Text
._
_
.
_
___
_ . _ . .
.
- o' yy
- -
,.
-e
g
JUN 0 61990
Docket No. 50-333
Power Authority of the State of New York-
James A. FitzPatrick Nuclear Power Plant
ATTN:
W. Fernandez
i
Resident Manager
P. O. Box 41
Lycoming, New York 13093
,
Gentlemen:
Subject:
NRC Inspection Report No. 50-333/90-17
A routine unannounced radiological controls inspection was conducted at the-
James A. FitzPatrick Nuclear Power Plant on May 5 to 11,1990. Areas reviewed
during the inspection included: Staffing and Organization, and' Internal and
External Exposure Controls. The inspector also provided input to the NRC
l
Maintenance Team which was conducting Maintenance Team Inspection No.
50-333/90-80. The findings were summarized and discussed with you and members-of
your staff during the exit meeting on May 11, 1990.
,
Within the scope of this review,d a failure to follow radiation protectionthree apparent violat
first apparent violation involve
procedures. The second apparent violation involved a failure of the Plant
.
Operating Review Committee to review radiation protection procedures as required
by Technical Specifications. The third apparent violation involved a' failure to
provide individuals entering high radiation areas with adequate dose rate
,
measurement instrumentation. The violations are described in the enclosed
'
Appendix A, Notice of Violation. You are required to respond to this Notice of
Violation and follow the instructions specified in Appendix A.
,
Your cooperation with us is appreciated.
Sincerely,
Original Signed By:
Rondd R. Bellamy
Ronald R. Bellamy, Chief
Facilities Radiological Safety
and Safeguards Branch
Division of Radiation Safety
i
and Safeguards
i
Enclosures:
[ 0~
d@l f)
!P
"'
1.
A)pendix A, Notice of Violation
ti
2.
NRC Inspection Report No. 50-333/90-17
U %
\\ \\
h
(22900606
CI 9"'",_T(% Y
m% %1,
K 05000333
%>
a
w
.m
- -
-
.
-
-
-
-
.
. -
-
-
J
w-
w
- - - - - - -
.-
. . . .
.
.
..
_.
_.
. . .
.
. . .
..
JUN 0 01990
Power Authority of the State
2
of New York
cc w/ encl:
J. Bayne, President
J. Brons, Executive Vice President - Nuclear Generation
R. Beedle, Vice President Nuclear Support
S. Zulla, Vice President Nuclear Engineering
P.. Burns, Vice President Nuclear Operations
J. Gray Director Nuclear Licensing - BWR
'A. Klaus,mann,lity Assurance Superintendent
Senior Vice President - Appraisal and Compliance Services
-
R. Patch, Qua
G. Wilverding, Assistant General CounselManager Nuclear Safety Evaluation
G. Goldstein
Dept. of Public Service, State of New York
State of New York, Dep(PDR) (LPDR)
artment of Law
o
Public Document Room
!
!
Local Public Document Room
Nuclear Safety Information Center (NSIC)
NRC Resident Inspector
State of New York, SLO Designee
,
!
i
,
p
.
._
.
_ _ - .,
_
_
_.
.
_
_
.
'
.
..
..
Power Authority of the State
3
0 0 1990
of New York
.
bec w/ encl:
Region I Docket Room (with concurrences)
Management Assistant, DRMA (w/o encl)
R. Bellamy, DRSS
i
J. Linville, DRP'
D. Limroth DRP
G.Myer,DkP
,
.M. Conner, SALP Reports Only
J. Caldwell,PA0 (20) SALP Reports and (2) All Inspection Reports
K. Abraham
D. LaBarge, NRR
,
i
'
RI:DRSS
F
RI:
O'Connelll
l'a cia
Bellamy
NVLf
l
6/,/90
6/i/90
6/6/90
'
l
.
i
,*
fY
< Nk
,I' ('
8
j
-