Reviews Util 891220 Response to Generic Ltr 89-10, Safety- Related Motor-Operated Valve Testing & Surveillance. Request for 30-day Extension to Submit plant-specific Schedule Denied Due to Limited BWR Owners Group Effort
ML20043H739
Person / Time
Site: River Bend Entergy icon.png
Issue date: 06/18/1990
From: Paulson W
Office of Nuclear Reactor Regulation
To: Deddens J
GULF STATES UTILITIES CO.
References
GL-89-10, TAC-75708, NUDOCS 9006260385
Download: ML20043H739 (3)


Text

-

m.

1-p ge,

$4 -

'of UNITED STATES

['

O-NUCLEAR REGULATORY COMMISSION g E WASHINGTON, D C. 20$55

/>

June 18, 1990

...e r

. Docket No'. 50 458

. Gulf States' Utilities ATTH: Mr. James C. Deddens SeniorVicePresident(RBNG)

P. 0..Cox 220-St. Francisv111e, Louisiana: 70775

Dear tir. Deddens:

SUBJECT:

RESPONSE TO GENERIC LETTER 89-10, " SAFETY-RELATED MOTOR-OPERATED.

VALVE,(MOV)TESTINGANDSURVEILLANCE"'(TACNO.75708)

On June 28, 1989,- the NRC issued Generic Letter (GL) 89-10 requesting ~the.

establishment of a program to ensure the operability of'all> safety-related MOVs under design basis conditions. The program in GL 89-10 significantly expands the scope of the program outlined ^in NRC Bulletin 85-03 and its" supplement.

In accordance with' the schedule-provided in the CL?a descript. ion -of your HOV program shn'uld be available for' review.by June 28, 1990,,or.the first refueling cutage after December 28, 1989,'whichever is later.

Information-that should.be contained in your program description was discussed during.

the workshops held in September 1989.- The staff positions'on' questions-presented during the workshops will be issued-in'the form of:a supplement 4

to the GL. :As your: program is developed,-justification for any differences.

between your p*ogram and the GL exemplified by the. workshop comments should

.be incorporated into your program description.-

On December 20,1989;.you submitted a. letter in-response to GL 89;10, regarding the River Bend Station stating that the BWR Owners' Group'(BWOG) is developing a generic position. for meeting the provisions)of the GL'.

To allow the' use of.

the generic positio'n developed by' the BWOG, you, requested an extension'until 30 days following completion of that-generic position-(currently scheduled'for November 1990)' to submit the plant specific schedule and scope of effort to respond to the GL.

The NRC staff:was informed that the BWOG was undertaking the task of developing a generic BWR position for implementing GL 89-10 in a:1etter dated October 30, 1989, fron S. D. Floyd, Chairman of the:BWOG. 'The efforts of the BWOG rcre.

acknowledged in a letter dated January 3,1990, from F. J. Iliraglia, Jr., NRC,

- to S. D. Floyd.

During a telephone conversation on-February 14, 1990, with S. D. Floyd, the staff: learned that the scope of the. efforts -by-the BW)G 4; limited to assisting utilities in determining the' design'-basis conditions,for; l

motor-operated valves' at BWR plants. Consequently, the staff does notLexpect changes:regarding your-commitment to the GL will be necessary as a result;of etforts by-the/BWOG.

P 9006260385 900618 gr

~

PDR ADOCK 05000458 l

d P-PDC i

1-v a

~

4,

--'n-r----

  • 1 Hr'. James C. Deddens As indicated'in GL 89-10, pursuant to 10' CFR 50.54(f) you are required to advise the NRC in writing whether the reconnendations and schedule. outlined in the generic letter will be met.. In addition, you are required to identify any.reconnendations or dates that will not be net-and to provide technical

- justification.and any proposed alternatives. Because of the limited nature of the effort by the BWOG, your request,for extension, based on that effort, is not acceptable for extension of the date for submission of a response to GL 89-10.

By telecon on May 22, 1990, your staff stated' that your modified response to.

the GL will be provided by June 28, 1990.

Sincerely,.

original signed byr Walter A'.cPaulson, Project Manager Project Directorate IV-2 Division of Reactor Projects.- III, gi IV, V and Special Projects Office:of Nuclear Reactor Regulation cc: See next page DISTRIBUTION:

. DocketJ1' lea

(

NRC PDR-Local PDR PDIV-2 Reading PDIV-2. Plant File GHolahan WPaulson ACRS (10) 0GC I

CGrimes l

EJordan (MS MNBB-3701) l LConstable, Region IV l

EPeyton AGody p

LBMarsh'

[

h h

l OFC : FDIV-2/LA :P[IV,-?ffM

EMEB
PDIV-2/D/jfj m3 :

/My-a.

j0W^

HAME : EPEyT6Ti

WlVuTd'on
DMarsh y Grimes

'DATE : 6/Co/90

6/V /90
6/y90

' :6//fr/90 0FFICIAL RECORD COPY 4

t

r$m

.,.?

Mr. James C. Deddens ' cc:

Troy B. Conner, Jr., Esq.

Ms. H. Anne Plettinger Conner and Wetterhahn 3456 Villa Rose Drive 1747 Pennsylvania Avenues NW Baton Rouge, Louisiana 70806 Washington, D.C. =20006 Mr. Les England

~

Director - Nuclear Licensing Gulf States Utilities Company P.~ 0. Box 220 St. Francisville, Louisiana 70775 Mr. Philip G. Harris Cajun Electric Power Coop. Inc.

10719 Airline Highway P. O. Box 15540 Baton Rouge, Louisiana 70895 Senior Resident Inspector-P. O. Box 1051 St. Francisville, Louisiana 70775 President of West Feliciana Police Jury P. 0.' Box 1921 St. Francisville, Louisiana. 70775 Regional Administrator, Region' IV U.S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 1000 Arlington, Texas 76011 Mr. J. E. Booker Manager-Nuclear Industry Relations P. O. Box 2951 Beaumont, Texas 77704 Mr. William H. Spell, Administrator Nuclear Energy Division Office of Environmental Affairs P. O. Box 14690 Baton Rouge, Louisiana 70898 Mr. J. David McNeill, III William G. Davis, Esq.

Department of Justice Attorney General's Office P. O. Box 94095 Baton Rouge, Louisiana 70804-9095

. _)