Forwards Interim SALP Rept 50-302/90-05 for Jan 1989 - Feb 1990.NRC Will Continue Monitoring Progress of Ongoing Improvement Programs as Well as Overall Performance of Plant During Current Assessment Period.W/O Encl Rept
ML20043B189
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 05/11/1990
From: Ebneter S
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Beard P
FLORIDA POWER CORP.
References
NUDOCS 9005250045
Download: ML20043B189 (4)


See also: IR 05000302/1990005

Text

E

}

U

OFFICIAL COPY

!

[

,

'

,

.

onC.

>

i

MAY 11 1990

r,

i

'

.

Docket No. 50-302

'

License No..DPR-72

Florida Power Corporation

Mr. Percy.M. Beard, Jr.

Senior Vice President, Nuclear

Operations

i

^

ATTN: Manager Nuclear Operations

,i

Licensin

!1

P.O, box 219-MAgci

Crystal River, FL 32629

1

'

Gentlemen:

,

,

SUBJECT:

NRC INSPECTICfi REPORT NO. 50-302/90-05

The NRC Systematic Assessment of Licensee Performance (SALP) has been

i

completed for your Crystal ~ River facility. The facility was evaluated for the

,

period January 1,1989, through February 28, 1990.

The results of the

evaluation are documented in the enclosed Interim SALP Report.

This report

will be discussed with you at a public meeting to be held at the Crystal River

site on May 23, 1990, at 9:00 a.m.

Crystal River's

serformance: was evaluated in the functional areas of Plant

Operations,. Radiological

Controls, Maintenance / Surveillance,

Emergency

Preparednest,

Security,

Engineering / Technical

Support

and

Safety

-

Assessment / Quality Verification.

Crystal River's ratings improved in four

of seven areas with improvements noted in the remaining areas since the last

assessment period.

Noteworthy, has been the improvement of the Radiation

1

Controls and Emergency Preparedness areas, both being upgraded to Category 1

ratings.

Increased management oversight and attention to detail have been

'

effective in initiating the overall improvements noted in the report.

One

area, Engineering / Technical Support, improved to a Category 2 rating; however,

>

continued management emphasis is required to maintain progress in tFis area.

'

The assessment indicates that over the SALP period, Crystal River's performance

exceeded the level needed to meet minimum regulatory requirements.

Improved

performance- was a trend noted throughout the assessment period, but was

particularly evident during the second half of the period. These improvements

,

. are. a result of management changes (both corporate and site), emphasis on

procedure adherence, procedure upgrades, expanding and training site engineer-

i

ing, and management's actions to place the Operations Department in a position

,

to direct and control plant activities.

We recognize your efforts to improve

plant safety and engineering performance demonstrated by enhanced management

oversight.

We will continue to monitor the progress of ongoing improvement

programs as well as the overall performance of Crystal River during the current

assessment period.

.

9005250040 900511

PDR

ADOCK 05000302

h6

Q

PDC

\\V

-

3 C of

+

v-

m

d.;

"'

'

'

~i

'

h,,,~f.:

y.f

~

MY!11990

!

.,

Florida Power Corporation-

2

'

(

t

t

'Any comments you have concerning our evaluation of the performance of your .

"

'

Crystal River facility should -be submitted to this office within 30 days

'

following the date of our meeting.. These comments will'be considered in the'

L

development of the Final SALP report.

-

'-

.

.

i

Should you have any questions = concerning this letter, we' will be glad to

.

discuss them with you.

i

Sincerely,

t

,

'

n

ORIGINAL SIGib

Stewart D. Ebneter

Regional Administrator

,

Enclosure:

,

Interim SALP Report - Crystal River-

'

cc w/ enc 1:

Gary L. Boldt.

.

Vice President, Nuclear Productior

'

Florida Power Corporation-

P. O.. Box 219-SA-2C

Crystal. River,. FL- 32629

c

.

.

'

P. F. McKee, Director

Nuclear Plant Operations

Florida Power Corporation

,

P. 0.. Box 219-NA-2C

r

Crystal River, FL 32629

'R..C. Widell, Director

<

.

-Nuclear Operations Site Support

Florida Power Corporation

'

<

P'.O. Box 219-NA-21

.

Crystal River, FL 32629

A. H. Stephens

General Counsel

u

Florida Power Corporation

-

p

MAC - A5D

-P. O. Box 14042-

St. Petersburg,.FL 33733

(cc.w/ encl cont'd page 3)

1.

p

.

.

"';

^

,

t

.-

,

) )*f i ~ '

'

,

'

. Florida Power Corporation

3'

'

MAY I 1 1990

f(ccw/ encl' cont'd)"

r,: -

Attorney General

.

,

~

~ Department of Legal Affairs-

t

.The Capitol.

!

Tallahassee, FL 32304

'

,

' Jacob ~ Daniel Nash

.

' Office of,R6diation' Control

i

Department of Health and

'l

Rehabilitative Services

-

1317 Winewood Boulevard .

'2

'

Tallahassee, FL 32399-0700

'

-Administrator

.

'"!

Department of Environmental

Regulation

Power Plant Siting Section

State of Florida-

'

2600 Blair Stone Road

. Tallahassee, FL '32301

State Planning and Development

';

Clearinghouse

' Office of. Planning and Budgeting

Executive Office of the Governor

The Capitol Building

,

-Tallahassee, FL 32301

Chairman

Board of County Commissioners-

Citrus County.

110 N. Apopka' Avenue

Iverness, FL 36250

Robert B. Borsum

LBabcock~and Wilcox Company

s

Nuclear Power Generation Division

J1700 Rockville Pike ~,. Suite 525

.'

'

Rockville, MD 20852-1631

State of Florida

bec'w/ encl:

i

K. M. Carr, O _irman

'T. MJ Roberts, Commissioner

F.;J. Remick, Commissioner

'K. C. Rogers, Commissioner

J. R. Curtiss, Commissioner

.

J. M. Tay1or, E00

(bec w/ encl cont'd page 4)

-

_

- - - - - . - - . .

e

t

i

h

, . . . - si

MAY 11: 1990

-

-

.

,

Florida Power Corporation

4

,

(bec.w/ enc 1-cont'd)

H. L. Thom) son, Jr.. ED0

R. W. Borciardt ED0

T. E. Murley, NRR

S. Varga, NRR

H.-Berkow, NRR.

H. Silver .NRR'

Regional Administrators, R1, Rill

>

RIV, and RV.

K.-Clark, PAO,.Ril

-

M..Sinkule DRP, RII

R;,Crienjak.-DRP,Rll'

.S.-~ Vias DRP, RIl

K.-Landis, TSS, Rll

P. Holmes-Ray,-RII

DRS/DRSS Branch Chiefs and

Section Chiefs, RII

-INPO

IMPELL.

Document Control Desk

y

.

RpRg

N

fe.41' Silver -

(<.llBerkow

/*9H0Fmes-Ray

=05//#/90

05//4/90

05//490

RII:DpP'

RI :D P

RII:DRP

R

RS

G', MS

MS

'

v

SVias

RCrienjak

MSinkule

er choff

Stohr

05/10/90

05//D/90

05/jo/90 /

5 0 /90

05[(f/90

Ril-

RI

RA

yes

- JMUNoan

0 //0/90

05/[h/90

.