ML20043A228

From kanterella
Jump to navigation Jump to search
Forwards Insp Rept 50-293/90-12 on 900416-20.No Violations Noted.Planning & Radiological Safety Controls for Outage Work Significantly Improved Over Previous Insps in Area
ML20043A228
Person / Time
Site: Pilgrim
Issue date: 05/10/1990
From: Ronald Bellamy
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Bird R
BOSTON EDISON CO.
Shared Package
ML20043A229 List:
References
NUDOCS 9005210042
Download: ML20043A228 (2)


See also: IR 05000293/1990012

Text

p

-

a

~'

T

,

w

'

4 .

{}

,

a

'

MAY 10l1990

.

<

.

Docket No. 50-293

Boston, Edison Company; .

ATTN: Mr. Ralph G. Bird

' Senior Vice President - Nuclear

!

Pilgrim Nuclear Power Station-

RFD #1: Rocky Hill.' Road

j

-Plymouth,. Massachusetts 02360

'

Gentlemen:

A

Subject:

Inspection, Report No,= 50-293/90-12 :

A routine inspection of.the Pilgrim Station radiation safety program.was

conducted by Mr. T, Dragoun on. April?l6-20,1990~, < Areas. reviewed included .

organization and staffing and control-of-outage: work.

No violations were identified. Our inspectioncindicated:that planning and.

'

radiological' safety _ controls.for outage. work-are significantly improved over

previous' inspections in this area.

-Your cooperation with us is appreciated.

Sincerely,-

9

!

Original Signed By:

Ronald R. Ballamy

.:

Ronald R. Bellamy, Chief

j

Facilities Radiological Safety-

'and Safeguards Branch

Division of Radiation Safety

!

and Safeguards

l

Enclosures: NRC Region I Inspection Report No. 50-293/90-12

,

i

,. S

,

vm

'

-

'

.

d

%

~

Ik

0FFICIAL RECORD COPY

IR PILGRIM 90-12 - 0001.0.0

05/10/90

!

900521o042 900310

j

PDR

ADOCK 05000293

Q

PDC

.,

,

i

,

,

,i

1 y

'

i

,

.i

[

a-

Boston Edison Company-

2

MAY 1.01990

<

cc w/ encl:-

-K..Highfill,-Vice~ President, Nuclear Operations

R. Anderson,~ Plant Manager

.,

J. Dietrich, Licensing Division Manager

.E. Robinson, Nuclear Information Manager

R. Swanson, Regulatory Affairs. Manager -

The Honorable' John.F. Kerry-

The' Honorable. Edward J Markey

The-Honorable' Edward P. Kirby

The. Honorable Peter V.'Forman

The Honorable Edward M.: Kennedy

1

The Honorable- Lawrence:R. Alexander

1

')

The Honorable N!cholas-J. Costello-

.

.

B.- McIntyre, Chr.irman,' Department of : Public Utilities

Chairman,' Plymouth: Board of Selectmen

Chairman, Duxbury Board of. Selectmen

Plymouth Civil Defense 1 Director

,

R. Hallisey, Department of Public Health, Commonwealth of'MassachusettsJ .

'

.

R. Adams, Department of Labor and Industries, Commonwealth of Massachusetts

D. Tibbetts,. Acting Massachusetts Secretary of Energy Resources

.

Sarah Woodhouse,) Legislative Assistant

A. Nogee, MASSPIRG

i

Public Document Room (POR)

. Local Public Document Room:(LPDR)

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector

Commonwealth'of Massachusetts, SLO Designee

'

bec.w/ enc 1:

Region I Docket Room (with concurrences)

?

Management Assistant, DRMA (w/o enc 1)~

4

T. Martin, RA

.

i

R. Bellamy, DRSS

J, Johnson, DRP

R. Blough, DRP

J.- Macdonald, SRI - Pilgrim _(with concurrences)-

M. Conner, SALP Reports Only

'

K. Abraham, PA0 (20) SALP Report and (2) All Inspection Reports

.

J. Caldwell, NRR

.l

R. Wessman, NRR

D. Mcdonald, NRR

.j

J

r

R

-

RS

RI:

S

Dragoun/mk

Pasdiak

Bellamy

05A] 0FFICIAL RECORD COPY

05/Y/90

/90

05/10 /90

IR PILGRIM 90-12 - 0002.0.0

j

05/04/90

l

l

.