APR n5 y99 Docket Nos. 50-259, 50-260, 50-296 License Nos. DPR-33, DPR-52 DPR-68 Mr. Oliver.D. Kingsley, Jr.
Senior Vice President Nuclear Power Tennessee Y)11ey' Authority 6N 38A Les out Place 1101 Market Street Chattanooga, TN.37402-2801
Dear Mr. Kingsley:
SUBJECT:
MEETING
SUMMARY
This refers to the meeting conducted at your request 'in the NRC Region II Office on March 29, 1990.
This meeting related to activities at an NRC licensed nuclear power station and was attended by' those listed in-.
The subjects discussed at this meeting are described in the-enclosed Meeting Summary.
The meeting provided for a better. understanding of your radiological safety program and our inspection and enforcement program.
TVA representatives presented and explained radiation safety initiatives and changes; 'in-organization-structure, size, and position titles. These changes involved the Corporate and Browns - Ferry radiation safety management and supervisory structures.
In accordance with 10 CFR 2.790(a), a copy of this letter and its enclosure will be placed in the NRC Public Document Room.
Should you have any questions concerning this. matter, we will be pleased to discuss them.
Sincerely, N
. Bruce A. Wilson, Assistant Director for Inspection Programs TVA Projects Division Office of Nuclear Reactor Regulation
Enclosure:
. Meeting Summary 02 h,90040 SOD 00hh.
'O
.wve
p L
' o.
L e'.'
\\
Mr. Oliver D', Kingsley, Jr.
2-cc w/ enc 1:.
F..L..Moreadith, Vice. President Nuclear Engineering.
Tennessee Valley Authority 400 West Summit Hill Drive WT 12A 12A Knoxville, TN 37902 Dr. M. O. Medford Vice President and Nuclear Technical-Director-Tennessee Valley Authority 6N 38A-Lookout Place Chattanooga,'TN 37402-2601-Chairman, Limestone County Commission P. 0. Box 188 Athens, AL 35611-Dr. Henry Myers, Science Advisor Committee on Interior and-.
Insular Affairs U. S. House of Representatives Washington, D. C.
20515
- 0. J. Zeringue, Site Director Browns Ferry Nuclear Plant Tennessee Valley Authority P. O. Box 2000 Decatur, AL 35602 E. G. Wallace, Manager Nuclear Licensing and Regulatory Affairs Tennessee Valley Authority
.5N 157B Lookout Place Chattanooga, TN 37402-2801 P. Carier, Site Licensing Manager Browns Ferry Nuclear Plant Tennessee Valley Authority P. O. Box 2000 Decatur, AL 35602 G. Campbell, Plant Manager Browns Ferry Nuclear Plant Tennessee Valley Authority P. O., Box 2000 Decatur, AL 35602 g,,
y
.+
. -t j
Ar. Oliver D. Kingsley, Jr.
3 4
-TVA Representative Rockville Office 11921 Rockville Pike:
. Suite 402.
Rockville, MD 20852 General Counsel-Tennessee Valley Authority 400 West ~ Summit Hill Drive-ET 11B 33H-Knoxville,1N..'37902
.Claude Earl Fox, M.D.
-State Health Officer State Department of Public Health State 0ffice Building Montgomery, AL 36130 State of Alabama bec w/ enc 1:-
S. D. Ebneter, Ril' D. M. Crutchfield, NRR-B. D. Liaw, NRR S. C. Black, NRR R. C. Pierson, NRR G..E. Gears.-NRR D. Moran, NRR W. S. Little, NRR/RII J. Rutberg, OGC M. S. Callahan, GPA/CA R. H. Bernhard, NRR/Ril NRC Document Control Desk l-l.-
NRC Resident Inspector LU.S. Nuclear Regulatory Commission-Route 12,~ Box 637 Athens, AL' 35611-L R
SS R1 L-4
\\RII:DRSS RIIyW).
1 L
6tter DCo lins I d/M C.
WL{ittle; {lt 4 -
L 4/gf-/90 4/y90
[yP51sthe 4/J/90 4/j/90
. -( 3
t
4
SUMMARY
e PROGRESSIVE HEALTH PHYS lCS AND SENIOR MANAGEMENT e DEDICATED RADCON STAFF DlilDED INTO FOUR SPECIALIZED i
DISOIPLINES
!{
i e VAST JMPROVEMENT IN THE OVERALL RADCON PROGRAM o PROCEDURES ll o EQUIPMENT o TRAINING l
l e POSITIVE PERFORMANCE INDICATORS e NUMEROUS INPO GOOD PRACTICES AWARDED r
s AGGRESSIVE 199D THROUGH 1994 GOALS
{
THE RADCON ORGANIZATION HAS DEVELOPED INTO A I
PROACTIVE, GOAL-ORIENTED, AND EFFICIENT GROUP THAT IS INTEGRATED INTO THE OVERALL BFN TEAM, RADCON MANAGEMENT'S PROACTIVE POSITION CONTINUES i
TO STRIVE FOR SUPERIOR PERFORMANCE IN RADIOLOGICAL l
l I
SAFETY.
I l
!l RADCON'S GOAL IS TO BECOME THE LEADER IN NUCLEAR POWER PLANT HEALTH PHYSICS.
!i l
[.2.;
J l
1 i
/
l i
I TENNESSEE VALLEY AUTHOR::0Y j
1 l
l i
l i
BROWNS FERRY NUCLEAR PLANT I
RAD;:0 LOG" CAL CONTRO:LS l
l PROGRAM 1
h b
B F#
l 1
A 4.
e...b#. W; i1 A
i l
\\
l
.,y, 3
.=
we-i
)
I.
l.
r-- - -
WEETING OF TVA BROWNS FERRf NUCLEAR PLAM AND CORP 00. ATE RADIOLOGICAL CONTROL MANAGEWEM WTTH REGION 2 NRC MANAGEMENT DATE: THURSDAY, MARCH 29,1990 LOCATION: ATLAMA GEORGIA AGENDA
- 1. ORGANIZATIONAL STRUCTURE
- 2. RADCON GOALS
- 3. INPO GOOD PRACTICES 4.
IMPROVEMENTS, WMOR ACCOMPLISHWEWS, AND PERFORMANCE INDICATORS
- 5. SUWWARY AND OPEN DISCUSSION.
ATTENDEES:
J. W. Corey, Browns Ferry, Radiological Control Superintendent J. A. Flonigon, Corporate S. G. Bugg, Browne Ferry, Rodwoote Monoger C. G. Hudson, Corporate J. D. Wilner, Browne Ferry, Rodlological Health Shift Supervloor C. B. Mitchell, Browns Ferry, Radiological Field Operotlone Shift Superdoor.
L J. Rioles, Corporate F. S. Teokeres, Browns Ferry, Radiological Protection Monoger Mr. John Potter and etaff, NRC, Region 2 O
4
{
-'ww%-
ye g
j
(
.c c.
!c BFN RADCON PROGRAM-PRESENTATION a ORGANIZATIONAL STRUCTURE l-a RADCON GOALS
}
i e INPO GOOD-PRACTICES i
I a IMPROVEMENTS, MAJOR ACCOMPLISHMENTS AND i
PERFORMANCE INDICATORS l
l i
o RADIATION PROTECTION /ALARA j
i
- STATION DOSE I
I
- SKIN AND CLOTHING CONTAMINATIONS -
l l
l o FIELD OPERATIONS
)
i
- RADIOLOGICAL INCIDENT REPORTS o RADWASTE
.i i
- LOW LEVEL RADWASTE
- CONTAMINATED SQUARE FOOTAGE
-1 o RESPIRATORY PROTECTION o DOSIMETRY l
- POSITIVE WHOLE BODY COUNTS o INSTRUMENTATION j
o TRAINING
- i. !
O PM SUPPORT I
'I o ADEQUATE WORKING ENVIRONMENT i
s
SUMMARY
!+
_ _. _. - _J J
c.
1 1
l ORGANIZATIONAL STRUCTURE m DEDICATED RADIOLOGICAL HEALTH.AND RADIATION l.
i PROTECTION MANAGERS ii e
8 4
- a ALARA ENGINEERING STAFF ADDED.
j,!
I i
s RADCON STAFFED WITH PERMANENT PERSONNEL
. i. ':
L INSTEAD OF CONTACTORS i
a DEDICATED RADIATION PROTECTION GROUP TO ADDRESS SPECIFIC EXPOSURE REDUCTION METHODS
];
o CHEMICAL DECONTAMINATION o SOURCE TERM REDUCTION o COBALT EUMINATION m NUMBER OF QUALIFIED DOS' METRY TECHNICIANS INCREASED FROM 5 TO 10 o ALLOWS FOR 24HR/ DAY PLANT SUPPORT l
i a DEDICATED GROUP FOR REVIE'A OF SURVEY AND RWP DOCUMENTATION
\\
i E
l
.i
- i 1
l 1
e I
i r
5 s
I M
F T
P'
~~
RADIOLOGICAL CONTROL
~
ORGANIZATION RADIOLOGICAL CONTROL SUPERINTENDENT
~
J. M. COREY s
FDDE RAD WASTE f
RADIGIAGICAL RADIGIAGICAL GROUP OPERATIONS PROTECTION -
HEALTH MANAGER MANAGER MANAGER-MANAGER S.G.BUGG E. MASTICH F.S.TSAKERES R. H. AIBRIGHT I-I TECHNICAL RAD HEALTH FIEIR OPS MANAGERS' SHIFT SUPV.
SHIFT SUPV.
RADWASTE RADWASTE
~
L WASHINGTON M. J. nazar.
SUPERVISOR CONTROI2JtR
.S.R.HOWARD T'
~ ~
. f M.~ L ERGdONS P. I BYRD T&L (12)
G. V. ENIGHT R. W.' SIMPEINS I
J. D. MiLNER W. CUNNINGHAM 1
-. VACANT R.A.BBCE
[
D.G.B0HIENDER D. J. BEERS l
C. B. BETCHEIL F. J. SP1VEY SB (8) _ SE (24)
C. WAlleCE SUP R
H. E.1N l
R..L COIRMAN T&L (20)
I VACANT y, g, gg
. sc (7) sE(so)-
.=.
y I
RADCON GOALS e OVERALL GOALS o HEALTH PHYSICS LEADER OF THE NUCLEAR POWER i
INDUSTRY j
l-o ACHIEVE AND MAINTAIN A CATEGORY 1.SALP RATING I
! [l l
e 1990 GOALS o COLLECTIVE BFN RADIATION EXPOSURE.OF LESS THAN I
OR EQUAL TO 710 MAN-REM o TOTAL SKIN AND CLOTHING CONTAMINATIONS LESS THAN I
OR EQUAL TO 250 l
o O POSITIVE WBCs GREATER THAN INPO REPORTING LEVEL 1 o O POSITIVE WBCs GREATER THAN INPO REPORTING LEVEL 2 j
o REDUCE TOTAL-PLANT CONTAMINATED SQUARE FOOTAGE f
^
TO 5 PERCENT.
o MAXIMUM OF 710 CUBIC METERS DRY ACTIVE WASTE PER
! l YEAR l
o TOTAL RADIOLOGICAL INCIDENT REPORTS (RlRs). AGAINST BFN OF LESS THAN OR EQUAL TO 135 o NO LEVEL I,11, OR lli NRC VIOLATIONS o MAXIMUM OF 5 LERs o COMPLETE ALL-NRC AND INPO COMMITMENTS ON TIME I
o PROVIDE TIMELY AND TECHNICALLY APPROPRIATE RESPONSES TO FSAR CHANGES, BFN PERFORMANCE PLAN, LERs, SERs, SOERs, AND OPERATIONAL READINESS
-I o PROVIDE SUPPORT TO RADIOLOGICAL EMERGENCY j
PREPAREDNESS (REP) SUCH THAT 0 DEVIATIONS j
l ATTRIBUTABLE TO PERSONNEL ERROR OCCUR l
~~
_.I '
~
@/
t INPO GOOD PRACTICES a1984 o COLLECTIVE RADIATION EXPOSURE SAVINGS ON MMOR JOBS DOCUMENTED FOR FUTURE USE o DIRECT INVOLVEMENT IN ALARA PROGRAM BY' ALL PLANT DEPARTMENTS
- 0 ANNUAL ALARA SUMMARIES USED TO MEASURE ALARA PROGRAM EFFECTIVENESS o REAL TIME SYSTEM DEVELOPED TO CONTROL RADIOLOGICAL INSTRUMENTATION i
o CONTAMINATION CONTAINMENT DEVICES AND EFFECTIVE DECONTAMINATION MINIMlZE SPREAD OF CONTAMINATION u ;985 3
o THERE WAS NO INPO EVALUATION DURING 1985 a1986 4
o COMPRHENSIVE DRYWELL SHIELDING PACKAGE.
- RECIRCULATION SYSTEM
- RESIDUAL HEAT REMOVAL SYSTEM
- REACTOR WATER CLEANUP SYSTEM
- CORE SPRAY SYSTEM
- CONTROL ROD DRIVE SYSTEM SCRAM HEADER
- 40% EXPOSURE SAVINGS 9
3.-
- ese w>
.en-4 3
- p, - -...
e C
l c.
g L.
INPO GOOD PRACTICES i
a 1987 o SEVERAL INNOVATIVE PROGRAMS CONTRIBUTE TO L
l REDUCED EXPOSURES AND REDUCED CONTAMINATION
' SPREAD
- 6 RWCU PUMPS DECONTAMINATED
-INNOVATNE SHIELDING AND CONTAM! NATION CONTAINMENTS USED DURING SAFE END REPLACEMENT
- OUARTERLY ISOTOPIC ANALYSIS TO TREND ISOTOPE DISTRIBlmON TO INDICATE IMPACT OF CHANGING PLANT PARAMETERS -
f
- CONTROL ROD ORIVE (CRD) FLUSH TANK IMPROVES RADIOLOGICAL CONDITIONS DURING CRD REBUILD
[
e1988 o IMPACTION AIR SAMPLING TO SEPARATE STATION AIRBORNE ALPHA RADIOACTMTY FROM NATURALLY OCCURING ALPHA RADIOACTMTY a1989 1
o MOBILE AIR COMPRESSOR USED TO SUPPLY BREATHING
' AIR FOR RADIOLOGICAL WORKERS
- BREATHING AIR FOR AIR FED HOODS AND AlRUNE -
RESPIRATORS
- EUMINATES OROSS CONTAMINATION CONCERNS
- 4500k! RECENER TANK ALLOWS AMPLE TIME TO SAFELY L
EXIT WORK AREAS ON LOSS OF POWER l
l j
i a
-4
.J
=4 RADIATION PROTECTION /ALARA IMPROVEMENTS y
a ENHANCED ALARA REVIEW COMMITTEE TO INCLUDE RADWASTE PROGRAM o MEMBERSHIP EXPANDED TO INCLUDE MAJOR SITE l..I ORGANIZATONS I
a DEVELOPED ALARA-DATA BASE TO TRACK ALL RADIATION
!I, WORK PERMIT (RWP) EXPOSUR:. -
[j
{
i e ENHANCED ALARA PREJOB PLANNING.
i r
i o EXTENSIVE PREPLANNING OF JOBS >1 MAN-REM o ALARA PLANNING ANNOTATED ON ALL RWPs -
l e INSTALLED TEMPORARY SH;ELDING PACKAGES o UNITS 1, 2, AND 3 DRYWELLS
- I o FUEL POOL COOUNG HEAT EXCHANGERS-i i
o FUEL POOL COOUNG SYSTEM PIPING l
~
l o RECIRCULATION SYSTEM SAFE END REPLACEMENT I
e TEMPORARY SHIELDING PROGRAM ENABLES INDMDUAL j'
WORKERS TO REQUEST SHIELDING a CHEMICALLY DECONTAMINATED REACTOR WATER CLEAN UP PUMPS
{
e DEVELOPED COMPUTERIZED DATA BASES:
o TRACKING AND TRENDING PERSONNEL CONTAMINATION I
EVENTS o TRACKING AND IMPLEMENTATION OF ALARA SUGGESTIONS l
- SKMFTANT CUWUt.ATNE DOSE SAVINGS l
e DECREASED CONTRACTOR ALLOWABLE DOSE TO 5 REM /YR
,_,. a i
BROWNS FERRY NUCLEAR PLANT PERSON-REM EXPOSURE 1985 THROUGH 1989 1080.3 1052.1 1,200 1,100 992.7
./
y
,000
'.~'
i 1
.r e
900 g
Z 800 l-
~
l l;
g 519.9
'^
O 600
~
^
CD soo Z
g 400
~
~
k 4
300 1
133,4
'4 i
200 3,
1
'E#
100 j
l 0
1985 1986 1987 1988 1989 1990 YEAR CALENDAR YEAR EXPOSURE ALARA 1990 1990 DATA THROUGH 2/90 BFNRTB90 MGS U
~
BROWNS FERRY NUCLEAR PLANT PERSONNEL CONTAMINATION REPORTS 1985 THROUGH 1989 500 400 g
0 AL. 300 243 A
168 M
200 147 i
H 100 8
o-1985 1986 1987 1988 1989 1990 YEAR CALENDAR YEAR DATA Al ARA 1990 1990 DATA THROUGH 2/90 PCRTB90 ucs
1 FIELD OPERATIONS IMPROVEMENTS j
e IMPROVED CONTAMINATION CONTROL METHODS
-[
o USE OF CONTAINMENT DEVICES o SOLID BARRIERS AROUND CONTAMINATED AREAS j
j.
e IMPLEMENTED A TRANSURANICS PROGRAM (SURVEILLANCE AND CONTROL)
]
!i e IMPLEMENTED BY-PRODUCT MATERIAL CONTROL I
i PROGRAM e PROCEDURALIZED CONTROL AND DOP TESTING OF l
PORTABLE HEPAs AND VACUUM CLEANERS e IMPLEMENTED REMOTE MONITORING EOUIPMENT l
o COMMUNICATIONS o TELEDOSE l
l l
0 VIDEO e ESTABLISHED PROCEDURES TO CONTROL NUMBER AND LOCATION OF RADIOACTIVE MATERIAL AREAS g
e ONSITE ENVIRONMENTAL MONITORING PROGRAM e ACCOUNTABLE WORK FORCE - NO CONTRACT TECHNICANS (CURRENTLY) l i.
a
BROWNS FERRY NUCLEAR PLANT RADIOLOGICAL INCIDENT REPORTS 1985 THROUGH 1989 400
]300 b
A 200
'g 4g l3l l
0H 82 100 62e 54 1985 1986 1987 1988 1989 1990 YEAR CALENDAR YEAR DATA ALARA 1990 1990 DATA THROUGH 2/90 RIRTB90 MGS
.=
RADWASTE IMPROVEMENTS a SOLID-RADWASTE REDUCTION o REDUCED THE VOLUME OF RADWASTE IN STORAGE l
\\
o REPLACED DRUM COMPACTOR TO ACHIEVE HIGHER COMPACTION DENSITIES o IMPLEMENTED USE OF REUSEABLE SCAFFOLDING i
o IMPLEMENTED A BULK MATERIAL PERMIT PROGRAM j
r o REPLACED SEVERAL DISPOSABLE ITEMS WITH REUSEABLE i
ITEMS ~
j
- COKTAMINADON ZONE CLOTHING (BOOBES)
- MATERIAL TRANSFER BAGS l
o EXPANDED TOOL ROOM CONTROL OF REUSEABLE ITEMS i
- HOSES l
- TEMPORARY ELECTRICAL CABLES I
- WELDING LEADS i
o IMPLEMENTED USAGE OF IMPROVED AND INCINERABLE MATERIALS a WATER PROCESSING EFFECIENCY IMPROVEMENTS o ULTRA FINE FILTERS o RESIN DEWATERING EQUIPMENT o STATION SUMP CLEAN OUT.
J o DEDICATED PROCESSING STAFF o CHEMICAL TRAFFIC CONTROL - DETERGENT CONTROL l
o INLEAKAGE REDUCTION PROGRAM
{j
- GROUNDWATER INLEAKAGE l
- EQUIPMENT / SYSTEM INLEAKAGE
[5
_ _- { }
._ J
~
BROWXS FERRY NUCLEAR PLANT Volume Low Level Radwaste Shipped 4000
~
Sliding Total
~
3600
- ..o-----
.a.
..:........c..
..:....:... i
.l... 3 3200
[
..i..+....i..
..A..
..j...-..
..3, 2800
~
>
- i-
- i--
.i...
..... >....i...i..
.3.
(/)
L i
g 2400 x-a-
1
.q)
{
a 1
E A,
.e..
e..
^
2000. _.
U si i
_O 1500
. ;... A 4....>.
.. g.. A.a....
..i.. ;
.z..
3 a:
4
~
()
[
.[
i a-i ami a5a
--:- - - 5 ^ - - -
i ^
- 5 1200 l - l-4 4..
. i... A..., 4....
..A.
.A..
..A.,.-.:
}
[
',aL
-. a.
l
.L.
300 ta ata,A,
- 4a
...g...>..
i a
Eggggggggggg3 yA ggyg3. g p-y p2 g p-y
-\\
O t
2 3
A t
2 3
A t
2 t
A 3
y g
' Sliding 12 Month Totals (Janq85 - Feb190)
. RvSALP.01-Dato points represent the total volume sh.ipped during the proceeding 12 months.
_ _ _... _ ~ _
. ~..-..... -
s s
L
- 3 3
BROWNS FERRY NUCLEAR PLANT l
BWR Industry Average vs Browns Ferry
}
Volume Low Level Radwaste Shipped
-l 1600 E5""^r*
l f
.{
1400 4
$y I
BFN Actual N
[
per Unit 1200 Nk m
h ~*" i s
A 800
,f U
, ) \\
S soo
~
k\\
o yN 9
9?
s 400
\\ __ ; f 1963 1964
-1995 1996 1967 1968 1969 Volume. Per. Unit (1983 Thru 1989) l-BWR Average Per Unit Provided BY INPO
.._, n _
. ~..
0 BROWXS FERRY NUCLEAR PLANT Radwaste Average Monthly Inleakage Runnmg Average 120
~
=-
~-
-~e-
- c. ~ e --
110 s-
-~
v-
-c-
- e ~ t:-~
o
..:..... :....q.... 5..
~
300
..:..,i.,...,,
a.
.. 3....:..
..c..
g 90
.c.
e
..i....
- 3 a
-c.
e-c-
80
. +. -. '..
.....i.....
. A.....;..
- +
3E c.
+
+-
v e..
-w.
70
-~~
~ _:
g_
60
.v.,....:.....:.......
O
[L
. i..... :...
. ~
......a..
~
~
1--
l-
-4 U) 50
~ -
g
~~
_O
^
-.. :..... s.., v... ! !. i..*. :..... :..... c..,. i..
. ~ !., :
40 '_.. :.....:...
.~
O
.4.............
..4..
O 30
-t-
- t. - -+-- -
4 20
.t - -+- --<-
a-
-t--
c~ ~ s. -~
~. -
. '. * ~
+
~
~'
- ~-
--r--="
~~
v-
-e-c*
~~
-v~
~: ~ ~.
10 v~---
-~
o g g gA g' 2
3 t
A g2 g3_gA g1 g2 g3)A g\\g2 g3 gA g1 g2)3 gAgt Sliding Monthly Average (Jan 85 - Feb 90)-
. M SeL/W.fi i
Dato points are the overage rnonthly I
inlookoge for the proceeding year.
'N*"i
1 BROWNS FERRY NUCLEAR PLANT CONTAMINATED AREA. SQUARE FOOTAGE o
1986 THROUGH 1989 E-<
16 -
O 15 -
O 14 -
12.2 4
13 -
11.2 11,0 10.5 g
12 -
Z 11 -
4 10 -
7.4 D
9-7 8-2 1 -
4 1986 1987 1988 1969 1990 YEAR TOTAL PLANT SQUARE FOOTAGE = 910.480 FT2 ALARA 1990 DATA INDICATES END OF YEAR TOTALS CZONTB90 1990 DATA THROUGH 2/90 MGS
I RESPIRATORY PROTECTION IMPROVEMENTS L
e IMPLEMENTED PROGRAM TO CONTROL ISSUANCE, INVENTORY, AND MAINTENANCE OF RESPIRATORY EOUIPMENT e IMPLEMENTED DEDICATED TRAINING FOR RESPIRATORY j
PROTECTION USEPS I
I a UPGRADED MEDICAL EXAM REQUIREMENTS FOR SCBA USE a UPGRADED MASK FIT TESTING PROGRAM t
e IMPLEMENTED COMPREHENSIVE RESPIRATORY TESTING PROCEDURES AND QUALITY ASSURANCE PROVISIONS e IMPLEMENTED DOP AEROSOL TESTING OF RESPIRATORS L
AND FILTER CARTRIDGES a PERFORM MONTHLY BIOASSAYS (IN VIVO AND IN VITRO) TO EVALAUTE RESPIRATORY PROTECTION PROGRAM EFFECTIVENESS e RESPIRATORY PROTECTION PROGRAM ENHANCED TO MEET RECOMMENDATIONS OF ANSI Z88.10 m IMPLEMENTED COMPREHENSIVE PROGRAM OF QUALIFICATION TRACKING FOR ASBESTOS WORKERS e INCREASED THE AVAILABILITY OF RESPIRATORY PROTECTIVE DEVICES e IMPLEMENTED DEDICATED PORTABLE BREATHING AIR COMPRESSORS FOR SUPPLIED AIR USE-AND FOR FILLING l
l SCBA UNITS l
a l
q-l I
w
~
DOSIMETRY IMPROVEMENTS s DOSE TRACKING o UPRGRADED NRC FORM 4 PROGRAM o DEVELOPED PROGRAM.TO ASSESS AND TRACK SKIN DOSE FROM PERSONNEL CONTAMINATION EVENTS o IMPLEMENTED REAL-TIME POCKET CHAMBER UPDATE PROGRAM-IMPROVED PERSONNEL EXPOSURE INFORMATION AVAILABILITY l
0 IMPROVED EMPLOYEE TERMINATION NOTICE PROCESG I
o ESTABLISHED BETTER CONTROL OF INITIAL DOSIMETRY ISSUE o ESTABLISHED ON-SITE TLD PROCESSING AND IRRADIATION
- CAPABILITY a EXTERNAL DOSIMETRY IMPROVEMENTS l
o ESTABLISHED AND MAINTAINED TVA JOINT NVLAP ACCREDITATION o ESTABLISHED AND MAINTAINED COMPLIANCE WITH TVA TLD MEASUREMENT QUALITY ASSURANCE PROGRAM (MQA) o IMPLEMENTED PANASONIC DOSIMETRY SYSTEM o PROVIDED DEDICATED FACILITIES TO HOUSE EXTERNAL DOSIMETRY, WHOLE BODY COUNTING, RESPIRATOR FIT TESTING, AND PERSONNEL INPROCESSING o ESTABLISHED AND MAINTAINED ON-SITE DOSIMETRY PROCESSING SERVICES o ESTABUSHED AND MAINTAINED MULTIPLE TLD WHOLE BODY MONITORING PROGRAM
_)
o
..0
'o o.
DOSIMETRY. IMPROVEMENTS (CONT) e 810 ASSAY.
[
o INSTALLED CANBERRA WHOLE BODY COUNTING SYSTEM
- 2 FASTSCANS
- 1 THREE-DETECTOR CHAIR o ESTABUSHED A MECHANISM TO ASSESS UPTAKES OF TRANSURANIC RADIONUCUDES l
o ESTABLISHED FORMAL TRENDING FOR NON-ROUTINE WHOLE BODY COUNTS o FORMAUZED METHODOLOGIES FOR CALCUl.ATING INTERNAL DOSE EQUIVALENTS AND MPC-H BASE UPON
_ BIOASSAY _RESULTS e POSITIVE WHOLE BODY COUNTS-o 1 POSITIVE WHOLE BODY COUNT, DURING THE PERIOD 1985-1989, ABOVE ANSI N343 ACTION LEVEL I (GREATER THAN 5% MPOB) rq -
o
.._ d
l l
INSTRUMENTATION IMPROVEMENTS l
, 's INSTALLED NNC BETAMAX UNIT FOR WHOLE BODY FRISKING
-o VARIOUS IN-PLANT LOCATIONS t
o RCA EXIT POINTS a INSTALLED TOOL CONTAMINATION MONITORS AT RCA i
EXITS a IMPROVED RESPONSE CHECK TECHNIQUES FOR FRISKERS a PURCHASED VARIOUS INSTRUMENTS TO ENHANCE ALPHA ASSESSMENT CAPABILITIES l
a PURCHASED AND IN PROCESS OF INSTALLING UPGRADED CAMS a IMPLEMENTED A PROGRAM TO CONTROL' ISSUANCE,-
INVENTORY, AND MAINTENANCE-OF PADCON' INSTRUMENTATION a PROCURED VARIOUS SOURCES FOR IMPROVED INSTRUMENT RESPONSE CHECK CAPABILITIES a IMPROVED REPORTING OUT OF TOLERANCE CONDITIONS ON INSTRUMENTS WHICH Fall RESPONSE CHECKS i
a STANDARDIZED FIELD EQUIPMENT FOR COUNTING SMEARS AND AIR SAMPLES
)-3 INSTRUMENTATION IMPROVEMENTS (CONT) i i
e PURCHASED BETA EXTRAPOLATION CHAMBERS AND VICTOREEN R-CHAMBERS TO PROPERLY QUANTIFY l
SOURCES AND RADlATION FlELDS a INCREASED NUMBER OF INSTRUMENTS RESERVED FOR-i RADIOLOGICAL EMERGENCY REPONSE (REP) CONDITIONS I
a IMPLEMENTED USE OF DECONTAMINATION EQUIPMENT FOR PORTABLE INSTRUMENTS e INSTALLED UN-INTERRUPTABLE POWER SUPPUES ON l
MAJOR EQUIPMENT 1
i I
j i
2J F1
.- _j t
.______--_----_:-)
'c:
i TRAINING IMPROVEMENTS-a RADCON GET LEVEL 11 NOW INCLUDES PRACTICAL FACTORS L
o DON AND' REMOVE PROTECTIVE CLOTHING o SIMULATED WORK IN A CONTAMINATED AREA s FORMAL RADCON TECHNICIAN TRAINING PROGRAMS RECEIVED INPO ACCREDITATION o FIELD OPERATIONS o DOSIMETRY o INSTRUMENTATION / RESPIRATORY PROTECTION 1.
s ALARA AWARENESS TRAINING (AAT) o SIX TRAINING MODULES
~
- RWPs
- EXPOSURE CONTROL
- RADIOLOGICAL SURVEY MAP READING r
- DECONTAMINATION
- CONTAMINATION CONTROL
- CONTAMINATION CONTAINMENT CONSTRUCTION AND t.mUZATION O MOCKUP FACIUTY
- REAUSTIC Pl. ANT ENVIRONEMENT
- RADIOLOGICAL CONDmONS AND ANOMOUES l
w I
J l
j,
- ., s...
e TRAINING IMPROVEMENTS (CONT) a SHIFT SUPERVISORS AND ENGINEERING STAFF QUALIFIED AS INPO CERTIFIED INSTRUCTORS
{'
s IMPLEMENTED MOCKUP TRAINING FOR HIGH EXPOSURE JOBS o U-2 RECIRCULATION SYSTEM NOZZLE REPLACEMENT o U-2 REACTOR VESSEL DRAIN UNE MODIFICATIONS
}
o U-2 CRD SEISMIC SUPPORTS WORK e JOS/ TASK EVALUATIONS DEVELOPED FOR ANSI 18.1 RADCON TECHNICIAN DUTY AREAS i
I o DETERMINES TRAINING NEEDS e IMPROVED EMPLOYEE NOTIFICATION OF IMPENDING' QUALIFICATIONS EXPlRATION l
o DATA BASES COMBINED I
- innNm
- WEDCAL l
- HEALTH PHYS 3CS DOSE TRACKING e NATIONAL REGISTRY OF-RADIATION PROTECTION
'l TECHNOLOGISTS o PERSONNEL ARE ENCOURAGED TO ACHIEVE REGISTRY o MANAGEMENT ACTNELY SUPPORTS REGISTRY l
l
- SPECIAL ARRANGEWENTS FOR TRAINING L
o 11 PERSONNEL REGISTERED l
...J i
.