| Site: | Pilgrim |
| Issue date: | 05/31/1990 |
| From: | Jerrica Johnson NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Bird R BOSTON EDISON CO. |
| Shared Package | |
| ML20043D498 | List: |
| References | |
| NUDOCS 9006080126 | |
| Download: ML20043D497 (3) | |
See also: IR 05000293/1990007
Text
kje
c
.c
.
q
,
u
$M 31
i
t
Docket No. 50-293
Boston Edison Corapany
ATTN: Mr. Ralph G. Bird
!
Senior Vice President-Nuclear
Rocky Hill-Road
,
Plymouth, Massachusetts 02360
Gentlemen:
'
Subject: NRC Region I Inspection Report No. 50-293/90-0)
This refers to the routine safety inspection (50-293/90-07) conducted by
.
Messrs. J. Macdonald, A. Cerne, W. Olsen and Mrs. C. Carpenter and others of
this office on March 9 to April 30, 1990 at the Pilgrim Nuclear Power Station,
Plymouth, Massachusetts. Areas eramined during this inspection are described
in the NRC Region I Inspection Report which is enclosed with this letter,
c
Effective oversight and conduct of operations and outage management was evident
during the recently completed mid-cycle maintenance and surveillance outage.
,
In particular, your staff demonstrated the ability to integrate several major
emergent work activities into the schedule and accomplish these activities in a
quality manner. Your comprehensive investigation and troubleshooting of the
'.480 volt _ breaker issue was_. noteworthy.
Your cooperation with us is appreciated.
Sincerely,
ORIGINAL SIGNCD BY:
JON R. JOHNLN
Jon R. Johnson, Chief
Projects Branch No. 3
Division of Reactor Projects
.
Enclosure:
NRC Region I inspection Report No. 50-293/90-07 w/ attachments
,
i
OFFICIAL RECORD COPY
IR PILGRIM 90-07 - 0001.0.0
05/29/90
dI
9006080126 900531
'
?DR
ADOCf. 05000293
W
.
-
-
_
-
,
o
.-
,
,
,
3
Boston Edison Company
2
MAY 31195
cc w/ enc 1:
K. Highfill, Vice President, Nuclear Operations and Station Director
E. Kraft, Acting Plant Manager
J. Dietrich, Licensing Division Manager
R. Swanson, Regulatory Affairs Manager
E. Robinson, Nuclear Information Manager
The Honorable Edward M. Kennedy
The Honorable John F. Kerry
The Honorable Edwe.rd J. Markey
The Honorable Edward P. Ki.rby
The Honorable Peter V. Forman
The Honorable Nicholas J. Costello
The Honorable Lawrence R. Alexander
B. McIntyre, Chairman, Department of Public Utilities
Chairman, Plymouth Board of Selectmen
Chairman, Duxbury Board of Selectmen
Plymouth Civil Defense Director
R. Hallisey, Department of Public Health, Commonwealth of Massachusetts
R. Adams, Department of Labor and Industries, Commonwealth of Massachusetts
D. Tibbetts, Acting Massachusetts Secretary of Energy Resources
Sarah Woodhouse, Legislative Assistant
A. Nogee, MASSPIRG
1
Public Document Room (POR)
!
Local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
NRC Resident Inspector
Commonwealth of Massachusetts, SLO Designee
i
1
4
0FFICIAL RECORD COPY
IR PILGRIM 90-07 - 0002.0.0
05/29/90
l
.
I
l
- =.
,
,
- x .s
e.
7.
-
<.<
1
,
f(
'4
Boston Edison Company
3
AUD' 31500
,
a
t
bec w/ Executive Summary Only:
T. Martin, RI
'
.W. Kane, RI
.
J. Wiggins, RI
- ,
M. Knapp, RI
W. Hodges, RI
R. Bellamy, RI
J. Durr, RI
-!
R. Gallo, RI
,
,
L
bec w/ enc 1:
'
RegionIDocketRoom(withconcurrences)
l
Management Assistant, DRMA (w/o encis)
'
J. Johnson, RI
H. Gray, RI
J. Trapp, RI
L. Cheung, RI
I
R. Bores, RI
M. Miller, RI
K. Abraham, RI
'
R. Barkley, RI
R. Wessman, NRR
i
R. Eaton, NRR
K. Naidu, NRR
J. Kauffman, AE00
J. Macdonald, SRI.- Pilgrim Station
'
.
A. Cerne, RI - Pilgrim Station
r
C. Carpenter, RI - Pilgrim Station
}
W. Olsen, RI - Pilgrim Station
.
r
i
i
RI:
RI:0RP .
I,
fun Gn/r*
sl
'Macdonald
Gray
I nson
-
5/29/90
'
0FFICIAL RECORD COPY
IR PILGRIM 90-07 - 0003.0.0
05/29/90
t
,
__