Text
E
}
U
OFFICIAL COPY
!
[
,
'
,
.
onC.
>
i
MAY 11 1990
r,
i
'
.
Docket No. 50-302
'
License No..DPR-72
Florida Power Corporation
Mr. Percy.M. Beard, Jr.
Senior Vice President, Nuclear
Operations
i
^
ATTN: Manager Nuclear Operations
,i
Licensin
!1
P.O, box 219-MAgci
Crystal River, FL 32629
1
'
Gentlemen:
,
,
SUBJECT:
NRC INSPECTICfi REPORT NO. 50-302/90-05
The NRC Systematic Assessment of Licensee Performance (SALP) has been
i
completed for your Crystal ~ River facility. The facility was evaluated for the
,
period January 1,1989, through February 28, 1990.
The results of the
evaluation are documented in the enclosed Interim SALP Report.
This report
will be discussed with you at a public meeting to be held at the Crystal River
site on May 23, 1990, at 9:00 a.m.
Crystal River's
serformance: was evaluated in the functional areas of Plant
Operations,. Radiological
Controls, Maintenance / Surveillance,
Emergency
Preparednest,
Security,
Engineering / Technical
Support
and
Safety
-
Assessment / Quality Verification.
Crystal River's ratings improved in four
of seven areas with improvements noted in the remaining areas since the last
assessment period.
Noteworthy, has been the improvement of the Radiation
1
Controls and Emergency Preparedness areas, both being upgraded to Category 1
ratings.
Increased management oversight and attention to detail have been
'
effective in initiating the overall improvements noted in the report.
One
area, Engineering / Technical Support, improved to a Category 2 rating; however,
>
continued management emphasis is required to maintain progress in tFis area.
'
The assessment indicates that over the SALP period, Crystal River's performance
exceeded the level needed to meet minimum regulatory requirements.
Improved
performance- was a trend noted throughout the assessment period, but was
particularly evident during the second half of the period. These improvements
,
. are. a result of management changes (both corporate and site), emphasis on
procedure adherence, procedure upgrades, expanding and training site engineer-
i
ing, and management's actions to place the Operations Department in a position
,
to direct and control plant activities.
We recognize your efforts to improve
plant safety and engineering performance demonstrated by enhanced management
oversight.
We will continue to monitor the progress of ongoing improvement
programs as well as the overall performance of Crystal River during the current
assessment period.
.
9005250040 900511
ADOCK 05000302
h6
Q
\\V
-
3 C of
+
v-
m
d.;
"'
'
'
~i
'
h,,,~f.:
y.f
~
MY!11990
!
.,
Florida Power Corporation-
2
'
(
t
t
'Any comments you have concerning our evaluation of the performance of your .
"
'
Crystal River facility should -be submitted to this office within 30 days
'
following the date of our meeting.. These comments will'be considered in the'
L
development of the Final SALP report.
-
'-
.
.
i
Should you have any questions = concerning this letter, we' will be glad to
.
discuss them with you.
i
Sincerely,
t
,
'
n
ORIGINAL SIGib
Stewart D. Ebneter
Regional Administrator
,
Enclosure:
,
Interim SALP Report - Crystal River-
'
cc w/ enc 1:
Gary L. Boldt.
.
Vice President, Nuclear Productior
'
Florida Power Corporation-
P. O.. Box 219-SA-2C
Crystal. River,. FL- 32629
c
.
.
'
P. F. McKee, Director
Nuclear Plant Operations
Florida Power Corporation
,
P. 0.. Box 219-NA-2C
r
Crystal River, FL 32629
'R..C. Widell, Director
<
.
-Nuclear Operations Site Support
Florida Power Corporation
'
<
P'.O. Box 219-NA-21
.
Crystal River, FL 32629
A. H. Stephens
General Counsel
u
Florida Power Corporation
-
p
MAC - A5D
-P. O. Box 14042-
St. Petersburg,.FL 33733
(cc.w/ encl cont'd page 3)
1.
p
.
.
"';
^
,
t
.-
,
) )*f i ~ '
'
,
'
. Florida Power Corporation
3'
'
MAY I 1 1990
f(ccw/ encl' cont'd)"
r,: -
Attorney General
.
,
~
~ Department of Legal Affairs-
t
.The Capitol.
!
Tallahassee, FL 32304
'
,
' Jacob ~ Daniel Nash
.
' Office of,R6diation' Control
i
Department of Health and
'l
Rehabilitative Services
-
- 1317 Winewood Boulevard .
'2
'
Tallahassee, FL 32399-0700
'
-Administrator
.
'"!
Department of Environmental
Regulation
Power Plant Siting Section
State of Florida-
'
2600 Blair Stone Road
. Tallahassee, FL '32301
State Planning and Development
';
Clearinghouse
' Office of. Planning and Budgeting
Executive Office of the Governor
- The Capitol Building
,
-Tallahassee, FL 32301
Chairman
Board of County Commissioners-
Citrus County.
- 110 N. Apopka' Avenue
Iverness, FL 36250
Robert B. Borsum
LBabcock~and Wilcox Company
s
Nuclear Power Generation Division
J1700 Rockville Pike ~,. Suite 525
.'
'
Rockville, MD 20852-1631
State of Florida
bec'w/ encl:
i
K. M. Carr, O _irman
'T. MJ Roberts, Commissioner
F.;J. Remick, Commissioner
'K. C. Rogers, Commissioner
J. R. Curtiss, Commissioner
.
J. M. Tay1or, E00
(bec w/ encl cont'd page 4)
-
_
- - - - - . - - . .
e
t
i
h
, . . . - si
MAY 11: 1990
-
-
.
,
Florida Power Corporation
4
,
(bec.w/ enc 1-cont'd)
H. L. Thom) son, Jr.. ED0
R. W. Borciardt ED0
T. E. Murley, NRR
S. Varga, NRR
H.-Berkow, NRR.
Regional Administrators, R1, Rill
>
RIV, and RV.
K.-Clark, PAO,.Ril
-
M..Sinkule DRP, RII
R;,Crienjak.-DRP,Rll'
.S.-~ Vias DRP, RIl
K.-Landis, TSS, Rll
P. Holmes-Ray,-RII
DRS/DRSS Branch Chiefs and
Section Chiefs, RII
-INPO
IMPELL.
Document Control Desk
y
.
RpRg
N
fe.41' Silver -
(<.llBerkow
/*9H0Fmes-Ray
=05//#/90
05//4/90
05//490
RII:DpP'
RI :D P
RII:DRP
R
RS
G', MS
MS
'
v
SVias
RCrienjak
MSinkule
er choff
Stohr
05/10/90
05//D/90
05/jo/90 /
5 0 /90
05[(f/90
Ril-
RI
yes
- JMUNoan
0 //0/90
05/[h/90
.