Text
,
.
.
.
._
.
... .. .
.
NN251000
!
Docket No. 50-289
GPU Nuclear Corporatior.-
ATTN: Mr. H. D. Hukill
'
,
Vice President and Director, THI-1
P. O. Box 480
-Middletown, Pennsylvania 17057
,
Gentlemen:
I
l
Subject:
Inspection Report No. 50-289/90-08
'
During the-period from April 4, 1990 to May 15, 1990, members of the NRC
Region I staff conducted routine safety inspections at your facility. We have
-
documented the results of those inspection findings.in the enclosed report.
_
We continue to observe good overall control over operational activities by
-
your staff, At the conclusion 'of the-inspectlon period, Mr. F. Young, of my
staff, sommarized the inspection findings to you and other members of your
staff.
Your cooperation in these matters is appreciated.
t
Sincerely,
[
0.T;lf/LslenE0ny
l
EDWARD C. WEtatiGER
i
Edward C. Wenzinger, Chief
Projects Branch No. 4
Division of Reactor Projects-
Enclosures:
,
1.
Exec tive Summary
1
2. .Inspes .lon Report.50-289/90-08
i
cc w/encis:
'
I.
E. L. Blake, Jr. , Esquire
l
T. G. Broughton, Operations and Maintenance Director THI-1
l
R. J. McGoey, Manager, PWR Licensing
.
C. W. Smyth, TMI-1 Licensing Manager
e
Commonwealth of Pennsylvania
.
.
>
'
Local Public Document Room (LPDR)
NRC Resident Inspector
!
,.
Nuclear Safety Information Center (NSIC)
Public Document Room (PDR)
Susquehanna Valley Alliance
TMI Alert
i
6
t
OFFICIAL RECORD COPY
IR TMll 90-08 - 0001.0.0
9006270132 900615
11/29/80
\\
DR
ADOCK 0500
9
gg
.
.
..
.
, ' .
!
,o
GPU Nuclear Corporation
2
bec w/ enc 1:
Region I Docket Room (with concurrences)
Management Assistant, DRMA (w/o enc 1)
,
R. Bellamy, DRSS
DRP Section Chief
'
K. Abraham,PA0(2)
,
J. Caldwell, NRR
E. Wenzinger, DRP Branch Chief, RI
R. He.3an, PM, NRR/PD1-4
F. Young, SRI
.
0.' Johnson, RI
L. Thonus, NRR/PD1-4
W. Kane, DRP, RI (cover letter and enclosure 1 only)
J. Wiggins, DRP, RI (cover letter and enclosure 1 only)
,
M. Hodges, DRS (cover letter and enclosure 1 only)
M. Knapp, DRSS (cover letter and enclosure 1 only)
E. Jordan, AEOD
!
>
t
r
b
RI: DRP
RI:DRP
'
RBRADY/jm
S
g
inger
6/[/90
6/ /90
t /90
0FFICIAL RECORD COPY
IR TMll 90-08 - 0002.0.0
11/29/80
i
. ..
,
.
1
l
Executive Summary
c..
>
1.
PLANT OPERATIONS
i
The plant ran at 95% power for the duration of the inspection period.
Problems with communications between. site chemistry and operations and log
keeping practices were demonstrated when a technical specification (TS)
!
required sampler was removed from service without operations being made
aware. The main r:ondenser vent continuous iodine sampler was out of
service for 42 hours4.861111e-4 days <br />0.0117 hours <br />6.944444e-5 weeks <br />1.5981e-5 months <br />; the maximum allowed by TS is 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br />.
Review of
the circumstances found the issue to be an isolated case. The licensee
adequately defined the problem and proposed and implemented adequate cor-
3
rective actions. Overall, plant operations continue to be conducted in a
safe manner.
,
II.
RADIOLOGICAL CONTROLS
Routine observations of radiological controls were conducted throughout
l
the inspection period.
No significant weaknesses were noted.
.
III. MAINTENANCE / SURVEILLANCE
The licensee continues to conduct maintenance and surveillance activities
in a safe and timely fashion. No deficiencies in the program or in speci-
fic activities were noted.-
IV.
ENGINEERING AND TECHNICAL SUPPORT
-
A review of the annual 10 CFR 50.59 report dated April 26, 1990, found the
document to fulfill the requirements of 10 CFR 50.59 for yearly reporting
of changes and modifications. A review of the nuclear engineers' 8R start-
up report verified that all core performance parameters were within their
acceptance criteria and that the-technical specification requirements were
.
I
l
satisfied.
'
c
l
V.
EMERGENCY PREPAr.CDinSS (EP)
l
No weaknesses were identified,
j
VI, SECURITY
i
One reportable event caused by perannel error occurred during this
.
inspection period.
The licensee took appropriate compensatory measures
l
,
and adequate corrective action.
~
'
E
VII. SAFETY ASSESSMENT AND QUALITY VERIFICATION
Licensee Event Reports (LER) 90-01 thru 90-05 were reviewed.
No
t
l
deficiencies were noted,
r
l
,