Special Rept 90-03:on 900412,Fire Diesel Pump 1-1 Not Restored to Functional Status within 7 Days.Pump Removed from Svc to Install Mod.Mod Completed,Tested & Returned to Functional Status on 900420
ML20043A790
Person / Time
Site: Oyster Creek
Issue date: 05/11/1990
From: Fitzpatrick E
GENERAL PUBLIC UTILITIES CORP.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
90-03, 90-3, NUDOCS 9005230130
Download: ML20043A790 (2)


Text

.,

f

.- - + e M:;4.if 7Nuclear

:',rg e see

~

OPU Nuclear Corporation Forked River,New Jersey 08731-0388 609 971 4000 Writer's Direct Dial Number:

May ll,1990

'U.S. Nuclear Regulatory Commission Attn Document Control Desk Washington, D.C.

20555 Dear Sir

Subject:

Oyster Creek Nuclear Generating Station

-l Docket No. 50-219-Special Report 90-03 Enclosed is Special Report 90-03 which is submitted in accordance with Technical Specification 3.12.B.

If any questions'or comments shoald arise, please contact Mr. John Rogers, Oyster Creek Licensing Engineer at 609-971-4893.

Very truly yours,

/

f C //

W e

s n

n tor Oyster Creek EEF/JJR/jc Enclosure cca Mr.. Thomas Martin, Administrator Region 1 U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 NRC Resident' Inspector Oyster Creek Nuclear Generating Station Mr. Alexander Dromerick U.S. Nuclear Regulatory Commission Mail Station Pl-137 f

j Washington, DC 20555

.//[,F

)

9003230130 900511

/ I PDR ADOCK 05000219 GPU Nuclear Corpora $ ibis a subsidia,y of the General Public Utilities Corporation j

' t 1

OYSTER CREEK NUCLEAR GENERATING STATION Forked River, New Jersey 08731 special Report 90.-03 ReDort Date Occurrence Date 4/12/90 i

Identification of occurrences i

Fire Diesel Pump 1-1 was removed from service to install a modification and was not restored to a functional status within seven (7) days as required by i

Technical specification 3.12.B.

Deectiotion of occurrence The Fire Diesel' Pump 1-1 was taken out of service to install a modification which replaced the existing pressure switch / recorder mechanism with an upgraded design.

The installation, testing and return to service required eight (8) days.

Analysis of occurrences l

Maintenance on the Fire Diesel Pump automatic start pressure switch / recorder mechanisms was becoming a burden to the Oyster Creek Nuclear Plant.

The switch / recorder mechanisme were difficult to calibrate to within the desired tolerances and no replacement parts were available due to the obsolete design.

As the Fire Diesel 1-2 was functional during the time period the modification was being insta11od in fire diesel 1-1, the safety significance.of this event was minLmal.

I Corrective Action:

1 The modification to Fire Diesel Pump 1-1 pressure switch / recorder me8hanism was completed, tested and returned to functional status on 4/20/90.

1 o

l l

l l

N

-..._.c