ML20044B178

From kanterella
Jump to navigation Jump to search
Forwards Safety Insp Repts 50-352/90-15 & 50-353/90-14 on 900410-0521 & Notice of Violation
ML20044B178
Person / Time
Site: Limerick  Constellation icon.png
Issue date: 07/06/1990
From: Blough A
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Danni Smith
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
Shared Package
ML20044B179 List:
References
NUDOCS 9007180043
Download: ML20044B178 (2)


See also: IR 05000352/1990015

Text

y _

b'

,

,.

.

06 JUL E90

Docket Nos. 50-352

,

50-353

Philadelphia Electric Company

ATTN: Mr. D. M. Smith

Senior Vice President -

Nuclear

Nuclear Group Headquarters

.

Correspondence Control' Desk

P. O. Box 195

Wayne, PA 19087-0195

Gentlemen:

Subject:

Inspection Nos. 50-352/90-15 and 50-353/90-14

This letter transmits the findings of the routine resident safety inspection by

Messrs. T. Kenny, L. Scholl, and Ms. M. Evans from April 10 - May 21, 1990 at

.

the Limerick Generating Station, Limerick, Pennsylvania. The inspection

'

consisted of document reviews, interviews, and observations of activities. The

>

results have been discussed with Mr. Graham Leitch and Mr. Martin McCormick, Jr.

of your staff.

t

L

Based on our inspection, a violation for failure to follow procedures during

recirculation of the waste sludge tank was identified. This resulted in a

spill of resin. This violation has been categorized by severity level according

to 10-CFR Part 2, Appendix C (Enforcement Policy). You are required to respond

'

to this violation and in preparing your response you should follow the instruc-

tions in Anpendix A.

,

We also noted some exampirs where Nonconformance Reports (NCRs) were disposi-

tioned with inadequate technical justification and documentation.

Since NCRs

alert management to problems within the facility, it appears additional manage-

ment attention is warranted to ensure they are properly dispositioned.

Your cooperation is appreciated.

' Sincerely,

Orbind Elmd b

A. Randy Dlxgt:y

A. Randolph Blough, Chief

.

Projects Branch No. 2

-

Division of Reactor Projects

-

Enclosures:

1. NRC Region I Inspection Report 50-352/90-15 and 50-353/90-14

2. Appendix A, Notice of Violation

OFFICIAL RECORD COPY

COVER LTR - LIMERICK

0001.0.0

-

--~

9007180043 900706

07/06/90

>

PDR

ADOCK 05000332

s(

Q

FDC

O

- - , , , , - - - , - , - - - - , - - . - . . , , , - .

..

.

E.

y

. Philadelphia Electric Company

2

06 JUL.1980

cc w/ encl:

R. J. Lees, Chairman, Nuclear Review Board

G. M. Leitch, Vice President - Limerick Geneming Station

D. R. Helwig, Vice President of Nuclear Engineering and Services

J. W. Durham, Sr., Vice President and General Council

M. J. McCormick, Jr., Manager - Limerick Generating Station

G. A. Hunger, Jr. , Director - Licens(ng Section

J. Doering, Project Manager - Limerick Generating Station

J. F. O'Rourke, Manager - Limerick Quality Division

T. B. Conner, Jr. , Esquire

G. J. Madsen, Regulatory Engineer - Limerick Generating Station

Public Document Room (PDR)

Local Public Document Room (LPDR)

tiuclear Safe y faformation. Center (NSIC)

NRC Resident !r3pector

Commonwealth of Pennsylvania

l

bec w/ enc 1:

Region 1 Docket Room (with concurrences)

Management Assistant, DRMA (w/o encl)

E. Blough, DRP

P. Kaufman, DRP.

L. Doerflein, DRP

M. Conner (SALP Reports Only)

K.-Abraham, PA0 (20) SALP Reports Only

M. Miller, SLO

J. Caldwell, ED0

R. Clark, NRR

R. Bellamy, DRSS

W. Pasciak DRSS (see paragraph 1.3)

bec w/ Executive Summary Only:

W. Kane, DRP

J. Wiggins, DRP

W. Hodges, DRS

J. Durr, DRS

R. Gallo, DRS

M. Knapp, DRSS

.

J. Lyash, SRI-Peach Bottom

T. Kenny, SRI-Limerick

B. Norris, PI - Shoreham

W. Butler, NRR

$

h

RI:DRP

RI:DRP

KI .DRP

-@TKenny-

LDoerflein

RBlough

7/(o/90

7/(./90

7/(/90

0FFICIAL RECORD COPY

COVER LTR - LIMERICK - 0002.0.0

07/06/90

,

,