Text
-
I
.<
,e
..
'.'
JUN -i 1990
'
.
.
In Reply Refer To:
Dockets: 50-313/90-14
50-368/90-14
Arkansas Power & Light Company
,
ATTN: Neil S. Carns, Vice President
,
Nuclear Operations'
P.O. Box 551
Little Rock, Arkansas 72203
Gentlemen:
This refers to the inspection conducted by Mr. D. L. Kelley of this office
,
during the period May 21-25, 1990, of activities authorized by NRC Operating
' Licenses DPR-51 and NPF-6 for Arkansas Nuclear One Units 1 and 2, and to the
i
discussion of our findings with Mr. J. W. Yelverton and other members of your
staff at the conclusion of the inspection.
' Areas examined during the. inspection included the programs for surveillance
testing and calibration control and followup on previous inspection findings.
e
L
This report does not include specific inspection followup for any Diagnostic
.
EvaluationTeamfindings(referenceDiagnosticEvaluationTeamReportissued
J
December 21,1989). Within these areas, the ir,spection consisted of selective
examination of procedures and representative records, interviews with.
personnel, and observations by the inspector. The inspection findings are
documented in-the enclosed inspection report,
,
Within the scope of the inspection, no violations or deviations were
,
identified.
Should you have any questions concerning this inspection, we will be pleased to
discuss them with you.
l
Sincerely,
Odginal Signed By:
'
i
Samuel J. CoRos
,
3
Samuel J. Collins, Director
-
Division of Reactor Projects
Enclosure:
Appendix - NRC Inspection Report
50-313/M-14
,
50-368/96-14
'
'
RIV:TPS M
C:TPS 8 8
0
'pDLKelley/lbpWCSeidle
(A.tdCallan
C lins
f/Ji /90
f/>//90
g / /90
41 /90 -
g,
900613o427 900601
\\{\\
POR
ADOCK 05000313
.
\\
O
,e
. _ _ . _ ,
.-
. . - .
. . _ . .
_
.
,
s
[
i.
.
.
',.'
,
.
Arkansas Power & Light Company
-2-
'
i
cc w/ enclosure:
Arkansas Nucitar One
,
t
ATTN: Early Ewing, General Manager
Technical Support and Assessment
P.O.. Box 608
Russellville, Arkansas 72801
Arkansas Nuclear One
ATTN: Jerry Yelverton, Director
Nuclear Operations
P.O. Box 608
Russellville, Arkansas 72801
,
Combustion Engineering, Inc.
ATTN: Charles B. Brinkman, Manager
Washington Nuclear Operations
12300 Twinbrook Parkway Suite 330
Rockville, Maryland 20852
Honorable Joe W. Phillips
County Judge of Pope County
Pope County Courthouse
Russellville, Arkansts -72801
Bishop, Cook, Purcell & Reynolds
ATTN: Nicholas S. Rep olds, Esq.
1400 L Street, N.W.
Washington, D.C.
20005-1502
Arkansas Departownt of Health
ATTN: Ms. Greta Dieus, Director
Division of Environmental Health
. Protection
4815 West Markam Street
,
Little Rock, Arkansas 72201
'
Babcock & Wilcox
!
Nuclear Power Generation Division
' ATTN: Mr. Robert B. Borsum
1700 Rockville Pike, Suite 525
Rockville, Maryland 20852
,
.
-
I
p
!
i
~
.
.
i
.
i
-
I
Arkansas Power & Light Company
-3-
f-
U.S. Nuclear Regulatory Commission
ATTN: Senior Resident Inspector
,
1 Nuclear Plant Road
i
Russellville, Arkansas 72801
U.S. Nuclear Regulatory Commission
ATTN: Regional Administrator, Region IV
j
611 Ryan Plaza Drive, Suite 1000
Arlington, Texas 76011
.
,
bectoDMB(IE01)
bec distrib. by.RIV:
- R. D. Martin
- Resident Inspector
- DRSS-FRPS
- SectionChief(DRP/A)
.
Lisa Shea, RM/ALF
- RIV File
- DRP
- MIS System
- RSTS Operator
- ProjectEngineer(DRP/A)
- DRS
- T. Alexion,NRRProjectManager(MS:
13-E-21)
,
- C. Poslusny, NRR Project Manager (MS:
13-D-18)
- D. L. Kelley
- W. C. Seidle
- w/766
,