Text
.-_
o. -
g
.
.
f
APR 2 61990
l
!
Docket Nos.
50-352
50-353
i
Philadelphia Electric Company
ATTN: Mr. C. A. McNeill, Jr.
-
-
Executive Vice President - Nuclear
'
Correspondence Control Desk
,
P_0. Box 7520
Philadelphia, Pa. 19101
,
Gentlemen:
j
SUBJECT:
REQUALIFICATION RE-EXAMINATION LIMERICK GENERATING STATION UNITS 1 -
l
AND 2 (Combined Inspection Report 50-352/90-14 (OL) and 50-
'
353/90 13 (0L))
'
!
On April 6, 1990 the NRC administered requalification re-examinations to
'
licensed operators of the Limerick Generating Station Units 1 and 2 who had
failed sections of the requalification examinations given the week of January
1
29, 1990. The examinations were conducted in accordance with NVREG-1021,
!
i
" Operator Licensing Examiner Standards," Rev. 5, section ES-601, " Administration
of NRC Requalification Program Evaluations." At the conclusion of the evaluation,
j
findings related to the preparation and administration of the requalification
examination were discussed with those members of your staff identified in-the
enclosed report.
One senior reactor operator and one reactor operator took the written portion
i
of the requalification examination. Both operators passed the re-examination.
Since only two operators were examined, this review did not constitute a
-
program evaluation and does not change any prior determination regarding the
.
unsatisfactory Limerick Generating Station requalification program. However
based on the satisfactory results, the two operators can resume performing
licensed. duties.
!
l
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of
this letter and the enclosures will be placed in the NRC Public Document Room.
,
No response to this letter is required.
Should you have any questions, please contact Mr. R. Conte, Chief, BWR
i
Section, at (215) 337-5210.
Sincerely,
Original Sisned By.1
Robert M. Gallo, Chief
Operations Branch
,
Division of Reactor Safety
0FFICIAL RECORD COPY
FLOREK/ LIM. RETAKE /4/9/90 - 0001.0,0
04/25/90
9005070257 900426
[
"
ADOCK 05000352
V
. ' ll
..
,
,
Philadelphia Electric Co.
2
.
Enclosure:
Combined Report No. 50-352/90-14 (OL) and 50-353/90-13 (OL) with Attachments
L
cc w/ enc 1:
R. J. Lees, Chairman, Nuclear Review Board
,
G. M. Leitch, Vice President - Limerick Generating Station
D. R. Helwig, Vice President - Nuclear Services
S. J. Kowalski, Vice President - Nuclear Engineering
J. W. Durham, Sr., Vice President and General Council
M. J. McCormick, Jr., Manager - Limerick Generating Station
G. A. Hunger, Jr., Director - Licensing Section
J. Doering, Project Manager - Limerick Generating Station
J. F. O'Rourke, Manager - Limerick Quality Division
T. B. Conner, Jr. , Esquire
G. J. Madsen, Regulatory Engineer - Limerick Generating Station
Public Document Room (PDR)
Local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
NRC Resident Inspector
>
Commonwealth of Pennsylvania
i
bec w/ enc 1:
Region I Docket Room (with concurrences)
Management- Assistant, DRMA (w/o enc 1)
.
R. Conte, DRS
r
D. Florek, DRS
R. Bellamy, DRSS
i
Section Chief, ORP
'
J. Dyer, EDO
/O
DRS:RIt //M/
DRS: I
D8
DRS:RI
Flore(/ajk
Conte
Q uo
Hodges
.
"
04/18 [0
044 6/90
lg04/ /90
-
0FFICIAL RECORD COPY
FLOREK/ LIM. RETAKE /4/9/90 - 0001.1.0
04/25/90