Forwards Safety Insp Rept 50-289/90-08 on 900404-0515.No Violations Noted
ML20043H960
Person / Time
Site: Crane 
Issue date: 06/15/1990
From: Wenzinger E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Hukill H
GENERAL PUBLIC UTILITIES CORP.
Shared Package
ML20043H961 List:
References
NUDOCS 9006270132
Download: ML20043H960 (3)


See also: IR 05000289/1990008

Text

,

.

.

.

._

.

... .. .

.

NN251000

!

Docket No. 50-289

GPU Nuclear Corporatior.-

ATTN: Mr. H. D. Hukill

'

,

Vice President and Director, THI-1

P. O. Box 480

-Middletown, Pennsylvania 17057

,

Gentlemen:

I

l

Subject:

Inspection Report No. 50-289/90-08

'

During the-period from April 4, 1990 to May 15, 1990, members of the NRC

Region I staff conducted routine safety inspections at your facility. We have

-

documented the results of those inspection findings.in the enclosed report.

_

We continue to observe good overall control over operational activities by

-

your staff, At the conclusion 'of the-inspectlon period, Mr. F. Young, of my

staff, sommarized the inspection findings to you and other members of your

staff.

Your cooperation in these matters is appreciated.

t

Sincerely,

[

0.T;lf/LslenE0ny

l

EDWARD C. WEtatiGER

i

Edward C. Wenzinger, Chief

Projects Branch No. 4

Division of Reactor Projects-

Enclosures:

,

1.

Exec tive Summary

1

2. .Inspes .lon Report.50-289/90-08

i

cc w/encis:

'

I.

E. L. Blake, Jr. , Esquire

l

T. G. Broughton, Operations and Maintenance Director THI-1

l

R. J. McGoey, Manager, PWR Licensing

.

C. W. Smyth, TMI-1 Licensing Manager

e

Commonwealth of Pennsylvania

.

.

>

'

Local Public Document Room (LPDR)

NRC Resident Inspector

!

,.

Nuclear Safety Information Center (NSIC)

Public Document Room (PDR)

Susquehanna Valley Alliance

TMI Alert

i

6

t

OFFICIAL RECORD COPY

IR TMll 90-08 - 0001.0.0

9006270132 900615

11/29/80

\\

DR

ADOCK 0500

9

gg

.

.

..

.

, ' .

!

,o

GPU Nuclear Corporation

2

bec w/ enc 1:

Region I Docket Room (with concurrences)

Management Assistant, DRMA (w/o enc 1)

,

R. Bellamy, DRSS

DRP Section Chief

'

K. Abraham,PA0(2)

,

J. Caldwell, NRR

E. Wenzinger, DRP Branch Chief, RI

R. He.3an, PM, NRR/PD1-4

F. Young, SRI

.

0.' Johnson, RI

L. Thonus, NRR/PD1-4

W. Kane, DRP, RI (cover letter and enclosure 1 only)

J. Wiggins, DRP, RI (cover letter and enclosure 1 only)

,

M. Hodges, DRS (cover letter and enclosure 1 only)

M. Knapp, DRSS (cover letter and enclosure 1 only)

E. Jordan, AEOD

!

>

t

r

b

RI: DRP

RI:DRP

'

RBRADY/jm

S

g

inger

6/[/90

6/ /90

t /90

0FFICIAL RECORD COPY

IR TMll 90-08 - 0002.0.0

11/29/80

i

. ..

,

.

1

l

Executive Summary

c..

>

1.

PLANT OPERATIONS

i

The plant ran at 95% power for the duration of the inspection period.

Problems with communications between. site chemistry and operations and log

keeping practices were demonstrated when a technical specification (TS)

!

required sampler was removed from service without operations being made

aware. The main r:ondenser vent continuous iodine sampler was out of

service for 42 hours4.861111e-4 days <br />0.0117 hours <br />6.944444e-5 weeks <br />1.5981e-5 months <br />; the maximum allowed by TS is 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br />.

Review of

the circumstances found the issue to be an isolated case. The licensee

adequately defined the problem and proposed and implemented adequate cor-

3

rective actions. Overall, plant operations continue to be conducted in a

safe manner.

,

II.

RADIOLOGICAL CONTROLS

Routine observations of radiological controls were conducted throughout

l

the inspection period.

No significant weaknesses were noted.

.

III. MAINTENANCE / SURVEILLANCE

The licensee continues to conduct maintenance and surveillance activities

in a safe and timely fashion. No deficiencies in the program or in speci-

fic activities were noted.-

IV.

ENGINEERING AND TECHNICAL SUPPORT

-

A review of the annual 10 CFR 50.59 report dated April 26, 1990, found the

document to fulfill the requirements of 10 CFR 50.59 for yearly reporting

of changes and modifications. A review of the nuclear engineers' 8R start-

up report verified that all core performance parameters were within their

acceptance criteria and that the-technical specification requirements were

.

I

l

satisfied.

'

c

l

V.

EMERGENCY PREPAr.CDinSS (EP)

l

No weaknesses were identified,

j

VI, SECURITY

i

One reportable event caused by perannel error occurred during this

.

inspection period.

The licensee took appropriate compensatory measures

l

,

and adequate corrective action.

~

'

E

VII. SAFETY ASSESSMENT AND QUALITY VERIFICATION

Licensee Event Reports (LER) 90-01 thru 90-05 were reviewed.

No

t

l

deficiencies were noted,

r

l

,