j ENCLOSURE 3 V0GTLE ELECTRIC GENERATING PLANT - UNIT 1 MONTHLY. OPERATING REPORT FOR JANUARY, 1990 TABLE OF CONTENTS 3
OPERATING DATA REPORT Page VI-2 f
1 s
l i
e i
i P-hh JK
[4 l
-R
p a
a..a~
a a
.n.-
a
+--xa-,
r
=
o w---7---
i l
t OPERATING DATA REPORT DOCKET NO. 50-424 i
I DATE: APRIL 253.1990**
C. WILLIAMS
}
COMPLETED BY:
TELEPHONE: (404) 826-4279 OPERATING STATUS
- 1. UNIT-NAME:
VEGP UNIT 1-
- 2. REPORT PERIOD:
JANUARY 90
- 3. LICENSED THERMAL POWER (MWt :
3411
- 4. NAMEPLATE RATING 1148-l-
'5. DESIGN ELECTRICAL (GROSS MWe :
RATING:JN MWe):
1101-6 MAXIMUM DEPENDABLE CAPACI?Y (GROS 5 MWe):
1133-7.~ MAXIMUM DEPENDABLE CAPACITY (NET MWe):-
1079
- 8. IF CHANGES OCCUR IN CAPACITY RATINCS l-(ITEMS.3 THROUGH 7) SINCE LAST REPORT; GIVE REASONS:
[
- 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWe):
NO RESTRICTIONS
- 10. REASONS FOR RESTRICTION, IF ANY:-
N/A THIS MONTH YR. TO DATE CUMULATIVE-
- 11. HOURS IN REPORTING PERIOD:
744 744 23425~
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL:
729.6 729.6 20017.7-
- 13. REACTOR RESERVE SHUTDOWN HOURS:-
0.0 0
'O
,~
14.-HOURS GENERATOR ON-LINE:
720.3 720.3 19490.21
- 15. UNIT-RESERVE SHUTDOWN HOURS:
0.0 0
0
- 16. GROSS' THERMAL ENERGY GENERATED
):
2374089 **
2374089 **
64362999.**
- 17. GROSS ELEC. ENERGY GENERATED 791240 791240 21342830-
- 18. NET ELEC. ENERGY GENERATED (
753590 753590 120175100
- 19. REACTOR SERVICE FACTOR 98.1%
98.1%
85.5%-
- 20. REACTOR AVAILABILITY FACTOR.
98.1%
98.1%
85.5%
- 21. UNIT SERVICE FACTOR:
96.8%
96.8%
83.2%
- 22. UNIT AVAILABILITY FACTOR:-
96.8%
96.8%
83.2%
- 23.UNITCAPACITYFACTORquSINGMDCNET):
93.9%
93.9%'
79.7%
- 24. UNIT-CAPACITY FACTOR I USING DER NET):
92.0%
92.0%
78.2%
e
~
- 25. UNIT FORCED OUTAGE RATE:
3.2%
3.2%-
10.8%
i
- 26. SHUTDOWNS SCHEDULED OVER THE NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF~EACH):
. REFUELING'-- FEB 23 -- 45 DAYS l
- 27. IF SHUTDOWN ~AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
N/A'
- REASON FOR CAPACITY CHANGE RATINGS FOR GROSS AND NET MDC WERE CHANGED AS A RESULT OF UNIT PERFORMANCE TESTING ~
COMPLETED DURING 1989..