JUN 011990
Docket Nos.:
50-317
L
50-318
Baltimore Gas and Electric Company
Attn: Mr. George C. Creel
Vice President - Nuclear Energy
Calvert Cliffs Nuclear Power Plant
'
MD Rts 2 and 4
.
n
Post Office Box 1535
i
Lusby, Maryland 20657
i
.
Gentlemen:
Subject: Systematic Assessment of Licensee Performance (SALP) Report
Nos. 50-317/88-99 and 50-318/88-99
This refers to the evaluation of the Calvert Cliffs Nuclear Power Plant oper-
ated by the Baltimore Gas and Electric Company (BG&E) which was conducted by
the NRC staff on February 28, 1990. This report was forwarded.to you on
April 4, 1990, and discussed with you in a meeting at the Calvert Cliffs
Nuclear Power Plant on April 23, 1990.
This report specifically addresses activities and observations between
December 1, 1988, and December 31, 1989, and represents the NRC's' assessment of
licensee performance during-that period. Overall, we have observed improvement
in many areas, - We have also noted a number of significant management and pro-
- grarcmntic changes designed for facility improvement. We recognize your commit-
ment to sustain existing enhancements and seek further improvements in all
areas.
Finally, we will continue to closely observe activities at the facility
as your programs continue to evolve.
The_ list of attendees at that meeting is attached as Enclosure 1.
The NRC
Final-SALP Report is attached as Enclosure 2.
Our letter of April 4, 1990, is
attached as Enclosure 3; your initial response to the SALP Report dated
April.19, 1990, is attached as Enclosure 4; and your final response to the SALP
Report dated May 14, 1990, is attached as Enclosure 5.
1
?
Neither remarks-during the April 23, 1990 meeting, nor your response to the
- SALP Report would indicate reason to modify the NRC staff's SALP Report;
l.
therefore, no changes have been made to the report as originally forwarded to
l
you.
f
_L
OFFICIAL RECORD COPY SALP CC 88-99 - 0001.0.0
05/25/90
9006080215 900601
'
ADOCK 0500
17
g
_ gDR
f
.
fi
o
s.
4
.
H
Baltimore Gas and Electric Company
2
JUN Ol g
No reply to this letter is required.
Your actions in response to the NRC SALP
will be reviewed as psrt of the continuing inspection program of your facility.
Your cooperation is appreciated.
Sincerely-,
Oricine) Signed By:
Th: mas T. IAartin
Thomas T. Martin-
Regional Administrator
l
4
Enclosures:
1.
List of Attendees
2.
Final SALP Report No. 50-317/88-99 and 50-318/88-99
3._
NRC Letter to BG&E dated April 4, 1990
4.
BG&E Letter to NRC dated April 19, 1990
5.
BG&E Letter to NRC dated May 14, 1990
cc w/encls:
W. Lippold, General Supervisor, Technical Services Engineering
,
R. McLean, Administrator, Nuclear Evaluations
J. Lemons, Manager, Nuclear Outage Management
. !
!
R. Denton, Manager, Calvert Cliffs Nuclear Power Plant
1
J. Walter, Engineering Division, Public Service Commissior, of Maryland
'
K. Burger, Esquire, Maryland People's Counsel
P. Birnie, Maryland Safe Energy Coalition-
.
Public Document Room (PDR)
1'
Local Public. Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
NRC Resident Inspector
State of Maryland (2)
Chairman Carr
Commissioner Roberts
!
Commissioner Rogers
Commissioner Curtiss
,
Commissioner Remick
i
K. Abraham, PA0 (25)
i
!
1
J
OFFICIAL RECORD COPY SALP CC 88-99 - 0002.0.0
05/25/90
i
. -
_ _ _ _ _ _ _ - - - _ _ _ _ - - _ _ _ _ _ _ _ _ _ - _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ - -
G
,
.
..
.O
Jim 011990
h
Baltimore Gas and Electric Company
3
,
bec w/encls:
.
' Region I Docket Room (with concurrences)
,
Management Assistant, DRMA (w/o encl)
T. Martin, RA
.
R. Burnett, DRA
D. Holody, EC
W. Hodges, DRS
M. Knapp, DRSS
W. Kane, DRP
J. Wiggins, DRP
.
'
J. Linville, DRP
C. Cowgill, DRP
o
D. Vito, DRP
'l
K. Lathrop, DRP
]
M. Conner, DRP
1
J. Caldwell, EDO
i
J. Lieberman, OE
!
R. Capra, NRR
j
D. Mcdonald, NRR
-j
W. Bateman, NRR
Board Members
'l
!
!
,
!
i
!
-I
i
.
b
(v
YIL' UWit
>
^
RI:DRP Q V
R :DRP
RI
)S
JURP
RI A
!
CCowgilT/mjd
J
inville
JWi
ins
Wk
Olt6
-
T artin
ane
{1}?
l'
5/p90-
5 , /90
5/ /0
5/g#/90
5/5 //90
,
0FFI IAL RECORD COPY SALP CC 88-99 - 0003.0.0
05/25/90
l
f,
.
,
..
t
ENCLOSURE 1
List of Attendees at SALP Management Meeting - April 23. 1990
1.
Baltimore Gas and Electric Company
<
G. Adams, Jr., Engineering Technician
A. Anuje, Supervieor, Quality Audits
S. Beverly, Radiation Safety Technician
M. Bowman, General Supervisor, Planning and Support
V. Bradley, Quality Control Inspector
M. Burrell, Technical Analyst
J. Carroll, POSRC Chairman
S. Collins, Principal Engineer, Electrical Modification
G. Creel, Vice President, Nuclear Engineering Division
P. Crinigan, General Supervisor, Chemistry
,
C. Cruse, Manager, Nuclear Engineering Service Department
'
R. Denton, Manager, Calvert Cliffs Nuclear Power Plant
R. Dernoga, Manager, Facility Management
G. Detter, Director, Nuclear Regulatory Matters
R. Diedich, Engineering Analyst-
,
D. Dodson, Nuclear Operations
"
M. Donohoe, Nuclear Public Information Representative
S. Elkins, Executive Assistant to Vice President
l
A. Fissel, Senior Control Technician
.
C. Franklin, Director of Public Information
l
L. Gibbs, General Supervisor, Security Operations
j
R. Heibel, Manager, Quality Assurance Staff
1
L. Larragoite, Acting PE - Compliance
D. Latham, Project Manager, Nuclear Operations Department
i
J. Lemons, Manager, Nuclear Outage
j
W. McCann, Auditor
!
G. McGowan, Chairman of the Board
N. Millis, General Supervisor, Radiation Safety
l
J. Newman, BG&E
1
K. Nietmann, General Supervisor, Nuclear Training
j
R. Olsen, Principal Engineer, Performance Improvement Plan
C. Poindexter, Vice Chairman of the Board
L. Russell, Manager, Nuclear Safety and Planning
l
A. Thorton, General Supervisor, Plant Engineering (Former)
L. Tucker, General Supervisor, Plant Engineering
B. Walshe, Outage and Project Management
L. Weckbaugh, General Supervisor, Electrical and Controls Office
L. Wenger, Principal Engineer, Performance Engineering
l
W. Whitaker, General Supervisor of Mechanical Maintenance
t
S. Williams, BG&E
R. Wyvill, Radiation Safety Scheduler
l
E. Zumwalt, Principal Engineer, Nuclear Operations
l
!
!
.
u
.
,
e
,,
,
P"
,
l
.-
Enclosuro-1
2
I
i
2.
U.S. Nuclear Regulatory Commission
,
.
J. Caldwell, Regional Coordinator for Region I, Office of Executive
Director (EDO)
R. Capra, Director, Project Directorate I-1, Office of Nuclear Reactor
Regulation (NRR)
C. Cowgill, Chief, Reactor Projects Section No lA, Division of Reactor
Projects (DRP)
J. Dixon, Reactor Engineer, Division of Reactor Safety (DRS)
A. Howe, Resident Inspector, Calvert Cliffs
T. Kim, Resident Inspector, Calvert Cliffs
J. Linville, Chief, Reactor Projects Branch No.1, DRP
!
T. Martin, Regional Administrator
D. Mcdonald, Project Manager, NRR
L. Nicholson, Senior Resident inspector, Calvert Cliffs
3.
Others
,
M. Madden, WMJS-FM
R. McLean, Department of Natural Resources, State of Maryland
D. Miller, Westinghouse Corporation
,
?
,