McGUIRE NUCLEAR STATION i
MONTHLY OPERATING STATUS REPORT
^
i April 1990 1.
Personne]. Exposure -
For the'Itonth of April, 1 individual (s) exceeded 10 percent of their allowable annual ~ radiation dose l'imit with the highest c ose being 1.203 rem, which represents approximately i
10% of1that person's allowable annual limit.
~
2.
The~ total station liquid release for April has been compared with the Technical Specifications maximum annual dose.
I commitment and was less than 10 percent ~of_this limit.
The total station gaseous release for April has-been compared with the Technical Specifications maximum annual 4
dose commitment and was less than 10 percent of this list.
9006190133 900613 PDR R
ADOCK 05000369 PDC J
'w_
=
,_4
-g.,.
A, REVISION 1
~ UNIT SHUTDOWNS.AND'. POWER REDUCTIONS' DOCirr NO.
50-363 UNIT NAME nu,01Rh 1 DATE' ob/13/ v u REPORT. MONTH April'1990 COMPLETED BY, s.
w.
MusbH TELEPHONE
(/U4)-J/J-D/b2 I(1)
(2)
(3).
(4)
(5) l R
MET-
^'
E HOD I
N S
IUT SYS-CAUSE AND CORRECTIVE O
P DURATION O
DOWN REPORT TEM COMPONENT ACTION TO DATE E
HOURS N
R/X NO.
CODE CODE PREVENT RECURRENCE
'90 1 S
659.00 C
RC FUELXX
'END OF CYCLE
'6' REFUELING OUTAGE.
4 90- 4-28 S
60.00' B
CC HTEXCH 2 DAY OUTAGE EXTENSION DUE TO STEAM GENERATOR TUBE SLEEVING (1)
(2)
(3)
(4)
F Forced Reason-Method:
Exhibit G - Instructions A-Equipment'FailureB-Maintenance or test (Explain)
S Scheduled 1-Manual for Preparation of Data' 2-Manual Scram Ent y Sheets For Licensee C-Refueling 3-Automatic Scram 4-Other (Explain)
File- (NUEG-0161) )