Confirms 900531 Enforcement Conference in Glen Ellyn,Il to Discuss Violations Noted in Insp Rept 50-461/90-09.Handout Describing Position Re Enforcement Considerations Requested. List of Topics to Be Discussed Encl
ML20043C229
Person / Time
Site: Clinton Constellation icon.png
Issue date: 05/24/1990
From: Greenman E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Jamila Perry
ILLINOIS POWER CO.
References
EA-90-100, NUDOCS 9006040257
Download: ML20043C229 (3)


See also: IR 05000461/1990009

Text

UNITO STATES

' f*gm *809g

,

e

e

NUCLEAR CECULATORY COMMisslON

y

j'f,,

' * ,

!

"[g

REGl0N 111

%'

tot noostvtLT no Ao

I

CLEN ELLYN, ILUNOt$ $0137

,

' . . . . . * "

MAY 2 41930

,

.

Docket No. 50-461

EA 90-100

<

,

'

I

Illinois Power Company

ATTN:

J. S. Perry

Vice President

'

Clinton Power Station

.

Mail Code V-275

P. O. Box 678

l

Clinton, IL 61727

'

Gentlemen:

,

This confirms our plans as discussed between R. Lanksbury of my staff and

F. Spangenberg of your staff to conduct an Enforcement Conference at

1:00 p.m. , (CDT) on May 31, 1990, at the Region 111 Office in

Glen Ellyn, Illinois. The conference is to discuss the apparent violations

documented in Inspection Report 50-461/90009(DRP) regarding the event on

,

April 11, 1990, when several control rods were withdrawn during a reactor

startup while the main turbine bypass valves were not fully closed.

I

It is our understanding that six individuals closely involved with the event

will be attending the conference.

You should be prepared to discuss the

i

topics listed in the enclosure to this letter. We also request that you

provide a handout which succinctly describes your position concerning these

enforcement considerations.

>

We will gladly discuss any questions you may have regarding this matter.

Sincerely,

l0h LNW

Edward G. Greenman, Director

p Division of Reactor Projects

Enclosure: As stated

See Attached Distribution:

l

900604o257 900524

PDR

ADOCK 05000461

,

,

PDC

.

g

40

..

i

',

'.

,

-

.

s

-

Illinois Power Company

2

Distribution:

1

cc W/ enclosure:

1

J._ Cook, Manager, Clinton Power Station

l

F..Spangenberg, III, Manager -

Licensing and Safety

,

DCD/DCB(RIDS)

Licensing Fee Management Branch

r

Resident Inspector, RIII

,

J. Hickman, NRR, PM

'

J. McCaffrey, Chief, Public

Utilities Division

H. Taylor, Quality Assurance

Division, Sargent & Lundy

,

Engineers

,

Patricia O'Brien, Governor's

Office of Consumer Services

S. Zabel, Esquire, Schiff, Hardin,

& Waite

L. Larson, Project Manager,

,

General Electric Company

Chairman,.DeWitt County Board

Illinois-Department of

,

Nuclear Safety

,

Robert Newmann, Asst. Director

J. G. Partlow, Office of

.

Nuclear Reactor Regulation

J. Lieberman, Office of

Enforcement

J. R. Goldberg, Office of

General Counsel

l

I

!

.

p.. ' '.

.

'

',

,:

,

0."

e

Enclosure

,

Enforcement Conference Discussion Topics

1.

General discussion of root cause and corrective actions.

2.

Discussion of the Human Performance Evaluation'for this event.

3.

Progress in clarifying Technical Specification 3.1.4.1.

4

Status of independent team's additional recommendations:

Performing a review of the critique administrative process

to improve the efficiency of writing and publishing operational'

critique reports;

publishing formal guidance for performing briefs on upcoming

work or events;

Reviewing the plan and resources for achieving procedural

improvement goals; and

Continually encouraging operators to verify through all

available means that the plant is responding to their actions

as expected.

5.

Discussion of efforts to ensure that operators use safety and not

schedules as the b6 sis for plant operations.

!

i