Forwards SALP Mgt Meeting Repts 50-206/90-23,50-361/90-23 & 50-362/90-23 on 900425.Continuous Strong Performance Noted in Radiological Controls,Security & Emergency Preparedness Functional Areas.Meeting Agenda Also Encl
ML20043D759
Person / Time
Site: San Onofre  
Issue date: 05/25/1990
From: Martin J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Ray H
SOUTHERN CALIFORNIA EDISON CO.
Shared Package
ML20043D760 List:
References
NUDOCS 9006110146
Download: ML20043D759 (5)


See also: IR 05000206/1990023

Text

a__

'*

"[. a ten,I'o

UNITED STATES

g

,

I

NUCLEAR REGULATORY COMMISSION

$

MOONV

4

WAL UT cm Ex cALi o

A we

WAY t 5 #90

Docket Nos. 50-206, 50-361, 50 362

Southern California Edison Company

Irvine Operations Center

23 Parker Street-

Irvine, California 92718

i

Attention:

Mr. Harold B. Ray, Vice President

Nuclear Engineering, Safety, and Licensing

Gentlemen:

Subject: SystematicAssessmentofLicenseePerformance(SALP)

October 1, 1988 through January 31, 1990

This refers to the NRC's Systematic Assessment of Licensee Performance (SALP)

Board Report Nos. 50-206/90-02, 50-361/90-02, and 50-362/90-02, which was

transmitted to you by our letter dated April 11, 1990.

During our management

meeting at the San Onofre Site on April 25, 1990, we discussed the results of

-

that assessment.

A copy of the agenda for our meeting is enclosed.

A summary

of our discussions at that meeting, which also included SCE presentations on

twoothersubjects,isprovidedintheenclosedmeetingreport.

'

As discussed in our April 11 letter $ meeting, the SALP Board found yourin the Initial SA

that letter, and during our April 2

overall performance to be very good and directed toward safe facility

operation.

Specific strong performance was noted to have continued in the

l

Radiological Controls, Security, and Emergency Preparedness functional areas,

L

and improvement in the Maintenance / Surveillance area caused that area to also

be considered an area of strength.

During our meeting you; identified' actions

'

being taken to address the relative decline in performance which was observed

in tie Plant Operations area during this SALP period.

Your performance in the

Engineering / Technical Support and Safety Assessment / Quality Verification .

functional areas was observed to have made notable improvements, although we

e

-

emphasize the importance of your completing several improvement programs you

have initiated in these areas.

Our April 11. letter noted that you are not required to reply to the SALP

Board's re) ort but could do so, if desired, within 30 days after our April 25

meeting.

3ased on your comments during that meeting, as described in the

enclosed meeting report, we understand that the SCE has no specific comments

l

on the SALP Board s report and does not alan to provide a written response.

No changes have therefore been made to tie Initial'SALP Board Report

Nos. 50-206/90-02, 50-361/90-02, and 50-362/90-02,Lissued by our letter dated

April 11, 1990, and it is considered to be the final SALP Report.

Inaccordancewith10CFR2.790(a),acopyofthisletterandtheenclosures

will be placed in the NRC Public Document Room.

'

.

l

~

a

PDC

\\~

q

..

'.

..

.

,

-2-

MAY 25 IOM

Should you have any questions concerning this letter,

the issues discussed in

the enclosed meeting report, or the SALP Board's report, we will be pleased to

discuss them with you.

Sincerely,

ff ? -

Regional Administr

Enclosures:

1.

Copy of meeting agenda

2.

Management Meeting Report Nos. 50-206/90-23,

.

50-361/90-23, and 50-362/90-23

3.

SCE presentation slides

cc w/ enclosures:

D. J. Fogarty, Executive Vice President

H. B. Bridenbecker Vice President and Si . " Manager _(San Clemente)

H. E. Morgan Station Manager (San Clemente)

,

StateofCalIfornia

l

l

3

9

l

'

.

g

1

l

-

l

.

-~

_,

.---.

'

.

,

e

.

(

1

,.

,

,

-3-

MM 2 51990

bec w/ copy of enclosures:

7

Docket File

.

SALP File

' Project Inspector

'

Resident Inspector

G. Cook

.B.'Faulkenberry

J. Martin

'

A. Johnson

P. Johnson-

C. Trammell, NRR

'

J. Tatum. NRR

L. Kokajko, NRR

- I

bec w/0, enclosures:

Chaittnan Carr

Comissioner Roberts

SALP Board Members

Commissioner Rogers

M. Slosson..ED0

Commissioner Curtiss

J. Grant, NRR

Comissioner Remick

P. Prescott, NRR

J. Tay1or, EDO

LFMB

J. Sniezek, EDO

DCS

T.' Murley, NRR

PDR

J. Lieberman OE

LPDR

M. Smith

N. Western

J. Zollicoffer

REGION V

t

RfE

\\'#" M \\

i

So .a rJ.J

'

--

-

PJdhnson

SRichards

RScarano

RU merman

BFaulkenberry

5/, /90

5/ /90

.5/ /90

5/PF/90~

5/ /90-

'

'

i

REQUEST COPY ,

REQUEST COPY ,

REQUEST COPY J

' lES1 COPY ;l REQUEST COPY.J

YES / N0

'J YES>/ N0

IYES / N0

] YE

/ NO

YES /' NO-

]

,

i-

,

,

'

L

JMart'in

-

  • '

'

5/ /90

t

-

'

REQUES1 COPY -;

  1. YES /, NO " .

~

'

,

._

L

JSENDsTO PDR

,

I.

' YES - / NO

.1,

-,

?

-

.

.

'

-

.

i

i

s

-

,

l

s

.t

-

,

.-

.,

,.

.

,

,

-3-

bec w/ copy of enclosures:

Docket File

SALP File'

'

'

'

Project Inspector

Resident Inspector

.G.

Cook

B. Faulkenber ry

J.. Martin-

A. Johnson

P. Johnson

C. Trannell, NRR

-J. Tatum, NRR

L. Kokajko, NRR

). Grkn.f,P W

bec w/o enclosures:

Chairman Carr

I'. fr eseatt r'l A

,

r

Commissioner Roberts

SALP f

ard Members

1

Commissioiier Curtiss

A. h'dy , MR

'

j

8"' -

Comiissioner Rogers

-J.

Ru

E^0

n.4ouo5

se,-

l

'

'

Commissioner Remick

LFMB

J. Taylor, EDU

DCS

J. Sniezek,;EDO

PDR

.

T. Murley, NRR <

LPDR

'

>

0, Lieberman, OE

m

,

4

M.. Smith-

N. Western:

,

,

.

.

'

.

J. Zollicoffer'

i,

.

,

s

'

'

.

.

l,' -

+

,7

REGIdNV'

.)

T

'

.

,,

,

.

..

PJ

[w

SP hardst

RS

o

RZimmennan

BFauIkonberry

.

5/M/90

5/ /90'

5/jd90

SMo/9(

5/7/90

'-

1

-

s

em

(' EQ1 JEST COPY ]/REQD{ST: COPY; 8EQ0ESTCOPY]REQUESTCOPY; REQUESTp0fy;

,

-4'

YES)~/' N0

J .YES/ / N01

! 8ES/ / NO

] YES / NO

-YES / /N0/ .,

f

f

'

y

.

V

v

l')

'-

p

.n

,

JMar' tin

'

d

<

5/ /90

EILQUEST COPY ]

YES / NO-

]

,

}

-:

~YES);TO POR

,J '

,

-SEND

j

/ ' NO -

J

,

$

&

.

5

+ .

m

..

__

_ ---__ _

. , '

r

.

.

,

,

Enclosure 1

SALP MANAGEMENT MEETING

SOUTHERN CALIFORNIA EDISON COMPANY

San 0nofre Nuclear Generating Station

,

April 25, 1990

AGENDA

.

.

1.

Opening Remarks, Purpose of Meeting -- B. H. Faulkenberry, Deputy

Regional Administrator, and H. B. Ray, Vice President

2.

Discussion of NRC Systematic Assessment of Licensee Performance (SALP),

October 1988 - January 1990

' Overview -- B. H. Faulkenber'ry, Deputy Regional Administrator

a.

b.

Review of SALP Assessment -- S. A. Richards, Chief, Reactor Projects

Branch

Plant Operations

-

Mainter.nce/ Surveillance

-

Engineering / Technical Support

-

Safety Assessment /Qvaity . Verification

-

Review of SALP Assessment -- 6. P. Yuhas, Chief. Emergency Prepared-

c.

ness and Radiological Protection Branch

.

1

Radiological Controls

'

Emergency Preparedness-

me

-

'

Security

-

d.

Sumation -- B. H. Faulkenberry,- Deputy Regional Administrator

e.

Comments by Southern California Edison

3.

Briefings by Southern California Edison

  • inits 2/3 Spent Fuel Pool Reracking

-