' OPERATIN6 DATA REFORT DOCKET NO' 50-369 DATE.7une 15.1990 k,,'
- QP[RATINGSTATUS COMPLETEDBY' R.A. Willians 1
TELEPHONE 704-373-5987 i
F
- 1. Ucit Nase: McC. lite !
E 12 Piportir.; 'rerlodi May 1,1990-May 31,1990 '
7 b, - 3. Licensed Thereal Power (MWt): '
3411 4
-t
- 4. Naseplate Rating (Bross MWe):
'1305t Notes eNaseplate Rating gi LW Design Electrical Rating (Net MWe):
1180 (Bross MWe) calculated as W
6.MaxisueDependableCapacity(6rossMWe): ~1171 1450 P 0 MVA x 90 power
- 7. Maxleve Dependable Capacity (Net MWe):
!!29
. facto, per Page 111, R
8.-1f Changes Occur in Capacity Ratings (Itees Number 3 Through 7) Since Last
-NURE6-0020.
4 >
LReport.=SiveReasons:
=
.9. Power Level To Which Restricted, lf Any (Net NWe):
. 10. Reason For Restrictions, if any:
o s
This Month Yr.-to-Date Cuaulative 1
- !!. Hours In Reporting Period 7%.0 3623.0 74495.0
-12.NueberOfHoursReactorWasCritical 315.1 493.3 51351.5 i
E
- 13. Reactor Reserve Shutdown Hours
--0--
--0--~
' --0--
L
- 14. Hours Generator On-Line 273.4-451.7 50750.5 h
.15. Unit Reserve Shutdown Hours -
--0--
- =
--0--
1
- 16. Bross Thereal Energy 6enerated (MWH) 521935
~!!30237
~152530970~
h 17.GrossElectricalEnergyGenerated(MWH1
'!60541 371542
-52599219
- 18. Net Electrical Energy Generated (MWH)~
138076' 321522 IE207905 j
- 19. Unit Service Factor 36.8 12.5 68.1 J,
s
- 20. Unit Availab!!ity Factor 36.0 12.5 68.l'
~
21.-UnitCapacityFactor(UsingMDCNet) 16.4 7.9 58.2 ce p
- 22. Unit Capacity Factor (Using DER Net) 15.7 7.5
-57.1 1
g"
. 23. Unit Forced Dutage Rate-0.0 27.0 12.5
- 24. Shutdenn Scheduled Over Next 6 Months (Type, Date, and-Duration of Each) -
~Nnno r
'25.';If Shut Down At End Of Report Period. Estimated Date of Startup:
- 26. Units In Test Status (Prior to lossercial Operation):
Forecast Achieved I
INITIAL CRITICALITY m@
INiilALELECTRICITY COMERCIAL OPERATION hh hCK
\\
a 4
y 4
C:@fX ' 7
~
k-f m y;
($hM$.
I t _ _ y;, m- -.
.h.-
j tw
. v.
n l0PEEATIN6 DATA REPORT-ot:.
'1
^@
4 4
DOCKET NO 50-369' UNil -
McGuire 1 DATE June 15,1990 _ _ _
COMPLETED BY - R. A. Willians,
TELEPHONE - 704-373 5987 s
'n. '
' MONTH MAY. 1990-L Q9.1
'AVERABE P411.Y POWER LEVEL
' QA1 AVERASE DAILY PDWER LEVEL
}'?.
-UWe-Net),
(MWe-Net)
[1 o
17 o'
y 4
l c-
[2 -
0-18 0
- - 3 :_
. 0 19-0 --
- 42 0
. 20 -
0
,5 0
21
' 93 i 6j 0'
22 360
[t; >
- _7 -
0-23 710~
1 x
s :=-
'e 0
- 24 '
942-a..
'9-0 25 1111 s
- 101
-0 26' 858 4
a 0 28 502 I
.s v:.
' 13 0
29 311 14' 0'
' 30 311
- i
- 13 '-
0-31 311
.,i.
. '16.
0
)
j t
s k',-
r 3
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.
50-369-PAGE 1 OF 4 UNIT NAME MCuulxt 1 DATE ub/id/9u REPORT MONTH May 1990 COMPLETED BY s.
w.
Mustx TELEPHONE
(/vej-3/J-d/ez (1) 2)
(4)
(5)
E HOD T
A OF LICENSE N
Y S
SHUT EVENT SYS-CAUSE AND CORRECTIVE O
P DURATION O
DOWN REPORT TEM COMPONENT ACTION TO DATE E
HOURS N
R/X NO.
CODE CODE PREVENT RECURRENCE 4
90 1 S
60.00 B
CC HTEXCH 3 DAY OUTAGE EXTENSION DUE TO STEAM GENERATOR TUBE SLEEVING CC HTEXCH 1 DAY OUTAGE EXTENSION DUE TO STEAM 5
90 3 S
24.00 B
GENERATOR TUBE PULLING EQUIPMENT AVAILABILITY 6
90 4 S
288.00 B
HA TURBIN 12 DAY OUTAGE EXTENSION DUE TO ADDITIONAL HIGH PRESSURE TURBINE BLADE RING WORK 7
90- 5-16 8
72.00 B
IA INSTRU 3 DAY OUTAGE EXTENSION DUE TO INSPECTION OF REACTOR PROTECTION SYSTEM TERMINAL CLIPS 8
90- 5-19 S
25.52 B
CH PUMPXX 1 DAY OUTAGE EXTENSION DUE TO AUXILIARY FEEDWATER PUMP OUTBOARD BEARING WORK (1)
(2)
(3)
(4)
F Forced Reason-Method:
Exhibit G - Instructions A-Equipment FailureB-Maintenance or test (Explain)
S Scheduled 1-Manual for Preparation of, Data 2-Manual Scram Ent U Sheets For Licensee C-Refueling 3-Automatic Scram Event Report (LER
( M EG-Ol61))
D-Regulato W Restriction 4-Other (Explain)
File E-Operator Training & License Examination F-Administrative (5)
(Explain) (Explain)
Exhibit I - Same Source G-Operator Error H-Other
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.
50-369 PAGE 2 OF 4 UNIT NAME Muuu1ME 1 DATE 06/13/ v u REPORT MONTH May 1990 COMPLETED BY s.
w.
Must,x TELEPHONE
(/ug)-afa-oidz l
(1)
- 2) g_
(4)
(5)
E HOD T
A OF LICENSE N
Y S
SHUT EVENT SYS-CAUSE AND CORRECTIVE O
P DURATION O
DOWN REPORT TEM COMPONENT ACTION TO DATE E
HOURS N
R/X NO.
CODE CODE PREVENT RECURRENCE 2-P 90- 5-20 S
B HA TURBIN HOLD FOR TURBINE SOAK 3-P 90- 5-21 S
B HA TURBIN LOAD REDUCTION FOR TURBINE OVERSPEED TEST 9
90- 5-21 S
1.07 B
1 HA TURBIN TURBINE OVERSPEED TRIP TEST 4-P 90- 5-21 S
B IE INSTRU HOLD FOR NUCLEAR INSTRUMENTATION CALIBRATION 5-P 90- 5-21 S
B CG ZZZZZZ HOLD FOR REACTOR COOLANT CHEMISTRY OXYGEN CONSIDERATIONS 6-P 90- 5 S B
RC ZZZZZZ HOLD FOR CORE FLUX MAPPING 7-P 90- 5-22 F
A CH PUMPXX HOLD FOR MAIN FEEDWATER PUMP
'B' CONTROLS (1)
(2)
(3)
(4)
F Forced Reason-Method:
Exhibit G - Instructions A-Equipment FailureB-Maintenance or test (Explain) 1-Manual for Preparation of, Data S Scheduled 2-Manual Scram Ent U Sneets For Licensee C-Refueling 3-Automatic Scram Event Report (LER (NU E'G-Ol61))
D-Regulaton Restriction 4-Other (Explain)
File E-Operator Training & License Examination F-Administrative (5)
G-Operator Error (Explain)
Exhibit I - Same Source H-Other (Explain)
-~
. g UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.
50-369~
PAGE 3 OF 4 UNIT NAME nuuulxt 1 DATE o6/id/9u REPORT MONTH May 1990 COMPLETED BY s.
- w. MusEM TELEPHONE (Iu4J-J/J-D/62 I
(1)
- 2) g_
(4)
(5)
E HOD T
A OF LICENSE N
Y S
SHUT EVENT SYS-CAUSE AND CORRECTIVE O
P DURATION O
DOWN REPORT TEM COMPONENT ACTION TO DATE E
HOURS N
R/X NO.
CODE CODE PREVENT RECURRENCE 8-P 90- 5-23 S
B IE INSTRU HOLD FOR NUCLEAR INSTRUMENTATION CALIBRATION 9-P 90- 5-23 S
B RC ZZZZZZ HOLD FOR CORE FLUX MAPPING 10-P 90- 5-24 S
B CJ ZZZZZZ HOLD FOR REACTOR GROUP THERMAL OUTPUT DATA GATHERING 11-P 90- 5-26 F
A HA TURBIN HIGH PRESSURE TURBINE STEAM LEAK 12-P 90- 5-26 F
A HA TURBIN HOLD TO PREVENT DAMAGE DUE TO STEAM LEAK 13-P 90- 5-26 F
A HA TURBIN DECREASE DUE TO TURBINE STEAM LEAK 14-P 90- 5-26 F
A HA TURBIN HOLD FOR LEAK REPAIR 15-P 90- 5-27 F
A HA TURBIN DECREASE DUE TO TURBINE STEAM LEAK (1)
(2)
(3)
(4)
F Forced Reason-Method:
Exhibit G -' Instructions S Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of, Data B-Maintenance or test 2-Manual Scram Ent W Sheets For Licensee C-Refueling-3-Autoraatic Scram Event Report (LER File (NUEG-0161) )
D-Regulaton Restriction 4-Othe.r (Explain)
E-Operator Training & License Examination F-Administrative (5)
G-Operator Error (Explain)
Exhibit I - Same Source H-Other'(Explain)
. - - +..
g w
y
.g.
UNIT SHUTDOWNS AND POWER REDUCTIONS-DOCKET NO..
50-369
.PAGE.4^OF-4 UNIT NAME nusuixt 1 DATE ub/13/ vu REPORT MONTH-May 1990 COMPLETED BY.-
s.
w.
nossa TELEPHONE tius1-J/J-b/b2 (1)
A)
(2 (3)
(4)
(5).
lPlET-E HOD T
A OF LICENSE N
Y S
SHUT EVENT SYS-CAUSE AND CORRECTIVE O
P DURATION O
DOWN REPORT TEM COMPONENT ACTION TO DATE E
HOURS N
R/X NO.
CODE CODE PREVENT RECURRENCE 16-P 90- 5-27 F
A HA TURBIN HOLD FOR LEAK REPAIR 17-P 90- 5-28 F
A HA TURBIN DECREASE DUE TO TURBINE STEAM LEAK 18-P 90- 5-28 F
A HA TURBIN HOLD FOR LEAK REPAIR (1)
(2)
(3)
(4)
F Forced Reason-Method:
Exhibit G - Instructions A-Equipment FailureB-Maintenance or test (Explain)
S Scheduled 1-Manual for Preparation of, Data 2-Manual Scram Ent W Sneets For Licensee C-Refueling.
3-Automatic Scram Eyent Re G-0161))
rt (LER D-Regulato n Restriction 4-Other (Explain)
File (
E-Operator Training & License. Examination F-Administrative (5)
G-Operator Error (Explain)
Exhibit I - Same Source H-Other (Explain)
- w..
m.
~~
g T.
e.-
t
) !..
t t
DOCKET No:
50 369-f UNIT: McGuire 1 f
DATE:
06/15/90 NARRATIVE
SUMMARY
j t
MONTH:. May 19901 e
cMcGuire Unit'1 began the month of May shut-down for_its End-0f Cycle
'6' refueling outage. -The unit returned on-line at 1331 on 05/20 after a 22 day outage extension due primarily to additional work on the Steam-Generators and High Pressure Turbine blade rings. The unit was taken q
off line at 0531 on 05/21 for its Turbine overspeed trip test, The unit n
L j
.was placed back on-line at 0636 on.05/21. During the subsequent power cincrease, the. unit was held atf30% power from.1718 to 2252 on 05/21
.f due to Chemistry oxygen concerns. The unit was then. held at 38% power from 0140 to 0911 on 05/22 for. core flux mapping. The: increase was.
next secured at 47% power from 1321 to 2020 on 05/22:for the repair of
~
l'
'the-'B' Main Feedwater Pump. The unit-was next heldlat-52% power from 0235 to 0313fon 05/23 for. Nuclear Instrumentation calibration. The next-i hold, at.78% power, was conducted from 1717 on 05/23 to 0702 on 05/24
't y
for core flux mapping. The unit was then held-at 83% power from 1250 to 1700 on 05/24:for Reactor Group thermal output data gathering. The t
unit reached 100% full power at 2130 on-05/24..At 0945 on 05/26, the 1
'High Pressure Turbine developed a steam leak,:and a load reduction was commenced.:lThe reduction:was secured at 70% power from 1350 to 1830 on s
05/26. :A't 1830 on_05/26, the unitLcommenced a l'ond reduction to 38%-
1
' power for leak repair of the;High Pressure-Turbine. The unit reached l
38% power at 2142 on 05/26. A load increase was begun at 0445 on.
ej 05/27.
The. increase =was stopped at 87% power at 1641 on 05/27 for leak repair.
At 2130.on 05/27-,' the: unit commenced a load reduction for' leak-
' repair. -The unit' reached 38% powar at.1259 on 05/28, and operated at this' level for the romainder of the month.
H i
i Prepared by:
S. W. Moser
]
l Telephone:
704-373 5762 i
i.
MONTHLY REFUELING INFORMATION REQUEST 1.
Facility name: McGuire, Unit 1 2.
Scheduled next refueling shutdown:
July 1991 a
3.
Scheduled restart following refueling: September 1990 4.
Will refueling or resumption of operation thereafter require a technical specification change or other license amendment? No i
If yes, what will these be?
-If no, has reload design and core configuration been reviewed by Safety Review Committee regarding.unreviewed safety questions? N/A 5.
Scheduled date(s) for submitting proposed licensing action and supporting information:
N/A 6.
Important' licensing considerations (new or different design or supplier,
-unreviewed design or performance analysis methods, significant changes in-design or new operating procedures).
7.
Number of fuel assemblies (a) in the core:
193 (b) in the spent fuel pool: 445
[
8.
Present licensed fuel pool capacity:
1463 Size of requested or planned increase:
i
- 9. - Projected date of latt refueling which can be accommodated by present licensed capacity: March 2006
. DUKE POWER COMPANY DATE:
June 15, 1990
'Name of
Contact:
J. A. Reavis Phone:
704-373-7567 i
pyy y.
?? -* )
y C
n OPERATING DATA REPORT
.. n -
y DOCKET NO-50-370 DATE June 15. 1990 OPERATING STATUS COMPLETEDBY R.A. Willians-TELEPHDME 704 373-5987 1.. Unit Naee McGuire 2 2.'ReportingPeriod:May1,1990-May31,1990 a
- 3. Licensed Thersal Power (MWt):-
3411.
4.~ Naseplate Rating (6 toss MWe):'
13051 l
Notes INameplate Rating.
O
-5.lDesignElectricalRating(NetMWe):-
1880 :
(6 toss MWel calculated as 16..MaxinusDependableCapacity-(BrossMWe):.
1171 1450.000 MVA x.90 power E-7.;ManleueDependableCapacity(NetMWe):~
1129 factor per Page lit, l
- 8. It Changes Occur in Capacity Ratings (Itees Nueber 3 Through 7) Since Last NURE6-0020.
, Report. Sive Reasons:
1
- 9. Pouc Level To Which Restricted, if Any (Net MWe):
310. Reason For Restrictions,_If any:
This Month:
Yr.-to-Date-Cueulative l
q
'll[HoursinReporting1 Period 744.0.
3623.0
.54791.0-
!!2.-NumberOfHoursReactorWasCritical 744.0
-3623.0 42325.B:
x 13.ReactorReserveShutdownHours
--0--
- =
~0--
~
g
- 14.; Hours 6enerator On-Line 744.0 3623.0 41551.0~
J15.UnitReserveShutdownHours
'--0--
--0--
--0--
.16. 6ross Thereal Energy:6enerated-(MWH).
2474047 12133164 135394434-17.GrossElectricalEnergyGenerated(MWH)l 865025 4261320
~47443901 l
'.18.NetElectricalEnergyBenerated(MWH)
-B32697 4106562-45509459 j
- 19. Unit Service Factor 100.0 100.0 75.0 i
20.fUnitAvailabilltyFactor 100.0' 100.0 75.8
- 21. Unit Capacity Factor (Using MDC Net) 99.1 100.4-
- 72. 2..
- i l
l22.UnitCapacityFactor(UsingDERNet) 94.0 96.1 70.4
- 23. Unit Forced Outage Rate 0.0 -
0.0 9.4
- 24. Shutdoin Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
d Refoolinn - Rontomhor 1.
100n~
11 w at<e j!
- 25. lf Shut.Down At End Of Report Period. Estimated Date of Startup:
'26lUnitsInTestStatus.-IPriortoCoseercialOperation):
Forecast
. Achieved
]
7, 1
I INITIAL CRITICALITY l
INiilAL ELECTRICITY
{
COMMERCIALOPERATION
{
i If g
w,
-Y.-w N L4 qE ~ -- n r*
- q' -?
=4
' M*;
'GilJ {
, W up v 3
.p.
s '-
s
^t
. ;. < ? :
_^
t t
.]
,(
- j. -
i d
it;
m a
4
- - 9_7 hh l
v 9,7 OPERATIN6 DATA REPORT :
O
.. p i
k DOCKET N0' 1
'50 370' o
t c1
- UWii McGuire 2-
-t e
DATE. Tune '15. !990 -
COMPLETED BY ' R.k. Willians -
d 1
l M
(TELEPHDNE - 704-373-5987 y
4, 0,
.a hl g
A
= MONTH" - May. 1990-1 1v 1 i
_g e
ie. t
/4 i QE
~AVERA6E-DAILYPOWERLEVEL' IM-
'.AYERA6E DAILY POWER LEVEL
~
(MWe-Net)<
0 (MWe-Net):
)
t fli Jil54 17 1147 i
-q
=1153-IB' 1144 4[
$+ ' t2h
,n_
[
i-
. ' 3 )-
'1149-19 1133 i
g.;
7 99
- 4;
=1153 20 1146-Si st m
3 A,
'g..
- 562s 21 1147-~
9' 1
f 61, 1977'
'22 1145-l j.
E.
4; 1140'
'23
-1145 J'
l.:
y-
~.
" 1151-24-
'1146' 8
,et;! -
- s 4
9L 1151 '
25 1145-1 i
M
,l g.
- .10,
1152-26 1114 n
e
(
>p
- l1;
-1151 27 1097
%(
y V
'.12i '
'1134 20~
1138' j
'i 1(p Gs jl3 1150' 29-1142 l1
'a,
.t i> n 14a 1149 30 1143
_d a
n lh
.i
_e
'A 115L 1144 -
31 1142 r
pm
.1
<y a'
.-16
'1146' a
q.,
lp.
a q
_ m. -
1-.
6
-l
.y j.,
- i
- h k f.,
4 I
- p..
.(
j y![l. (
S-
% Q;j '
- /iexv _-;I 5. '
-)
Q,pi?.w 7
1
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.
50-370' ~
UNIT NAME rtwulus 2 DATE. 06/1:>/ v u REPORT MONTH-May 1990 COMPLETED BY
.5.
w.
Plusz.x TELEPHONE t/v4)-J/J-3/b2 -
(1) 2)
(4)
(5)
E HOD T
A OF LICENSE N
Y S
SHUT EVENT SYS-CAUSE AND CORRECTIVE--
O P
DURATION O
DOWN REPORT TEM COMPONENT ACTION TO DATE E
HOURS N
R/X
-NO.
CODE CODE PREVENT RECURRENCE 14-P 90 5 F
A CB PUMPXX REACTOR COOLANT PUMP LOW OIL PRESSURE 15-P 90 5 F
A CB PUMPXX ADDITION OF OIL TO '2A' REACTOR COOLANT PUMP 16-P 90 5 S
F ZZ ZZZZZZ HOLD PER DISPATCHER REQUEST 17-P 90 6 S
B IE INSTRU HOLD DUE TO NUCLEAR INSTRUMENTATION CALIBRATION (1)
(2)
(3)
(4)
F Forced Reason-Method:
Exhibit G - Instructions A-Ecuihment FailureB-Mdintenance or test (Explain)
S Scheduled 1-Manual for Preparation of Data 2-Manual Scram Ent y Sneets For Licensee C-Refueling 3-Automatic Scram-Event Re D-RegulatoW Restriction 4-Other (Explain)
File (
G-0161))
rt (LER E-Operator Training & License Examination F-Administrative (5)
G-Operator Errgr (Explain)
Exhibit'I - Same Source H-Other (Explain)
w, w M
.7",
((
rrl
~
.t
- i-s 4
c E
w-
- 1.j p n..3 i!
1e L
I 4
t T
- DOCKET NO.: {50 370
- i
-UNIT: McGuiro 2'-
]
g' l
'DATE: 106/15/90
-[
l
.,y-
\\
-NARRATIVE
SUMMARY
- MONTH:.May.1990 a
s 4
i HcCuire Unit-2 began the month of May operatingLat 100%;fu11 poweri j
4 The; unit-operated at-or near 100% full power until:-0100 on 05/054, ;wheni j
'I the unit began a load reduction for oil addition-to-Reactor Coolant =
f 1
- t,
+
t Pump '2A'.
The unit was held at 14%' power from 1227 to 1400 on.05/05-L}
-while oil was'added~to the pump.
During the subsequent. power: increase,
}
the unit was held:at 71% power from 2120 on 05/05 to.0736 on'05/06 due-
~
3 to Dispatcher request. _The unit was next held at 95% power from 1322.
ly to 1847-on:05/06 for._ Nuclear Instrumentation calibration.
The unit'
-6 reached l'00% full-, power at:2110-'on 05/06,1and' operated =at.or near_100%
.fullLpower for.the remainder of'the. month.
}
w k
i[. l d
m lN;
- l l
1 e
Lt,
! $ E,
>g-
-Prepared by:
S. W. Moser tTelephone:
704-373-5762 E
1',1 ';
I
I
'i t
MONTHLY REFUELING INFORMATION REQUEST 1.
Facility name: McGuire, Unit 2 2.
Scheduled next refueling shutdown:
September 1990 3.
Scheduled restart following refueling: November 1990 4.
Will refueling or resumption of operation thereafter require a technical specification change or other license amendment? No i
If yes, what will these be?
If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions? N/A 5.
Scheduled date(s) for submitting proposed licensing action and supporting information:
N/A Important licensing considerations (new or different design or supplier, 6.. :unreviewed design or performance analysis methods, significant changes in design or new operating procedures).
1 7.
Number of fuel assemblies (a) in the core: 193 (b) in the spent fuel pool:
590 8.
Present licensed fuel pool capacity:
1463 Size of requested or planned increase:
9.
Projected date of last refueling which can be accommodated by present licensed capacity:
December 2003 DUKE POWER COMPANY DATE:
June 15, 1990 l
Name of
Contact:
J. A. Reavis Phone: