Text

-

q

~

passtyg -

/

i Nif og UNITED STATES

,,[

g-NUCLEAR REGULATORY COMMISSK N y

7

% ~

7.

t j, WASHINGTON, D C. 20666 -

s

[

May-1, 1990

^

4

.Docb. Ho. 50-368 Mr. Heil S. Carns Vice President,-Nuclear

-Arkansas Power and Light Company-P. O. Box 551 Little Rock,- Arkansas. :72203.

j!

Dear Mr. Carns:

SUBJECT:

-SAFETY' EVALUATION ON'THE ARKANSAS NUCLEAR ONE, UNIT 2

. COMPLIANCE WITH:THE-ATWS RULE, 10 CFR 50.62-DIVERSE

-EMERGENCY FEE 0 WATER ACTUATION SYSTEM'(TAC NO. 59069)

The" ATWS Rule-(10 CFR 50.62,_ "Requirem.nts for! Reduction of Risk from Anticipated y

Transients Without Scram ( ATWS) Events for. Light-Water-Cooled NuclearL Power i

Plants") requires improvements in the design and operation.of commercial nuclear

' power facilities to reduce the. likelihood.of failure to shutdown the reactor-

{

following anticipated transients, and to mitigate the consequences of an'ATWS-event.- The requirements for Combustion Engineering: plants'such as Arkansas-i Nuclear-One,: Unit'2(ANO-2)aretoprovideadiversescramsystem(DSS),

diverse auxiliary (DTT).feedwatersystem(DAFW) actuation,:anddiverse-initiation-of turbine-trip-Paragraph (c)(6) of the rule requires that information sufficient to demonstrate compliance with the requirements be submitted to NRR.

a In response to Arkansas Power and Light Company's (AP&L) submittals.~ dated 1

' November 3,(1988,' February 2,-andFebruary 21, 1989, the staff issued a safety n

evaluation SE)onJune'21,1989, addressing the.acceptabilityfof the ANO-2 DSS and DTT designst These ATWS modifications were completed during.the.last refuelingoutageforANO-2L(11/89). The final:ATWS-requirement'for this plant, DAFW or diverse emergency feedn ter actuation system (DEFAS) wasidescribed in=

AP&L's submittal to the staff dated January 15,-1990. The: staff has reviewed this information and as discussed in~the enclosed SE has' concluded that the DEFAS desfgns are acceptable'and meet the requirements of the ATWS rule.

l i

' As per yt-or January submittal, the DEFAS will be-installed during the ANO eighth refueling outage, currently scheduled to be completed in April 1991~.-

q et d

.:j

[

90051/0100 900501

  1. t PDR ADOCK 05000368

\\

/

P PDC

^

\\

1 n'

Nr. Neil S. Carns

-2 After installation,:the staff will' conduct a' review of the DEFAS software validation and verification processes and end-to-end procedures as part of an on site implementation audit..

The issuance of this SE' closes TAC No. 59069.

Sincerely, i

.4

/3l i

Chester Poslusny, Jr., Project Manager Project Directorate IV

~

Division of Reactor Projects. 11 IV,'V, and Special Projects Office of Nuclear Reactor Regulation

Enclosure:

As stated

.cc w/ enclosure:

See next page DISTRIBUTION Docket File NRC PDR Local PDR PD4 Reading G. Holahan MS 13E4 1

ADR4 F. Hebdon P. Noonan C. Poslusny i

OGC-Rockville E. Jordan MS MNBB 3701 ACRS (10) MS P-315 PD4 Plant File

-t

(>

lrt-~ :PD4/LA ~ J

- :PD4 s/

PD4/D

.....:......../'.,...:.../PM'T

...........:. 1y

~

AME~ :PNoona

CPoslusny:rc :FHeacon i

.....:....,y...........:.............:..............:..............:............................

-ATE: :04[U90-

04/q/90 0D(/I/90 1

~

3 0FFICIAL RECORD COPY Document Name: AN02 LTR/59069 f

,.1-

R

.Mr. Neil S. Carns After installation, the staff will con' duct a review of the DEFAS software validation and. verification processes and end-to.end procedures as part of an on site implementation audit.

The issuance of this SE" closes TAC Ho. 59069.

I Sincerely, j

js/

Chester Posiusny,-Jr., Project Manager.

Project Directorate IV

!f Division of Reactor Projects. III d

IV, V, and Special Projects Office <f Nuclear Reactor Regulation

Enclosure:

As stated t.

cc w/ enclosure:

d

'See next page DISTRIBUTION, RDocketillea NRC PDR Local PDR PD4 Reading i

G. Holahan MS 13E4 ADR4 F. Hebdon P. Noonan C. Poslusny OGC-Rockville E. Jordan MS MHBB 3701 ACRS (10) MS P 315 PD4 Plant File 4

l 1

0 -

0FC.

PD4/LA
PD4
PD4/0

...... :........ /).... :.../ P M \\,)

...........:. 1

CP os l u s ny : rc : FHe$

HAME ':PNoona on

......:... p...........:..............:.,............:..............:............................

DATE :04Mb90

04/ti/90
J//I/90 5

0FFICIAL RECORD COPY Of-@(

Document.Name: AN02 LTR/59069 1--__

-s:

Mr. Neil S. Carns +

After installation, the staff will conduct a review of the DEFAS software validation and verification processes and end-to-end procedures as part of r.e.

on site in.plementation audit.

The issuance of this SE closes TAC No. 59069.

I Sincerely, f

h/t hco bo i

Chester Posiusny, Jr., Project Manager Project Directorate IV Division.of Reactor Projects - III IV, V, and Special Projects 4-Office of Nuclear ReactorLRegulation

Enclosure:

As stated cc w/ enclosure:

See next page L

l l

l I

r i

f-

)

(

l 1

.i 4

0 L.-----.-- -....

+

Mr. Neil S. Carns Arkansas Power & Light Company Arkansas tiuclear One, Unit 2 Cc:

i tir. Early Ewing, General Manager Mr. Charles B. Brinkman, Manager i

Technical Suppo.t and Assessment Washington Nuclear Operations Arkansas Nuclear One Cottbustion Engineering, Inc.

P. O. Box 608.

12300 Twinbrook Parkway, Suite 330 Russellville, Arkansas ~ 72801 Rockville, Maryland P0852 Mr. Jerry Yelverton, Director Nuclear Operations Honorable Joe W. Phillips Arkansas Huclear One County Judge of Pope County P; 0.-Box 608 Pope County Courthouse Russellville, Arkansas 72801 Russellville, Arkansas 72801 Mr. Nicholas S. Reynolds Bishop, Cook, Perce11 & Reynolds 1400 L Street, N.W.

Washington, D.C.

20005-3502 Regional Administrator, Region IV U.S. Nuclear Regulatory Comission

~0ffice of EYecutive Director for Operationn 611 Ryan Plaza Drive, Suite 1000 Arlington, Texas 7K11 4

Senior Resident Inspector U.S. Nuclear Regulatory Connission f

1' Nuclear Plant Road l

Russellville, Arkansas 72801 Ms. Greta Dicus, Director Division of Environmental Health

-Protection Arkansas Department of Health 4815 West Markam Street Little Rock, Arkansas 72201 fir. Robert B. Borsum Babcock & Wilcox tluclear Power Generation Division-3 1700 Rockville Pike, Suite 5?S-Rockville, Maryland 20852 l

m