V

  • t Wsconson Electnc POWER COMPANY 231 W techgas Po Box 2046. Mhasee W L3201 (414)221.2345 VPNPD-90-275 NRC-90-055 i June 11, 1990 U. S. NUCLEAR REGULATORY COMMISSION .

Document Control Desk  :'

Mail Station P1-137 Washington, D. C. 20555 Gentlemen: ,

POCKETS 50-266 AND 50-301 MONTHLY OPERATING REPORTS POINT BEACH NUCLEAR PLANT. UNITS 1 AND 2 Attached are monthly operating reports for Units 1 and 2, Point Beach Nuclear Plant, for the calendar month of May 1990.

Very truly yours, 8Y 0 C. W. Fy Vice President l

Nuclear Power

! Attachments ,

I Copies to R. S. Cullen, PSCW NRC Regional Administrator, Region III NRC Resident Inspector 9006140499 900531 '

l PDR ADOCK 05000266 // i R FDC ( [1 AsuMhm eiIlianshilhm 04wa&>o

_o

.. ~. -

OPERATING DATA REPORT .

DOCKET NO. 50-266 DATE. June 8, ;990 COMPLETED BY J. W. Jack TELEPHONE 4I4/755-2321 OPERATING STATUS

-1. UNIT NAME: POINT BEACH NUCLEAR PLANT UNIT 1 . NOTES .

2. REPORTING PERIOD: MAY 1990 . .
3. LICENSED THERMAL POWER (MWT): 1518.5 . .
4. NAMEPLATE RATING (GROSS MWE): 523.8 . .
5. DESIGN ELECTRICAL RATINC (NET MWE): 497. . .
6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): 509. . .
7. MAXIMUM DEPENDABLE CAPACITY ' MET MWE): 485. . . . . . . . . . . . . . . . . . . . . . . . .
8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS:

NOT APPLICABLE

9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE): NOT APPLICABLE
10. REASONS FOR RESTRICTIONS, (IF ANY): NOT APPLICABLE THIS MONTH YR TO DATE CUMULATIVE
11. HOURS IN REPORTING PERIOD 744 3,623 171,527
12. NUMBER OF HOURS REACTOR WAS CRITICAL. 346.1 2,484.8 140,828.5
13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 652.7
14. HOURS GENERATOR ON LINE 308.6 2,446.3 137,985.5
15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 837.9
16. GROSS THERMAL ENERGY GENERATED (MWH) 428,502 3,525,555 191,993,947
17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 144,850 1,191,590 64,796,280
18. NET ELECTRICAL ENERGY GENERATED (MWH) 135,526 1,135,785 61,726,476_
19. UNIT SERVICE FACTOR 41.5 67.5 80.4
20. UNIT AVAILABILITY FACTOR 41.5 67.5 80.9
21. UNIT CAPACITY FACTOR (USING MDC NET) 37.6 64.6 73.8
22. UNIT CAPACITY FACTOR (USING DER NET) 36.7 63.1 72.4
23. UNIT FORCED OUTAGE RATE 0.0 0.0 1.8
24. SHUTDOWNS SCHEDULED OVER NEIT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):

t NONE

25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: NOT SHUTDOWN DATA REPORTED AND FACTORS CALCULATED AS REQUESTED IN NRC LETTER DATED SEPTEMBER 22, 1977

. _ _ _ . _ _ . _ _ . . _ ______m - . .

~

DOCKET NO. 50-2(6 UNIT NAME Point Beach. Unit 1 DATE June 8.1990 COMPLETED BY J. W. Jack TELEPHONE 414R55-2321

., AVERAGE DAILY UNIT POWER LEVEL MONTH May AVERAGE AVERAGE AVERAGE DAILY DAILY DAILY POWER LEVEL POWER LEVEL POWER LEVEL DAY MWe NET DAY MWe NET DAY MWe NET 1 -2 11 -2 21 456 2 -2 12 -12 22 497 3 -2 13 -8 23 497 4 -2 14 -3 24 497 5 -2 15 -13 25 4%

6 -2 16 -14 26 498 7 -1 17 -14 27 496 8 -2 18 -16 28 4%

9 -2 19 73 29 495 10 -9 20 264 30 495 31 4%

PDF4wC8a (03-90)

y, UNIT SHUTDOWNS AND POWER' REDUCTIONS DOCKET NO. 50-266 UNIT NAME Point h4 Unit 1 .

DATE June 8.1990 REPORT MONTH May 1990 COMPLETED BY J. W. Jack TELEPHONE NO. 414/755-2321 .

Method of 2

No. Date Type Duration Reason Shutting Ixensee Event System Component Cause and Corrective Aaion (Hours) Down Report No. Code' Code 5 To Prevent Recurrence Reactor' 1 900331 S 435.4 C 1 N/A ZZ />>>>>>- Annual refueling and maintenance outage i

' F: Forced 2 Reason. 8 Method.:

  • Exhibit G - Instructions S: Scheduled A - Equipment Failure (explain) 1 - Manual for preparation of data i B - Maintenance or Testing 2 - Manual Scram entry sheets LER file C - Refueling 3 - Automatic Scram (NUREG-0161)

D - Regulatory Restriction 4 - Continuation of E - Operator Training & Previous Shutdown 5

Lacensing Exam 5 - Reduced load Exhibit I - Same Source F - Administrative 6 - Other (explain)

- Operational Error (explain)

H - Other (explain)

PDF-0028b (03-99)

...- o' NARRATIVE

SUMMARY

OF OPERATING EXPERIENCE  :

DOCKET No. 50-266 UNIT NAME POINT BEACH UNIT 1 DATE JUNE 8, 1990 COMPLETED BY J. W. JACK TELEPHONE 414/755-2321 Unit 1 began this report period undergoing the final stages of refueling outage U1R17. Reactor coolant system restoration was complete on May 9, 1990; however, a pin hole leak was discovered on control rod drive mechanism D-4. The leak was repnired, and Unit 1 achieved criticality on May 17, 1990. The unit was then brought on line on May 19, 1990, and subsequently taken off line briefly to facilitate turbine overspeed testing.

On May 10, 1990, an I&C technician inadvertently doenergized a test signal generator to the steam generator level instrument. '

The reacter protection system then generated a reactor trip signal upon receipt of a 2 out of 3 trip logic for low-low steam generator level (Licensee Event Report 90-005).

Safety-related maintenance completed during the month included:

Increased the flow capacity of backup nitrogen to PORVs, rebuilt and tested various snubbers (HS-7, 15, 16, 601R-37A), replaced RHR pump motor and coupling (P-10A), refurbished various main steam valves, and cleaned boric acid from and adjusted packing on various reactor coolant system valves.

l l

l l

9 OPERATING DATA REPORT .

DOCKET NO. 50-301 DATE June 8, 1990 COMPLETED BY J. W. Jack TELEPHONE 414/755-2321 OPERATING STATUS

1. UNIT NAME: POINT BEACH NUCLEAR PLANT UNIT 2 . NOTES .
2. REPORTING PERIOD: MAY 1990 . .
3. LICENSED THERMAL POWER (MWT): 1518.5 . .
4. NAMEPLATE RATING (GROSS MWE): 523.8 . .
5. DESIGN ELECTRICAL RATING (NET MWE): 497. . .
6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): 509. . .
7. MAXIMUM DEPENDABLE CAPACITY (NET MWE): 485. . . . . . . . . . . . . . .. . . . . . . . . .
8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS:

NOT APPLICABLE

9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE): NOT APPLICABLE
10. REASONS FOR RESTRICTIONS, (IF ANY): NOT APPLICABLE THIS MONTH YR TO DATE CUMULATIVE
11. HOURS IN REPORTING PERIOD 744 3,623 156,312
12. NUMBER OF HOURS REACTOR WAS CRITICAL 744.0 3,623.0 136,968.8
13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 216.7
14. HOURS GENERATOR ON LINE 744.0 3,623.0 134,828.3
15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 302.2
16. GROSS THERMAL ENERGY GENERATED (MWH) 1,127,775 5,482,057 192,065,593
17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 388,490 1,888,320 65,213,540
18. NET ELECTRICAL ENERGY GENERATED (MWH) 371,406 1,807,424 62,146,034
19. UNIT SERVICE FACTOR 100.0 100.0 86.3
20. UNIT AVAILABILITY FACTOR 100.0 100.0 86.4
21. UNIT CAPACITY FACTOR (USING MDC NET) 102.9 102.9 81.3
22. UNIT CAPACITY FACTOR (USING DER NET) 100.4 100.4 80.0
23. UNIT FORCED OUTAGE RATE 0.0 0.0 1.2
24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):

Forty-two day refueling and maintenance outage scheduled to start October 5, 1990.

25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: NOT SHUTDOWN DATA REPORTED AND FACTORS CALCULATED AS REQUESTED IN NRC LETTER DATED SEPTEMBER 22, 1977

~ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ - - - _ _ _ _ __ _ ~

e DOCKET NO. 50-301 UNIT NAME Point Beach. Unit 2 DATE June 8.1990 COMPLETED BY J. W. Jack TELEPHONE 414/755-2321 AVERAGE DAILY UNIT POWER LEVEL MONTH May AVERAGE AVERAGE AVERAGE DAILY DAILY DAILY POWER LEVEL POWER LEVEL POWER LEVEL DAY MWe NET DAY MWe NET DAY MWe NET 1 501 11 499 21 492 2 501 12 505 22 500 3 502 13 497 23 501 4 501 14 502 24 501 5 499 15 498 25 500 6 501 16 504 26 500 7 503 17 495 27 500 8 501 18 500 28 500 9 501 19 499 29 541 10 502 20 479 30 457 31 500 PDF-0028a (03-90)

.4 UNIT SHlTfDOWNS AND POWER REDUCTIONS DOCKET NO. 50-301 UNIT NAME Point Beach. Unit 2

~

DATE June 3.1990 -

REPORT MONT11 May 1990 COMPLETED BY J. W. Jack TELEPHONE NO. 414/755-2321 Method of No. Date Type' Duration Reas(m2 Shutting 1xensee Ewnt System Component Cause and Corrective Action (Hours) Down Report No. Code' Codc5 To Prevent Recurrence Reactor'

' F: Forced 2 Reason: 8 Method-

  • Exhibit G - Instructions S: Scheduled A - Equipment Failure (explain) 1 - Manual for preparation of data B - Maintenance or Testing 2 - Manual Scram entry sheets LER file C - Refueling 3 - Automatic Scram (NUREG-0161)

D - Regulatory Restriction 4 - Continuation of E - Operator Training & Previous Shutdown Ucensing Exam 5 - Reduced Lead 5 Exhibit 1 - Same Source F - Administrative 6 - Other (explain)

G - Operational Error (explain)

H - Other (explain)

PBFm28b (OW)

s*.< ,

NARRATIVE

SUMMARY

OF OPERATING EEPERIENCE DOCKET 50-301 UNIT NAME POINT BEACH UNIT 2 DATE JUNE 8, 1990 COMPLETED BY J. W. JACK TELEPHONE 414/755-2321 Unit 2 operated at approximately 500 MWe net throughout this reporting period with no significant load reductions of greater than 20%.

On May 14, 1990, Unit 2 surpassed 65 billion kwh of production.

Safety-related maintenance completed during this month included: ,

Inspected the coupling on RHR pump P-10A, and fast start /no load test of G-02. Common maintenance included: Adjusting the low input voltage cutout on various inverters, and repair to burned components on inverter DY-0A.

p P

5 4

e