Monthly Operating Repts for May 1990 for McGuire Nuclear Station
ML20043G157
Person / Time
Site: McGuire, Mcguire  Duke Energy icon.png
Issue date: 05/31/1990
From: Moser S, Robert Williams
DUKE POWER CO.
To:
Shared Package
ML20043G154 List:
References
NUDOCS 9006190131
Download: ML20043G157 (13)


Text

&, 1

- t

v yp.

f 11

'l

.j b

9

' OPERATIN6 DATA REFORT DOCKET NO' 50-369 DATE.7une 15.1990 k,,'

QP[RATINGSTATUS COMPLETEDBY' R.A. Willians 1

TELEPHONE 704-373-5987 i

F

1. Ucit Nase: McC. lite !

E 12 Piportir.; 'rerlodi May 1,1990-May 31,1990 '

7 b, - 3. Licensed Thereal Power (MWt): '

3411 4

-t

4. Naseplate Rating (Bross MWe):

'1305t Notes eNaseplate Rating gi LW Design Electrical Rating (Net MWe):

1180 (Bross MWe) calculated as W

6.MaxisueDependableCapacity(6rossMWe): ~1171 1450 P 0 MVA x 90 power

7. Maxleve Dependable Capacity (Net MWe):

!!29

. facto, per Page 111, R

8.-1f Changes Occur in Capacity Ratings (Itees Number 3 Through 7) Since Last

-NURE6-0020.

4 >

LReport.=SiveReasons:

=

.9. Power Level To Which Restricted, lf Any (Net NWe):

. 10. Reason For Restrictions, if any:

o s

This Month Yr.-to-Date Cuaulative 1

- !!. Hours In Reporting Period 7%.0 3623.0 74495.0

-12.NueberOfHoursReactorWasCritical 315.1 493.3 51351.5 i

E

13. Reactor Reserve Shutdown Hours

--0--

--0--~

' --0--

L

14. Hours Generator On-Line 273.4-451.7 50750.5 h

.15. Unit Reserve Shutdown Hours -

--0--

- =

--0--

1

16. Bross Thereal Energy 6enerated (MWH) 521935

~!!30237

~152530970~

h 17.GrossElectricalEnergyGenerated(MWH1

'!60541 371542

-52599219

18. Net Electrical Energy Generated (MWH)~

138076' 321522 IE207905 j

19. Unit Service Factor 36.8 12.5 68.1 J,

s

20. Unit Availab!!ity Factor 36.0 12.5 68.l'

~

21.-UnitCapacityFactor(UsingMDCNet) 16.4 7.9 58.2 ce p

22. Unit Capacity Factor (Using DER Net) 15.7 7.5

-57.1 1

g"

. 23. Unit Forced Dutage Rate-0.0 27.0 12.5

24. Shutdenn Scheduled Over Next 6 Months (Type, Date, and-Duration of Each) -

~Nnno r

'25.';If Shut Down At End Of Report Period. Estimated Date of Startup:

26. Units In Test Status (Prior to lossercial Operation):

Forecast Achieved I

INITIAL CRITICALITY m@

INiilALELECTRICITY COMERCIAL OPERATION hh hCK

\\

a 4

y 4

C:@fX ' 7

~

k-f m y;

($hM$.

I t _ _ y;, m- -.

.h.-

j tw

. v.

n l0PEEATIN6 DATA REPORT-ot:.

'1

^@

4 4

DOCKET NO 50-369' UNil -

McGuire 1 DATE June 15,1990 _ _ _

COMPLETED BY - R. A. Willians,

TELEPHONE - 704-373 5987 s

'n. '

' MONTH MAY. 1990-L Q9.1

'AVERABE P411.Y POWER LEVEL

' QA1 AVERASE DAILY PDWER LEVEL

}'?.

-UWe-Net),

(MWe-Net)

[1 o

17 o'

y 4

l c-

[2 -

0-18 0

- 3 :_

. 0 19-0 --

42 0

. 20 -

0

,5 0

21

' 93 i 6j 0'

22 360

[t; >

_7 -

0-23 710~

1 x

s :=-

'e 0

- 24 '

942-a..

'9-0 25 1111 s

101

-0 26' 858 4

a 0 28 502 I

.s v:.

' 13 0

29 311 14' 0'

' 30 311

i
13 '-

0-31 311

.,i.

. '16.

0

)

j t

s k',-

r 3

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.

50-369-PAGE 1 OF 4 UNIT NAME MCuulxt 1 DATE ub/id/9u REPORT MONTH May 1990 COMPLETED BY s.

w.

Mustx TELEPHONE

(/vej-3/J-d/ez (1) 2)

(4)

(5)

E HOD T

A OF LICENSE N

Y S

SHUT EVENT SYS-CAUSE AND CORRECTIVE O

P DURATION O

DOWN REPORT TEM COMPONENT ACTION TO DATE E

HOURS N

R/X NO.

CODE CODE PREVENT RECURRENCE 4

90 1 S

60.00 B

CC HTEXCH 3 DAY OUTAGE EXTENSION DUE TO STEAM GENERATOR TUBE SLEEVING CC HTEXCH 1 DAY OUTAGE EXTENSION DUE TO STEAM 5

90 3 S

24.00 B

GENERATOR TUBE PULLING EQUIPMENT AVAILABILITY 6

90 4 S

288.00 B

HA TURBIN 12 DAY OUTAGE EXTENSION DUE TO ADDITIONAL HIGH PRESSURE TURBINE BLADE RING WORK 7

90- 5-16 8

72.00 B

IA INSTRU 3 DAY OUTAGE EXTENSION DUE TO INSPECTION OF REACTOR PROTECTION SYSTEM TERMINAL CLIPS 8

90- 5-19 S

25.52 B

CH PUMPXX 1 DAY OUTAGE EXTENSION DUE TO AUXILIARY FEEDWATER PUMP OUTBOARD BEARING WORK (1)

(2)

(3)

(4)

F Forced Reason-Method:

Exhibit G - Instructions A-Equipment FailureB-Maintenance or test (Explain)

S Scheduled 1-Manual for Preparation of, Data 2-Manual Scram Ent U Sheets For Licensee C-Refueling 3-Automatic Scram Event Report (LER

( M EG-Ol61))

D-Regulato W Restriction 4-Other (Explain)

File E-Operator Training & License Examination F-Administrative (5)

(Explain) (Explain)

Exhibit I - Same Source G-Operator Error H-Other

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.

50-369 PAGE 2 OF 4 UNIT NAME Muuu1ME 1 DATE 06/13/ v u REPORT MONTH May 1990 COMPLETED BY s.

w.

Must,x TELEPHONE

(/ug)-afa-oidz l

(1)

2) g_

(4)

(5)

E HOD T

A OF LICENSE N

Y S

SHUT EVENT SYS-CAUSE AND CORRECTIVE O

P DURATION O

DOWN REPORT TEM COMPONENT ACTION TO DATE E

HOURS N

R/X NO.

CODE CODE PREVENT RECURRENCE 2-P 90- 5-20 S

B HA TURBIN HOLD FOR TURBINE SOAK 3-P 90- 5-21 S

B HA TURBIN LOAD REDUCTION FOR TURBINE OVERSPEED TEST 9

90- 5-21 S

1.07 B

1 HA TURBIN TURBINE OVERSPEED TRIP TEST 4-P 90- 5-21 S

B IE INSTRU HOLD FOR NUCLEAR INSTRUMENTATION CALIBRATION 5-P 90- 5-21 S

B CG ZZZZZZ HOLD FOR REACTOR COOLANT CHEMISTRY OXYGEN CONSIDERATIONS 6-P 90- 5 S B

RC ZZZZZZ HOLD FOR CORE FLUX MAPPING 7-P 90- 5-22 F

A CH PUMPXX HOLD FOR MAIN FEEDWATER PUMP

'B' CONTROLS (1)

(2)

(3)

(4)

F Forced Reason-Method:

Exhibit G - Instructions A-Equipment FailureB-Maintenance or test (Explain) 1-Manual for Preparation of, Data S Scheduled 2-Manual Scram Ent U Sneets For Licensee C-Refueling 3-Automatic Scram Event Report (LER (NU E'G-Ol61))

D-Regulaton Restriction 4-Other (Explain)

File E-Operator Training & License Examination F-Administrative (5)

G-Operator Error (Explain)

Exhibit I - Same Source H-Other (Explain)

-~

. g UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.

50-369~

PAGE 3 OF 4 UNIT NAME nuuulxt 1 DATE o6/id/9u REPORT MONTH May 1990 COMPLETED BY s.

w. MusEM TELEPHONE (Iu4J-J/J-D/62 I

(1)

2) g_

(4)

(5)

E HOD T

A OF LICENSE N

Y S

SHUT EVENT SYS-CAUSE AND CORRECTIVE O

P DURATION O

DOWN REPORT TEM COMPONENT ACTION TO DATE E

HOURS N

R/X NO.

CODE CODE PREVENT RECURRENCE 8-P 90- 5-23 S

B IE INSTRU HOLD FOR NUCLEAR INSTRUMENTATION CALIBRATION 9-P 90- 5-23 S

B RC ZZZZZZ HOLD FOR CORE FLUX MAPPING 10-P 90- 5-24 S

B CJ ZZZZZZ HOLD FOR REACTOR GROUP THERMAL OUTPUT DATA GATHERING 11-P 90- 5-26 F

A HA TURBIN HIGH PRESSURE TURBINE STEAM LEAK 12-P 90- 5-26 F

A HA TURBIN HOLD TO PREVENT DAMAGE DUE TO STEAM LEAK 13-P 90- 5-26 F

A HA TURBIN DECREASE DUE TO TURBINE STEAM LEAK 14-P 90- 5-26 F

A HA TURBIN HOLD FOR LEAK REPAIR 15-P 90- 5-27 F

A HA TURBIN DECREASE DUE TO TURBINE STEAM LEAK (1)

(2)

(3)

(4)

F Forced Reason-Method:

Exhibit G -' Instructions S Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of, Data B-Maintenance or test 2-Manual Scram Ent W Sheets For Licensee C-Refueling-3-Autoraatic Scram Event Report (LER File (NUEG-0161) )

D-Regulaton Restriction 4-Othe.r (Explain)

E-Operator Training & License Examination F-Administrative (5)

G-Operator Error (Explain)

Exhibit I - Same Source H-Other'(Explain)

. - - +..

g w

y

.g.

UNIT SHUTDOWNS AND POWER REDUCTIONS-DOCKET NO..

50-369

.PAGE.4^OF-4 UNIT NAME nusuixt 1 DATE ub/13/ vu REPORT MONTH-May 1990 COMPLETED BY.-

s.

w.

nossa TELEPHONE tius1-J/J-b/b2 (1)

A)

(2 (3)

(4)

(5).

lPlET-E HOD T

A OF LICENSE N

Y S

SHUT EVENT SYS-CAUSE AND CORRECTIVE O

P DURATION O

DOWN REPORT TEM COMPONENT ACTION TO DATE E

HOURS N

R/X NO.

CODE CODE PREVENT RECURRENCE 16-P 90- 5-27 F

A HA TURBIN HOLD FOR LEAK REPAIR 17-P 90- 5-28 F

A HA TURBIN DECREASE DUE TO TURBINE STEAM LEAK 18-P 90- 5-28 F

A HA TURBIN HOLD FOR LEAK REPAIR (1)

(2)

(3)

(4)

F Forced Reason-Method:

Exhibit G - Instructions A-Equipment FailureB-Maintenance or test (Explain)

S Scheduled 1-Manual for Preparation of, Data 2-Manual Scram Ent W Sneets For Licensee C-Refueling.

3-Automatic Scram Eyent Re G-0161))

rt (LER D-Regulato n Restriction 4-Other (Explain)

File (

E-Operator Training & License. Examination F-Administrative (5)

G-Operator Error (Explain)

Exhibit I - Same Source H-Other (Explain)

w..

m.

~~

g T.

e.-

t

) !..

t t

DOCKET No:

50 369-f UNIT: McGuire 1 f

DATE:

06/15/90 NARRATIVE

SUMMARY

j t

MONTH:. May 19901 e

cMcGuire Unit'1 began the month of May shut-down for_its End-0f Cycle

'6' refueling outage. -The unit returned on-line at 1331 on 05/20 after a 22 day outage extension due primarily to additional work on the Steam-Generators and High Pressure Turbine blade rings. The unit was taken q

off line at 0531 on 05/21 for its Turbine overspeed trip test, The unit n

L j

.was placed back on-line at 0636 on.05/21. During the subsequent power cincrease, the. unit was held atf30% power from.1718 to 2252 on 05/21

.f due to Chemistry oxygen concerns. The unit was then. held at 38% power from 0140 to 0911 on 05/22 for. core flux mapping. The: increase was.

next secured at 47% power from 1321 to 2020 on 05/22:for the repair of

~

l'

'the-'B' Main Feedwater Pump. The unit-was next heldlat-52% power from 0235 to 0313fon 05/23 for. Nuclear Instrumentation calibration. The next-i hold, at.78% power, was conducted from 1717 on 05/23 to 0702 on 05/24

't y

for core flux mapping. The unit was then held-at 83% power from 1250 to 1700 on 05/24:for Reactor Group thermal output data gathering. The t

unit reached 100% full power at 2130 on-05/24..At 0945 on 05/26, the 1

'High Pressure Turbine developed a steam leak,:and a load reduction was commenced.:lThe reduction:was secured at 70% power from 1350 to 1830 on s

05/26. :A't 1830 on_05/26, the unitLcommenced a l'ond reduction to 38%-

1

' power for leak repair of the;High Pressure-Turbine. The unit reached l

38% power at 2142 on 05/26. A load increase was begun at 0445 on.

ej 05/27.

The. increase =was stopped at 87% power at 1641 on 05/27 for leak repair.

At 2130.on 05/27-,' the: unit commenced a load reduction for' leak-

' repair. -The unit' reached 38% powar at.1259 on 05/28, and operated at this' level for the romainder of the month.

H i

i Prepared by:

S. W. Moser

]

l Telephone:

704-373 5762 i

i.

MONTHLY REFUELING INFORMATION REQUEST 1.

Facility name: McGuire, Unit 1 2.

Scheduled next refueling shutdown:

July 1991 a

3.

Scheduled restart following refueling: September 1990 4.

Will refueling or resumption of operation thereafter require a technical specification change or other license amendment? No i

If yes, what will these be?

-If no, has reload design and core configuration been reviewed by Safety Review Committee regarding.unreviewed safety questions? N/A 5.

Scheduled date(s) for submitting proposed licensing action and supporting information:

N/A 6.

Important' licensing considerations (new or different design or supplier,

-unreviewed design or performance analysis methods, significant changes in-design or new operating procedures).

7.

Number of fuel assemblies (a) in the core:

193 (b) in the spent fuel pool: 445

[

8.

Present licensed fuel pool capacity:

1463 Size of requested or planned increase:

i

9. - Projected date of latt refueling which can be accommodated by present licensed capacity: March 2006

. DUKE POWER COMPANY DATE:

June 15, 1990

'Name of

Contact:

J. A. Reavis Phone:

704-373-7567 i

pyy y.

?? -* )

y C

n OPERATING DATA REPORT

.. n -

y DOCKET NO-50-370 DATE June 15. 1990 OPERATING STATUS COMPLETEDBY R.A. Willians-TELEPHDME 704 373-5987 1.. Unit Naee McGuire 2 2.'ReportingPeriod:May1,1990-May31,1990 a

3. Licensed Thersal Power (MWt):-

3411.

4.~ Naseplate Rating (6 toss MWe):'

13051 l

Notes INameplate Rating.

O

-5.lDesignElectricalRating(NetMWe):-

1880 :

(6 toss MWel calculated as 16..MaxinusDependableCapacity-(BrossMWe):.

1171 1450.000 MVA x.90 power E-7.;ManleueDependableCapacity(NetMWe):~

1129 factor per Page lit, l

- 8. It Changes Occur in Capacity Ratings (Itees Nueber 3 Through 7) Since Last NURE6-0020.

, Report. Sive Reasons:

1

9. Pouc Level To Which Restricted, if Any (Net MWe):

310. Reason For Restrictions,_If any:

This Month:

Yr.-to-Date-Cueulative l

q

'll[HoursinReporting1 Period 744.0.

3623.0

.54791.0-

!!2.-NumberOfHoursReactorWasCritical 744.0

-3623.0 42325.B:

x 13.ReactorReserveShutdownHours

--0--

- =

~0--

~

g

14.; Hours 6enerator On-Line 744.0 3623.0 41551.0~

J15.UnitReserveShutdownHours

'--0--

--0--

--0--

.16. 6ross Thereal Energy:6enerated-(MWH).

2474047 12133164 135394434-17.GrossElectricalEnergyGenerated(MWH)l 865025 4261320

~47443901 l

'.18.NetElectricalEnergyBenerated(MWH)

-B32697 4106562-45509459 j

19. Unit Service Factor 100.0 100.0 75.0 i

20.fUnitAvailabilltyFactor 100.0' 100.0 75.8

21. Unit Capacity Factor (Using MDC Net) 99.1 100.4-
72. 2..
i l

l22.UnitCapacityFactor(UsingDERNet) 94.0 96.1 70.4

23. Unit Forced Outage Rate 0.0 -

0.0 9.4

24. Shutdoin Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

d Refoolinn - Rontomhor 1.

100n~

11 w at<e j!

25. lf Shut.Down At End Of Report Period. Estimated Date of Startup:

'26lUnitsInTestStatus.-IPriortoCoseercialOperation):

Forecast

. Achieved

]

7, 1

I INITIAL CRITICALITY l

INiilAL ELECTRICITY

{

COMMERCIALOPERATION

{

i If g

w,

-Y.-w N L4 qE ~ -- n r*

  • q' -?

=4

' M*;

'GilJ {

, W up v 3

.p.

s '-

s

^t

. ;. < ? :

IMP

_^

t t

.]

,(

j. -

i d

it;

m a

4

- 9_7 hh l

v 9,7 OPERATIN6 DATA REPORT :

O

.. p i

k DOCKET N0' 1

'50 370' o

t c1

UWii McGuire 2-

-t e

DATE. Tune '15. !990 -

COMPLETED BY ' R.k. Willians -

d 1

l M

(TELEPHDNE - 704-373-5987 y

4, 0,

.a hl g

A

= MONTH" - May. 1990-1 1v 1 i

_g e

ie. t

/4 i QE

~AVERA6E-DAILYPOWERLEVEL' IM-

'.AYERA6E DAILY POWER LEVEL

~

(MWe-Net)<

0 (MWe-Net):

)

t fli Jil54 17 1147 i

-q

=1153-IB' 1144 4[

$+ ' t2h

,n_

[

i-

. ' 3 )-

'1149-19 1133 i

g.;

7 99

4;

=1153 20 1146-Si st m

3 A,

'g..

562s 21 1147-~

9' 1

f 61, 1977'

'22 1145-l j.

E.

4; 1140'

'23

-1145 J'

l.:

y-

~.

" 1151-24-

'1146' 8

,et;! -

s 4

9L 1151 '

25 1145-1 i

M

,l g.

.10,

1152-26 1114 n

e

(

>p

l1;

-1151 27 1097

%(

y V

'.12i '

'1134 20~

1138' j

'i 1(p Gs jl3 1150' 29-1142 l1

'a,

.t i> n 14a 1149 30 1143

_d a

n lh

.i

_e

'A 115L 1144 -

31 1142 r

pm

.1

<y a'

.-16

'1146' a

q.,

lp.

a q

_ m. -

1-.

6

-l

.y j.,

i

- h k f.,

4 I

p..

.(

j y![l. (

S-

% Q;j '

/iexv _-;I 5. '

-)

Q,pi?.w 7

1

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.

50-370' ~

UNIT NAME rtwulus 2 DATE. 06/1:>/ v u REPORT MONTH-May 1990 COMPLETED BY

.5.

w.

Plusz.x TELEPHONE t/v4)-J/J-3/b2 -

(1) 2)

(4)

(5)

E HOD T

A OF LICENSE N

Y S

SHUT EVENT SYS-CAUSE AND CORRECTIVE--

O P

DURATION O

DOWN REPORT TEM COMPONENT ACTION TO DATE E

HOURS N

R/X

-NO.

CODE CODE PREVENT RECURRENCE 14-P 90 5 F

A CB PUMPXX REACTOR COOLANT PUMP LOW OIL PRESSURE 15-P 90 5 F

A CB PUMPXX ADDITION OF OIL TO '2A' REACTOR COOLANT PUMP 16-P 90 5 S

F ZZ ZZZZZZ HOLD PER DISPATCHER REQUEST 17-P 90 6 S

B IE INSTRU HOLD DUE TO NUCLEAR INSTRUMENTATION CALIBRATION (1)

(2)

(3)

(4)

F Forced Reason-Method:

Exhibit G - Instructions A-Ecuihment FailureB-Mdintenance or test (Explain)

S Scheduled 1-Manual for Preparation of Data 2-Manual Scram Ent y Sneets For Licensee C-Refueling 3-Automatic Scram-Event Re D-RegulatoW Restriction 4-Other (Explain)

File (

G-0161))

rt (LER E-Operator Training & License Examination F-Administrative (5)

G-Operator Errgr (Explain)

Exhibit'I - Same Source H-Other (Explain)

w, w M

.7",

((

rrl

~

.t

i-s 4

c E

w-

1.j p n..3 i!

1e L

I 4

t T

- DOCKET NO.: {50 370

i

-UNIT: McGuiro 2'-

]

g' l

'DATE: 106/15/90

-[

l

.,y-

\\

-NARRATIVE

SUMMARY

MONTH:.May.1990 a

s 4

i HcCuire Unit-2 began the month of May operatingLat 100%;fu11 poweri j

4 The; unit-operated at-or near 100% full power until:-0100 on 05/054, ;wheni j

'I the unit began a load reduction for oil addition-to-Reactor Coolant =

f 1

t,

+

t Pump '2A'.

The unit was held at 14%' power from 1227 to 1400 on.05/05-L}

-while oil was'added~to the pump.

During the subsequent. power: increase,

}

the unit was held:at 71% power from 2120 on 05/05 to.0736 on'05/06 due-

~

3 to Dispatcher request. _The unit was next held at 95% power from 1322.

ly to 1847-on:05/06 for._ Nuclear Instrumentation calibration.

The unit'

-6 reached l'00% full-, power at:2110-'on 05/06,1and' operated =at.or near_100%

.fullLpower for.the remainder of'the. month.

}

w k

i[. l d

m lN;

l l

1 e

Lt,

! $ E,

>g-

-Prepared by:

S. W. Moser tTelephone:

704-373-5762 E

1',1 ';

I

I

'i t

MONTHLY REFUELING INFORMATION REQUEST 1.

Facility name: McGuire, Unit 2 2.

Scheduled next refueling shutdown:

September 1990 3.

Scheduled restart following refueling: November 1990 4.

Will refueling or resumption of operation thereafter require a technical specification change or other license amendment? No i

If yes, what will these be?

If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions? N/A 5.

Scheduled date(s) for submitting proposed licensing action and supporting information:

N/A Important licensing considerations (new or different design or supplier, 6.. :unreviewed design or performance analysis methods, significant changes in design or new operating procedures).

1 7.

Number of fuel assemblies (a) in the core: 193 (b) in the spent fuel pool:

590 8.

Present licensed fuel pool capacity:

1463 Size of requested or planned increase:

9.

Projected date of last refueling which can be accommodated by present licensed capacity:

December 2003 DUKE POWER COMPANY DATE:

June 15, 1990 l

Name of

Contact:

J. A. Reavis Phone:

704-373-7567