ML20043D388

From kanterella
Jump to navigation Jump to search
Informs That Rev 30 to Emergency Plan Meets 10CFR50.47(b) Requirements & Acceptable,W/Exception of Change Re Basis for Ingestion Exposure Pathway Zone Size.Change in Wording Should Be Completed During Next Plan Review Cycle
ML20043D388
Person / Time
Site: McGuire, Mcguire  Duke Energy icon.png
Issue date: 05/23/1990
From: Dan Collins
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Tucker H
DUKE POWER CO.
References
NUDOCS 9006070453
Download: ML20043D388 (3)


Text

y,,

[ n' x h(fiOQ[

+

MAY 2 3 1990 F

j

[

Docket Nos. 50-369, 50-370 License Nos. NPF-9, NPF-17 i

t Duke Power Company i

ATTN: Mr. H. B. Tucker, Vice President

' Nuclear Production Department 422 South Church Street Charlotte, NC 28242

Gentlemen:

SUBJECT:

. MCGUIRE NUCLEAR STATION PLAN REVIEW, REVISION 30

'We have completed our review of Revision 30 to your McGuire Nuclear Station Emergency Plan, dated March-1990.

Based on our review, we have concluded that-the changes meet the planning standards of 10 CFR 50.47(b) and the requirements of Appendix E to 10 CFR 50 with one exception.

. Page i-4, Item C, Planning Basis, Ingestion Exposure Pathway contained a change regarding the basis.for the ingestion exposure pathway zone size. The last paragraph was modified to state "There is little likelihood of exceeding ingestion pathway Protective Action Guide levels at ten miles for a significant release of radioactive materials." The addition of the word "little" con!pletely-changed the meaniny of the statenient and. did not appear consistent with statements made elsewhere in tne ' Plan.

This matter was discussed with R. Leonard of Dub Power Company where it was determined that the. change was

a typographical error.

The licensee representative conunitted to revise the paragraph to be as stated in the previous Plan ' revision.

This is,to be

-completed during the next Plan review cycle.

Please be r'eminded that 10. CFR 50.54(q) requires' that proposed changes that-decrease the effectiveness of your Emergency plan shall not be. implemented 1

fwithout application to and approval by the Conmission. However, changes may be made without -Consission approval if such - changes do not decrease the.

effectiveness of the Plan, and the Plan, as changed, continues to meet-the standards of 10 CFR' 50.47(b) and the requirements of Appendix E to 10 CFR 50.

If a change is made without approval, you should furnish copies in accordsi1ce with 10 CFR 50.54(q).

Also, any changes to the Emergency Plan Implementing Procedures, should be make in accordance with the requirements of 10 CFR 50, Appendix E Section V.

i 9006070453 900523 PDR ADOCK 05000369

[q F

PDC

/

Wb w..

\\ [.)

y, Duk'e-Power Company.

2

,Should you-have any(questions regarding this letter, please contact Mr.', William H.,Rankin of our staff at 404-331-5618.

Sincerely.

CRIGINAL SIGNED BY W!LUAM H. NAlfdN Douglas M. Collins, Chief Emergency Preparedness and Radiological Protection' Branch Division of Radiation Safety and Safeguards cc:

T. L. McConnell Station Manager McGuire Nuclear Station P. 0. Box 488 Cornelius, NC 28031 n

J. S. Warren Nuclear Production Department Duke Power Company P. O. Box 33189 Charlotte, NC 28242 A'. V. Carr, Esq.

Duke Power Company 422. South Church Street Charlotte, NC 28242 J. Michael McGarry, III, Esq.

Bishop, Cook, Purcell and Reynolds-1400 L Street, NW Washington, D. C.

20005

'Dayne H. Brown, Director

' Division of Radiation Protection N. C. Department of Environment, Health & Natural Resources

-P. O. Box 27687 Raleigh, NC 27611-7687 County Manager of Mecklenburg County 720 East Fourth Street Charlotte, NC 28202 (cc: Cont'd on page 3) i

l ',

bl j; i

o Duke Power Comp 6ny 2

L (cc:

ennt'd)

S. S. Kilborn, Area Manager Mid-South Area, ESSD Project Westinghouse Electric Corporation MNC West Tower - Bay 239 P. O. Box 355 Pittsburgh, PA 15230 Dr. John M. Barry Department of Environmental Health Mecklenburg County 1200 Blythe Boulevatd Charlotte, NC 28203 Karen E. long Assistant Attorney General N. C. Department of Justice P. O. Box 629

-Raleigh, NC-_27602 State of North Carolina bec: D. Hood, NRR B. R. Bonser, RII M. B. Sh)slock, RII

( Miocument Control Desk NRC Resident Inspector U.S. Nuclear Regulatory Consission 12700 Hagers ferry Rd.

Huntersville, NC 28078-8985 t

l R

45$'

RI :DRSS RII: RP 6/I WRankin[&

s

>wlock yers 5p/90 sat /90 5/490

(

%