Text
-
q
~
passtyg -
/
i Nif og UNITED STATES
,,[
- g-NUCLEAR REGULATORY COMMISSK N y
7
% ~
7.
t j, WASHINGTON, D C. 20666 -
s
[
May-1, 1990
^
4
.Docb. Ho. 50-368 Mr. Heil S. Carns Vice President,-Nuclear
-Arkansas Power and Light Company-P. O. Box 551 Little Rock,- Arkansas. :72203.
j!
Dear Mr. Carns:
SUBJECT:
-SAFETY' EVALUATION ON'THE ARKANSAS NUCLEAR ONE, UNIT 2
. COMPLIANCE WITH:THE-ATWS RULE, 10 CFR 50.62-DIVERSE
-EMERGENCY FEE 0 WATER ACTUATION SYSTEM'(TAC NO. 59069)
The" ATWS Rule-(10 CFR 50.62,_ "Requirem.nts for! Reduction of Risk from Anticipated y
Transients Without Scram ( ATWS) Events for. Light-Water-Cooled NuclearL Power i
Plants") requires improvements in the design and operation.of commercial nuclear
' power facilities to reduce the. likelihood.of failure to shutdown the reactor-
{
following anticipated transients, and to mitigate the consequences of an'ATWS-event.- The requirements for Combustion Engineering: plants'such as Arkansas-i Nuclear-One,: Unit'2(ANO-2)aretoprovideadiversescramsystem(DSS),
diverse auxiliary (DTT).feedwatersystem(DAFW) actuation,:anddiverse-initiation-of turbine-trip-Paragraph (c)(6) of the rule requires that information sufficient to demonstrate compliance with the requirements be submitted to NRR.
a In response to Arkansas Power and Light Company's (AP&L) submittals.~ dated 1
' November 3,(1988,' February 2,-andFebruary 21, 1989, the staff issued a safety n
evaluation SE)onJune'21,1989, addressing the.acceptabilityfof the ANO-2 DSS and DTT designst These ATWS modifications were completed during.the.last refuelingoutageforANO-2L(11/89). The final:ATWS-requirement'for this plant, DAFW or diverse emergency feedn ter actuation system (DEFAS) wasidescribed in=
AP&L's submittal to the staff dated January 15,-1990. The: staff has reviewed this information and as discussed in~the enclosed SE has' concluded that the DEFAS desfgns are acceptable'and meet the requirements of the ATWS rule.
l i
' As per yt-or January submittal, the DEFAS will be-installed during the ANO eighth refueling outage, currently scheduled to be completed in April 1991~.-
q et d
.:j
[
90051/0100 900501
- t PDR ADOCK 05000368
\\
/
P PDC
^
\\
1 n'
Nr. Neil S. Carns
-2 After installation,:the staff will' conduct a' review of the DEFAS software validation and verification processes and end-to-end procedures as part of an on site implementation audit..
The issuance of this SE' closes TAC No. 59069.
Sincerely, i
.4
/3l i
Chester Poslusny, Jr., Project Manager Project Directorate IV
~
Division of Reactor Projects. 11 IV,'V, and Special Projects Office of Nuclear Reactor Regulation
Enclosure:
As stated
.cc w/ enclosure:
See next page DISTRIBUTION Docket File NRC PDR Local PDR PD4 Reading G. Holahan MS 13E4 1
ADR4 F. Hebdon P. Noonan C. Poslusny i
OGC-Rockville E. Jordan MS MNBB 3701 ACRS (10) MS P-315 PD4 Plant File
-t
(>
lrt-~ :PD4/LA ~ J
- :PD4 s/
- PD4/D
.....:......../'.,...:.../PM'T
...........:. 1y
~
AME~ :PNoona
- CPoslusny:rc :FHeacon i
.....:....,y...........:.............:..............:..............:............................
-ATE: :04[U90-
- 04/q/90 0D(/I/90 1
~
3 0FFICIAL RECORD COPY Document Name: AN02 LTR/59069 f
,.1-
R
.Mr. Neil S. Carns After installation, the staff will con' duct a review of the DEFAS software validation and. verification processes and end-to.end procedures as part of an on site implementation audit.
The issuance of this SE" closes TAC Ho. 59069.
I Sincerely, j
js/
Chester Posiusny,-Jr., Project Manager.
Project Directorate IV
!f Division of Reactor Projects. III d
IV, V, and Special Projects Office <f Nuclear Reactor Regulation
Enclosure:
As stated t.
cc w/ enclosure:
d
'See next page DISTRIBUTION, RDocketillea NRC PDR Local PDR PD4 Reading i
G. Holahan MS 13E4 ADR4 F. Hebdon P. Noonan C. Poslusny OGC-Rockville E. Jordan MS MHBB 3701 ACRS (10) MS P 315 PD4 Plant File 4
l 1
0 -
0FC.
- PD4/LA
- PD4
- PD4/0
...... :........ /).... :.../ P M \\,)
...........:. 1
- CP os l u s ny : rc : FHe$
HAME ':PNoona on
......:... p...........:..............:.,............:..............:............................
DATE :04Mb90
- 04/ti/90
- J//I/90 5
0FFICIAL RECORD COPY Of-@(
Document.Name: AN02 LTR/59069 1--__
-s:
Mr. Neil S. Carns +
After installation, the staff will conduct a review of the DEFAS software validation and verification processes and end-to-end procedures as part of r.e.
on site in.plementation audit.
The issuance of this SE closes TAC No. 59069.
I Sincerely, f
h/t hco bo i
Chester Posiusny, Jr., Project Manager Project Directorate IV Division.of Reactor Projects - III IV, V, and Special Projects 4-Office of Nuclear ReactorLRegulation
Enclosure:
As stated cc w/ enclosure:
See next page L
l l
l I
r i
f-
)
(
l 1
.i 4
0 L.-----.-- -....
+
Mr. Neil S. Carns Arkansas Power & Light Company Arkansas tiuclear One, Unit 2 Cc:
i tir. Early Ewing, General Manager Mr. Charles B. Brinkman, Manager i
Technical Suppo.t and Assessment Washington Nuclear Operations Arkansas Nuclear One Cottbustion Engineering, Inc.
P. O. Box 608.
12300 Twinbrook Parkway, Suite 330 Russellville, Arkansas ~ 72801 Rockville, Maryland P0852 Mr. Jerry Yelverton, Director Nuclear Operations Honorable Joe W. Phillips Arkansas Huclear One County Judge of Pope County P; 0.-Box 608 Pope County Courthouse Russellville, Arkansas 72801 Russellville, Arkansas 72801 Mr. Nicholas S. Reynolds Bishop, Cook, Perce11 & Reynolds 1400 L Street, N.W.
Washington, D.C.
20005-3502 Regional Administrator, Region IV U.S. Nuclear Regulatory Comission
~0ffice of EYecutive Director for Operationn 611 Ryan Plaza Drive, Suite 1000 Arlington, Texas 7K11 4
Senior Resident Inspector U.S. Nuclear Regulatory Connission f
1' Nuclear Plant Road l
Russellville, Arkansas 72801 Ms. Greta Dicus, Director Division of Environmental Health
-Protection Arkansas Department of Health 4815 West Markam Street Little Rock, Arkansas 72201 fir. Robert B. Borsum Babcock & Wilcox tluclear Power Generation Division-3 1700 Rockville Pike, Suite 5?S-Rockville, Maryland 20852 l
m
'l l