a__
'*
"[. a ten,I'o
UNITED STATES
g
,
I
NUCLEAR REGULATORY COMMISSION
$
MOONV
4
WAL UT cm Ex cALi o
A we
WAY t 5 #90
Docket Nos. 50-206, 50-361, 50 362
Southern California Edison Company
Irvine Operations Center
23 Parker Street-
Irvine, California 92718
i
Attention:
Mr. Harold B. Ray, Vice President
Nuclear Engineering, Safety, and Licensing
Gentlemen:
Subject: SystematicAssessmentofLicenseePerformance(SALP)
October 1, 1988 through January 31, 1990
This refers to the NRC's Systematic Assessment of Licensee Performance (SALP)
Board Report Nos. 50-206/90-02, 50-361/90-02, and 50-362/90-02, which was
transmitted to you by our letter dated April 11, 1990.
During our management
meeting at the San Onofre Site on April 25, 1990, we discussed the results of
-
that assessment.
A copy of the agenda for our meeting is enclosed.
A summary
of our discussions at that meeting, which also included SCE presentations on
twoothersubjects,isprovidedintheenclosedmeetingreport.
'
As discussed in our April 11 letter $ meeting, the SALP Board found yourin the Initial SA
that letter, and during our April 2
overall performance to be very good and directed toward safe facility
operation.
Specific strong performance was noted to have continued in the
l
Radiological Controls, Security, and Emergency Preparedness functional areas,
L
and improvement in the Maintenance / Surveillance area caused that area to also
be considered an area of strength.
During our meeting you; identified' actions
'
being taken to address the relative decline in performance which was observed
in tie Plant Operations area during this SALP period.
Your performance in the
Engineering / Technical Support and Safety Assessment / Quality Verification .
functional areas was observed to have made notable improvements, although we
e
-
emphasize the importance of your completing several improvement programs you
have initiated in these areas.
Our April 11. letter noted that you are not required to reply to the SALP
Board's re) ort but could do so, if desired, within 30 days after our April 25
meeting.
3ased on your comments during that meeting, as described in the
enclosed meeting report, we understand that the SCE has no specific comments
l
on the SALP Board s report and does not alan to provide a written response.
No changes have therefore been made to tie Initial'SALP Board Report
Nos. 50-206/90-02, 50-361/90-02, and 50-362/90-02,Lissued by our letter dated
April 11, 1990, and it is considered to be the final SALP Report.
Inaccordancewith10CFR2.790(a),acopyofthisletterandtheenclosures
will be placed in the NRC Public Document Room.
'
.
l
~
a
\\~
q
..
'.
..
.
,
-2-
MAY 25 IOM
Should you have any questions concerning this letter,
the issues discussed in
the enclosed meeting report, or the SALP Board's report, we will be pleased to
discuss them with you.
Sincerely,
ff ? -
Regional Administr
Enclosures:
1.
Copy of meeting agenda
2.
Management Meeting Report Nos. 50-206/90-23,
.
50-361/90-23, and 50-362/90-23
3.
SCE presentation slides
cc w/ enclosures:
D. J. Fogarty, Executive Vice President
H. B. Bridenbecker Vice President and Si . " Manager _(San Clemente)
H. E. Morgan Station Manager (San Clemente)
,
StateofCalIfornia
l
l
3
9
l
'
.
g
1
l
-
l
.
-~
_,
.---.
'
.
,
e
.
(
1
,.
,
,
-3-
MM 2 51990
bec w/ copy of enclosures:
7
Docket File
.
SALP File
' Project Inspector
'
Resident Inspector
G. Cook
.B.'Faulkenberry
J. Martin
'
A. Johnson
P. Johnson-
C. Trammell, NRR
'
J. Tatum. NRR
L. Kokajko, NRR
- I
bec w/0, enclosures:
Chaittnan Carr
Comissioner Roberts
SALP Board Members
Commissioner Rogers
M. Slosson..ED0
Commissioner Curtiss
J. Grant, NRR
Comissioner Remick
P. Prescott, NRR
J. Tay1or, EDO
LFMB
J. Sniezek, EDO
T.' Murley, NRR
J. Lieberman OE
LPDR
M. Smith
N. Western
J. Zollicoffer
REGION V
t
RfE
\\'#" M \\
i
So .a rJ.J
'
--
-
PJdhnson
SRichards
RScarano
RU merman
BFaulkenberry
5/, /90
5/ /90
.5/ /90
5/PF/90~
5/ /90-
'
'
i
REQUEST COPY ,
REQUEST COPY ,
REQUEST COPY J
' lES1 COPY ;l REQUEST COPY.J
YES / N0
'J YES>/ N0
IYES / N0
] YE
/ NO
YES /' NO-
]
,
i-
,
,
'
L
JMart'in
-
- '
'
5/ /90
t
-
'
REQUES1 COPY -;
- YES /, NO " .
~
'
,
._
L
JSENDsTO PDR
,
I.
' YES - / NO
.1,
-,
?
-
.
.
'
-
.
i
i
s
-
,
l
s
.t
-
,
.-
.,
,.
.
,
,
-3-
bec w/ copy of enclosures:
Docket File
SALP File'
'
'
'
Project Inspector
Resident Inspector
.G.
Cook
B. Faulkenber ry
J.. Martin-
A. Johnson
P. Johnson
C. Trannell, NRR
-J. Tatum, NRR
L. Kokajko, NRR
). Grkn.f,P W
bec w/o enclosures:
Chairman Carr
I'. fr eseatt r'l A
,
r
Commissioner Roberts
SALP f
ard Members
1
Commissioiier Curtiss
A. h'dy , MR
'
j
8"' -
Comiissioner Rogers
-J.
Ru
E^0
n.4ouo5
se,-
l
'
'
Commissioner Remick
LFMB
J. Taylor, EDU
J. Sniezek,;EDO
.
T. Murley, NRR <
LPDR
'
>
- 0, Lieberman, OE
m
,
4
M.. Smith-
N. Western:
,
,
.
.
'
.
J. Zollicoffer'
i,
.
,
s
'
'
.
.
l,' -
+
,7
REGIdNV'
.)
T
'
.
,,
,
.
..
PJ
[w
SP hardst
RS
o
RZimmennan
BFauIkonberry
.
5/M/90
5/ /90'
5/jd90
SMo/9(
5/7/90
'-
1
-
- s
em
(' EQ1 JEST COPY ]/REQD{ST: COPY; 8EQ0ESTCOPY]REQUESTCOPY; REQUESTp0fy;
,
-4'
YES)~/' N0
J .YES/ / N01
! 8ES/ / NO
] YES / NO
-YES / /N0/ .,
f
f
'
y
.
V
v
l')
'-
p
.n
,
JMar' tin
'
d
<
5/ /90
EILQUEST COPY ]
YES / NO-
]
,
}
-:
~YES);TO POR
,J '
,
-SEND
j
/ ' NO -
J
,
$
&
.
5
+ .
m
..
__
_ ---__ _
. , '
r
.
.
,
,
Enclosure 1
SALP MANAGEMENT MEETING
SOUTHERN CALIFORNIA EDISON COMPANY
San 0nofre Nuclear Generating Station
,
April 25, 1990
AGENDA
.
.
1.
Opening Remarks, Purpose of Meeting -- B. H. Faulkenberry, Deputy
Regional Administrator, and H. B. Ray, Vice President
2.
Discussion of NRC Systematic Assessment of Licensee Performance (SALP),
October 1988 - January 1990
' Overview -- B. H. Faulkenber'ry, Deputy Regional Administrator
a.
b.
Review of SALP Assessment -- S. A. Richards, Chief, Reactor Projects
Branch
Plant Operations
-
Mainter.nce/ Surveillance
-
Engineering / Technical Support
-
Safety Assessment /Qvaity . Verification
-
Review of SALP Assessment -- 6. P. Yuhas, Chief. Emergency Prepared-
c.
ness and Radiological Protection Branch
.
1
Radiological Controls
'
Emergency Preparedness-
me
-
'
Security
-
d.
Sumation -- B. H. Faulkenberry,- Deputy Regional Administrator
e.
Comments by Southern California Edison
3.
Briefings by Southern California Edison
- inits 2/3 Spent Fuel Pool Reracking
-
Unit 1 Thermal Shield Support System Replacement
-
4.
Closing remarks
,
_
m