1992, also provides pertinent information. The Action Plan cites 1
other documents that could be of interest.
j Current cleanup criteria for reactor sites are provided in Criterion 3 on-page 3 of the Action Plan.
Surface contamination must be reduced to levels' i
not exceeding the value in Table 1 of Regulatory Guide 1.86.
- Further, j
cobalt-60, cesium-137, and europium-152 that may exist in concrete,.
-1 components, structures, and soil should be removed such that the exposure rate is less than 5 microroentgen per hour above natural background at 1 meter, with an overall dose objective of not more.than 10 millirem per year.
Equally.
important is the concurrent protection of public water supplies. The.
9303030432 930225 PDR ADOCK 05000029 P
PDR;
{
\\*
i i
't s
February 25, 1993 Dr. Andrew C. Kadak -
migration of existing contamination through the ground water and potential airborne contamination of streams as a result of site work are of concern.
Criterion 4 of the Action Plan references the Environmental Protection Agency (EPA) regulation 40 CFR Part 141, " National Primary Drinking Water Standards."
In accordance with FC B3-23, the maximum contaminant levels for radionuclides in public drinking water as established by the EPA should be used as reference standards for protection of ground water and surface water resources.
Implementation of these criteria will permit unrestricted access to the site, subject to a site radiation verii'ication survey by the NRC.
Finally, the Commission has recently initiated a rulemaking to establish generic site cleanup criteria for the decommissioning of NRC-licensed sites.
I have enclosed a copy of a Federal Register Notice on this rulemaking for your information.
i I trust that the enclosures and referenced documents will fulfill your needs.
I Mort Fairtile is scheduled to remain the NRC Yankee Rowe Project Manager l
throughout the review of the Decommissioning Plan. Kindly contact him if you need further information.
Sincerely, original signed by.
Seymour H. Weiss, Director i
Non-Power Reactors and Decommissioning Project Directorate Division of Operating Reactor Support Office of Nuclear Reactor Regulation
Enclosures:
As stated r
cc w/ enclosures:
See next page DISTRIBUTION:
Docket, file.50-029 BGrimes MFairtile
\\ PDRs SWeiss OGC J ONDD r/f RDudley ACRS (10) i TMurley/FMiraglia RBernero Region I l
JPartlow EHylton CHehl, RI t
- See previous concurrence Of.(DD[LA~
ONDD:PMkh,$-ONDD:PM*
ONDD:SC*
TECH ED.*
ONDD:D*
l Elif1 ton MFairtile:dml PErickson RDudley DGable SWeiss l
J/g/93 1/2f/93 11/24/92 11/24 11/17/92 11/25/92 DDRS:DD*
DIR:NMSS*
ADP*
OGC*
%d 45f5 BGrimes RBernero JPartlow FCameron 11/25/92 12/10/92 2/23/93 2/19/93
'y'h l
OFFICIAL RECORD COPY DOCUMENT NAME: A:KADAK.MF (YANKEE R0WE Diskette)
i Dr. Andrew C. Kadak,
migration of existing contamination through the ground water and potential r
airborne contamination of streams as a result of site work are of concern.
Criterion 4 of the Action Plan references the Environmental Protection Agency (EPA) regulation 40 CFR Part 141, " National Primary Drinking Water Standards."
In accordance with FC 83-23, the maximum contaminant levels for radionuclides in public drinking water as established by the EPA should be used as reference standards for protection of ground water and surface water resources.
Implementation of these criteria will permit unrestricted access to the site, subject to a site radiation verification survey by the NRC.
Finally, the Commission has recently initiated a rulemaking to establish generic site cleanup criteria for the decommissioning of NRC-licensed sites.
1 I have enclosed a copy of a Federal Register Notice on this rulemaking for your information.
I trust that the enclosures and referenced documents will fulfill your needs.
Mort Fairtile is scheduled to remain the NRC Yankee Rowe Project Manager throughout the review of the Decommissioning Plan. Kindly contact him if you i
need further information.
Sincerely, n
1 Seymour H. Wei
, Director Non-Power Reactors and Decommissioning Project Directorate Division of Operating Reactor Support Office of Nuclear Reactor Regulation
Enclosures:
4 As stated cc w/ enclosures:
See next page r
i-Ms. Jane M. Grant Yankee Rowe Docket No. 50-29 CC:
Dr. Andrew C. Kadak, President Mr. David Rodham, Director t
and Chief Executive Office ATTN: Mr. James B. Muckerheide Yankee Atomic Electric Company Massachusetts Civil Defense Agency 580 Main Street 400 Worcester Road Bolton, Massachusetts 01740-1398 P. O. Box 1496 Framingham, Massachusetts 01701-0317 Thomas Dignan, Esq.
Ropes and Gray Chairman, Franklin County One International Place Commission Boston, Massachusetts 02110-2624 425 Main Street Greenfield, Massachusetts 03101 Mr. N. H. St. Laurent Plant Superintendent Executive Director Yankee Atomic Electric Company New England Conference of Public Star Route Utility Commissioners Rowe, Massachusetts 01367 45 Memorial Circle Augusta, Maine 04330 Resident Inspector Yankee Nuclear Power Station Citizens Awareness Network U.S. Nuclear Regulatory Commission P. O. Box 83 P. O. Box 28 Shelburne Falls, Massachusetts 01370 Monroe Bridge, Massachusetts 01350 Regional Administrator, Region I U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, Pennsylvania 19406 Robert M. Hallisey, Director Radiation Control Program Massachusetts Department of Public Health 305 South Street Boston, Massachusetts 02130 Commissioner Richard P. Cedano Vermont Department of Public Service 120 State Street, 3rd Floor Montpelier, Vermont 05602 4,
Mr. Jay K. Thayer Vice President and Manager of Operations Yankee Atomic Electric Company 580 Main Street Bolton, Massachusetts 01740-1398
,