Monthly Operating Rept for May 1990 for Limerick Generating Station Units 1 & 2
ML20043F789
Person / Time
Site: Limerick  Constellation icon.png
Issue date: 05/31/1990
From: Meck K
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To:
Shared Package
ML20043F790 List:
References
NUDOCS 9006180150
Download: ML20043F789 (10)


Text

.

. 1 3901035470 Docket No. 50-352 i Attachment to Monthly Operating Report for <

May 1990 Limerick Generating Station Unit 1 l May 1 through May 31,1990 l

1. Narrative Summary of Onoratina Erneriences Limerick Unit 1 began the month of May at a nominal 100% of rated thermal power. On May 5,  !

reactor power was reduced to 36% to allow individual removal of the reactor recirculation pump i motor generator (M.G) set from service for generator brush replacement. On May 6 following M- '

G set return to service and recalibration of nuclear instrumentation for two recirculation loop l operation, reactor power was restored to 100%. On May 9, reactor power was reduced to 82% to perform a control rod pattern adjustment. Limerick Unit 1 ended the month of May at a nominal  !

100% of rated thermal power.  ;

Operational events that occurred during the month of May included:

On May 23, the Unit 1 HPCI was blocked for 1 & C work on a flow transmitter. Following completion of the work, the pump was placed in service per ST-6 055 230-1. The test wh completed satisfactorily; however, a leak on the booster pump seal cooling water line was observed. Following testing, HPCI was returned to an operable status. On May 25. HP.QI was blocked and the booster pump seal cooling water leak was repaired. Following repair HPCI was placed in service, operated satisfactorily, and subsequently returned to an operable status, ll, mat i FNGES TO MAIN STEAM SAFETY RELIEF VALVES r There were no challenges to the Main Steam Relief Valves during the month of May.

T F

R k _

CNERAGE DAILY oNIT POWE3 LEVEL o s

DOCKET NO. 50 - 352 uM11 a .ERIC. o 17 1 3901035470 DATE JUNE 1.1990 COMPANY PHILADELPHIA ELECTRIC COMPANY MARL McCR REPORTS SUPERv!SOR SUSINESS UNIT L!mERICK GENERATING STATION TELEPHONE (215) 327-1200 EXTENSION 3320 MONTH MAY 1990 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY P0wER LEVEL (WWE-MET) (MWE-NET) 1 1020 17 1020 2 1025 18 1031 3 1029 19 1029 4 1025 20 1026 5 668 2* 1034 6 753 42 1036 7 1024 23 1028 8 1020 24 1031 9- 999 25 1030 10 1024 26 1028 11 1033 27 1032 12 1036 28 '1025 13 1027 29 1029 14 1028 30 1029 15 1028 31 1032 16 1023 I f

OPERATING DAT3 LEPORT .

~

DOCCET esO. 50 - 352 OAT E .,UNE 1. '"

COMPLETED BV PHILADELPHIA ELECTRIC COMPANY 3901035470

  • Kt*L WECM REPORTS SUPERVISOR SUSINESS UNIT LINERICE GEhERATING STATION TELEPHONE (215) 327-1200 EXTENSION 3320 OPERATING STATUS 1 UNIT NAWE LIMERICK UNIT 1 i NOTES: THERE WAS ONE LOAD l

___ - _ -_ _ g  ;

7. REPORTING PERIOD: mAv. 1990 l # EDUCTION GREATER l 1 I
3. LICENSED THERMAL POWER (MWT): 3293 i THAN 20% THIS MONTH. j

_ .. _.. __..  ; g 4 NAMEPLATE RATING (GROSS MwE): 1139 I I l )

5. DESIGN ELECTRICAL RATING (NET MWE): 1055 l 1 6 1
6. MAXIMUM DEPENDABLE CAPACITY (GROSS wwE): 1092 I I

}  ;

L 7. WAXIMUM DEPENDABLE CAPACITY (NET MwE): 1055 l _

l

8. IF CHANGES OCCUR IN CAPACITV RATINGS (ITEMS NUwSER 3 THROUGH 7) SINCE LAST REPORT. GIVE REASONS:
9. POWER LEVEL TO WHICH RESTRICTED. IF ANV (NET wwE):
10. REASONS FOR RESTRICTIONS. IF ANY:

THIS WONTH VR-TO-DATE CUwuLATIVE

11. HOURS IN REPORTING PERIOD 744 3.623 37.943
12. NUMBER OF HOURS REACTOR WAS CRITICAL 744.0 3.623.0 30.751.8
13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 0.0 14 HOURS GENERATOR ON-LINE 744.0 3.623.0 30.294.6
15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
16. GROSS THERMAL ENERGY GENEQ4TED (mwH) 2.399.366 11.667.276 89.530.716
17. GROSS ELECTRICAL ENERGY GENERATED (MwH) 777.710 3.778.580 28.965.150
18. NET ELECTRICAL ENERGY GENERATED (MwH) 748.871 3.643.717 27.700,113 PAGE 1 OF 2

_ _ _ _ _ _ = _ _ _ . _ - _ - .- -- -- . . .. - - .

, ., r -

OPERATING DAT3 REPORT (CONTINUED) DOCEET NO. 50 - 352 -

~

39,0,10a.p470 DATE JUNE 1.1990 a

  • THIS MONTH VR-TO-OATE CUWULATIVE
19. UNIT SERVICE FACTOR 100.0 100.0 79.8
20. UNIT AVAILABILITY FACTOR 100.0 100.0 79.8 21 UNIT CAPACITY FACTOR (USING WDC NET) 95.4 95.3 69.2
22. UNIT CAPACITV FACTOR (USING DER NET) 95.4 95.3 69.2
23. UNIT FORCED OUTAGE RATE O.C O.0 2.6 24 SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE. DATE. AND DURATION OF EACH):

REFUELING OUTAGE: SEPTEM8ER 07.1990: 75 DAYS

25. IF SHUTDOWN AT END OF REPORT PERIOD. EST!wATED DATE OF STARTUP:
26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION): FORECAST ACHIEVED INITIAL CRITICALITV 12/19/84 12/22/84 INITIAL ELECTRICITV MID APRIL 85 4/13/85 COMWERCIAL OPERATION 157 OTR 96 2/07/86 PAGE 2 OF 2

' f

"~

' ~

UNIT' SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50 - 352 -

=---.-------------

UNIT NAME LIuSIICO UNIT 1 -

DATE JUNE 1.1990 REPORT WONTH MAY. 1990 COMPLETED SV PHILADELPHIA ELECTRIC CODPANY ,

=- --

KARL WECM REPORTS SUPERVISOR BUSINESS UNIT LINERICR GENERATING STATION TELEPHONE (215) 3Z7-1200 EXTENSION 3320


~~------- ---- -

l l l 1 l METHOD OF l LICENSEE ISYSTEulCOMPONENTI CAUSE AND CORRECT!vE F ITYPElDURATIONIREASONISHUTTING DOwNI EVENT -l CODE I CODE l ACTION TO NO.I DATE I (1)I (HOURS)l (2) l REACTOR (3) l REPORT

  • l (4) l (5) l PREVENT RECURRENCE I I I i 1 I I i 15 l 900505 S l 000.0 l 8 l 4 I N/A I ZZ l ZZZZZZ l LOAD WAS REDUCED 64% TO PERFORM RECIRC I l l l l l l l MG SET MAINTENANCE AND SCRAW TIME TEST I i i I I I i i 16 I 900509 l 5 l 000.0 l F I 4 l N/A I ZZ l ZZZZZZ l LOAD WAS REDUCED 18% TO PERFORM A I I I l l l I l l CONTROL ROO PATTERN ADJUSTWENT.

I l l l l 1 1 I I I i i l i I I i i i I I I I I I I I l 1 ----- 1 I I I I I l 1 - 1 I I I I (1) (2) (3) (4)

F - FORCED REASON WETHOD ExHIEIT G - INSTRUCTIONS S - SCHEDULED A - EQUIPMENT FAILURE (EXPLAIN) 1 - MANUAL FOR PREPARATION 08 DATA 5 - MAINTENANCE OR TEST 2 - MANUAL SCRAM. ENTRY SHEETS FOR LICENSEE C - REFUELING 3 - AUTOMATIC SCRAM. EVENT REPORT (LER)

D - REGULATORY RESTRICTION 4 - OTHER (EXPLAIN) FILE (NUREG-0161)

E - OPERATOR TRAINING + LICENSE EXANIMATION F - ADMINISTRATIVE (5)

G - OPERATIONAL ERROR (EXPLAIN)

H - OTHER(EXPLAIN) EXHIBIT I - SANE SOURCE

l 3901035470 Docket No. 50 353 Attachment to MontNy Operating Report for May 1990 Limerick Generating Station Unit 2 May 1 through May 31,1990

1. Narrative Summarv of Onoratina Exr,st;ences Limerick Unit 2 began the month of May at a nominal 100% of rated therrnal power. On May 6, reactor power was reduced briefly to 94% to perform a control rod pattem adjustment. On May 19, reactor power was reduced to 62% for ALARA considerations while performing maintenance on the cordenser hotwell level transmitter and the '281' moisture separator drain valve air line. Limerick Unit 2 ended the month of May at a nominal 100% of rated thermal power.

Operational events that occurred during the month of May included:

I The D21 Diesel Generator was declared inoperable on May 17 upon discovery that the seismic qualifications for the installed speed signal Generator could not be verified. The remaining Unit 2 Diesel Generators were placed in service to verity operability to sati$

Technical Specifications. On May 18, the D21 Diesel Generator was declared operable after documentation verlfled that the speed signal generator had seismic qualifications. .

II. Challennes to Main Steam Safety Relief Valves There were no challenges to the Main Steam Safety Relief Valves during the month of May.

i e

' AVERAGE DAILY UNIT POWED LEVEL - =

oOCcET NO. so - ssa 3901035470 ,

UNIT 2 UNIT LIMERICM-_ - - _ - . _

DATE JUNE 1 1990 COMPANY PHILADELPHIA ELECTRIC COMPANY MARL MECK REPORTS SUPERVISOR SUSINESS UNIT LIMERICM GENERATING STATION TELEPHONE (215) 327-1200 EXTENSION 3320 MONTH MAY 1990 Dav AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (WWE-NET) (MwE-NET) 1 1053 17 1044 2 1056 18 1051 3 1058 19 925 4 1059 20 1051 5 1054 21 1057 6 1060 22 1059 7 1054 23 1054 8 1048 24 1056 9 1052 25 1054 10 1049 26 1052 11 1055 27 1055 12 1058 28 1049 13 1051 29 1054 14 1051 30 1052 15 1051 31 1054 16 1049

' f g p+. v,3.- 1 .- ,y p -q wv- we + w wy, v'

  • wr

OPERATING DAT3 REPORT **

M 010 *3 54 70 '

DOCKET NO. 50 - 35)

___ -- .e DATE JUNE 1 1990 -

COMPLETED BV PHILADELPHIA ELECTRIC COMPANY MARL MECK REPORTS SUPERVISOR SUSINESS UNIT LIMERICK GENERATING STATION TELEPHONE (215) 327-1200 EXTENSION 3320 OPERATING STATUS

1. UNIT NA LIMERICK UNIT 2 l NOTES: THERE WAS ONE LOAD I

1

2. REPORTING PERIOD: WAY. 1990 i REDUCTION GREATER l g i
3. LICENSED THERMAL POWER (MwT): 3293 i THAN 20% THIS MONTH. I I I 4 NAMEPLATE RATING (GROSS MwE): 1138 l l l l S. DESIGN ELECTRICAL RATING (NET MwE): 1055 I I g g
6. MAXIMUM DEPENDABLE CAPACITY (GROSS MwE): 1092 I I l l
7. MAXIMUM DEPENDABLE CAPACITY (NET MwE): 1055 l 1
8. IF CHANGES OCCUR IN CAPACITV Rt. TINGS (ITEMS NUMBER 3 THROUGH 7) SINCE LAST REPORT. GZYE REASONS:
9. POWER LEVEL TO wHICH RESTRICTED. IF ANY (NET MwE):
10. REASONS FOR RESTRICTIONS. IF ANV:
8. IF CHANGES OCCUR IN CAPACITV RATINGS (ITEMS NUMBER 3 THROUGH 7) SINCE LAST REPORT. GIVE REASONS:

THIS MONTH VR-TD-DATE CUMULATIVE 11 HOURS IN REPORTING PERIOD 744 3.455 3.455

12. NUMBER OF HOURS REACTOR WAS CRITICAL 744.0 3.303.9 3.303.9
13. REACTOR RESERVE SHUTDOwM HOURS 0.0 0.0 0.0 14 HOURS GENERATOR ON-LINE 744.0 3.224 9 3.224.9
15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
16. GROSS THERMAL ENERGY GENERATED (MwH) 2.438.201 10.445.237 10.445.237 +
17. GROSS ELECTRICAL ENERGY GENERATED (MwH) 808.210 3 3.483.346

----- J -- .483.346- - ---- ------------

18. NET ELECTRICAL ENERGV GENERATED (MwH) 780.522 3 359.158 3.359.158 PAGE 1 OF 2

. - - - ~

~'

OPERATING DATO REPORT (CONTINUE 2) DOCKET NO. " - 353- -.

3901035470. .

~

. 2 DATE JUNE 1 1990 .

THIS MONTH VR-TO-DATE CUMULATIVE

19. UNIT SERVICE FACTOR 100.0 93.3 93.3
20. UNIT AVAILABILITY FACTOR 100.0 93.3 93.3
21. UNIT CAPACITY FACTOR (USING MDC NET) 99.4 92.2 92.2
22. UNIT CAPACITY FACTOR (USING DER NET) 99.4 92.2 92.2
23. UNIT FORCED OUTAGE RATE O.0 6.7 6.7 24 SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE. DATE. AND DURATION OF EACH):
25. IF SHUTDOWN AT END OF REPORT PERIOD. ESTIMATED DATE OF STARTUP:
26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION): FORECAST ACHIEVED INITIAL CRITICALITY 08/12/89 08/12/89 INITIAL ELECTRICITV 09/01/89 09/01/89 COMMERCIAL OPERATION 02/01/90 01/08/90 PAGE 2 OF 2

' f

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCMET NO. 50 - 353 3 01035470 UNIT NANE LINERIC3 UNIT l .

DATE JUNE 1 1990 REPORT WONTH MAY,.1990 COMPLETED BY PHILADCLPHIA ELECTRIC COMPANY MARL #ECn REPORTS SUPERVISOR BUSINESS UNIT LImERICE GENERATING STATION TELEPHONE (215) 327-1200 EXTENSION 3320 l l l I l METHOD OF l LICENSEE ISYSTEWICOwPONENTI CAUSEACTION AND CORRECTIVE TO l lTYPElDURATIONl REASON l SHUTTING DOWNl EVENT l CODE l CODE I NO.! DATE i (1)l (HOURS)l. (2) l REACTOR (3) l REPORT a 1 (4) l (5) i PREVENT RECURRENCE - ................-

1 i i I i i i i 9 i 900506 l 5 l 000.0 l F l 4 l N/A ZZ l ZZZZZZ l LOAD WAS REDUCED 06% TO PERFORM A l l l l I l CONTROL ROD PATTERN ADJUSTWENT.

l l I I I I I l f f 10 l 900519 '.5 000.0 i B l 4 N/A l ZZ l ZZZZZZ ! LOAD WAS REDUCED 38% TO PERFORM l l l l l WAINTENANCE ON THE CONDENSER HOTwELL l l l LEVEL TRANSMITTER AND THE *281*

l l l l l .

l l MOISTURE SEPARATOR DRAIN VALVE AIR LINE.

L l l l l I l l I 1 - --- 1 I I - 1 l 1 I (3) (4)

(1) (2)

METHOD EXHIBIT G - INSTRUCTIONS F - FORCED REASON 1 - MANUAL FOR PREPARATION OF DATA S - SCHEDULED A - EQUIPMENT FAILURE (EXPLAIN) ENTRV SHEETS FOR LICENSEE B - MAINTENANCE OR TEST 2 - MANUAL SCRAM.

3 - AUTOMATIC SCRAM. EVENT REPORT (LER)

C - REFUELING FILE (NUREG-0161)

D - REGULATORY RESTRICTION- 4 - OTHER (EXPLAIM)

E - OPERATOR TRAINING + LICENSE EXANINATION (5)

F - ADMINISTRATIVE G - OPERATIONAL ERROR (EXPLAIN) EDH13!T I - SAWE SOURCE H - OTHER(EXPLAIN)