ML20042E036

From kanterella
Jump to navigation Jump to search
Amend 75 to License NPF-15,revising Surveillance Requirement 4.8.1.1.2.d of Tech Spec 3/4.8.1 Re Ac Sources That Require Certain Maint & Testing Activities Be Performed
ML20042E036
Person / Time
Site: San Onofre 
Issue date: 04/09/1990
From: Trammell C
Office of Nuclear Reactor Regulation
To:
Shared Package
ML20042E037 List:
References
NUDOCS 9004190065
Download: ML20042E036 (15)


Text

._

o UNITED $TATES

~ ~,

NUCLEAR REGULATORY COMMISSION i

i wAssmorow. o. c. rosss

\\,...../

?

SOUTHERN CALIFORNIA EDISON COMPANY SAN DIEGO GAS AND ELECTRIC COMPANY THE CITY OF RIVERSIDE, CALIFORNIA THE CITY OF ANAHEIM, CALIFORNIA I

DOCKET NO. 50-362 SAN ONOFRE NUCLEAR GENERATING STATION, UNIT NO. 3 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No.75 License No. NPF-15 1.

TheNuclearRegulatoryCommission(theCommission)hasfoundthat:

A.

The application for amendment to the license for San Onofre Nuclear Generating Station, Unit 3 (the facility) filed by Southern California Edison Company (SCE) on behalf of itself and San Diego Gas and Electric Company, the City of Riverside, California and the City of Anaheim, California (licensees) dated February 12, 1990 complies with the standards.and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's regulations set forth in 10 CFR Chapter I; B.

The facility will operate in conformity with the appli-cation, the provisions of the Act, and the regulations of the Commission; C.

There is reasonable assurance (1) thatothe activities author-ized by this amendment can be conducted without endangering the health and safety of the public, and (ii)-that such activities will be conducted in compliance with the Consnission's regulations; D.

The issuance of this amendment will not be inimical to the l

common defense and security or to the health and safety of i

the public; and E.

The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.

80

$O0bk bbb

$2

j..

2 I

2.

Accordingly, the license is amended by changes to the Technical Speci-fications as indicated in the attachnent to this license amendment, and paragraph 2.C(2) of Fecility Operating License No. NPF-15 is hereby amended to read as follows:

(2) Technical Specifications The Technical Specifications contained in Appendix A, and the Environmental Protection Plan contained in Appendix B, as revised through Amendment No. 75, are hereby incorporated in the license.

SCE shall operate the facility in accordance with the Technical Specifications and the Environmental ~

Protection Plan.

3.

This license anendment is effective as of the date of its issuance and h

must be fully implemented no later than 30 days from the date of issuance.

FOR THE NUCLEAR REGULATORY COMMIS$10N a{.lo ll.'.Wsogb TT Charles M. Tramell III, Acting Director Project Directorate V Division of Reactor Projects - 111, IV, Y and Special Projects Office of Nuclear Reactor Regulaticn

Attachment:

Changes to the Technical Specifications Date of Issuance: April 9, 1990

4.

'j.

ATTACHMENT TO LICENSE AMENDMENT NO. 75 FACILITY OPERATING LICENSE NO. NPF-15 DOCKET NO. 50-362 Revise Appendix A Technical Specifications by removing the pages identified below and inserting the enclosed paga. The revised page is identified by amendment number and contain marginal lines indicating the area of change.

Also enclosed is the following overleaf page to the amended page.

AMENDMENT PAGE OVERLEAF PAGE 3/4 8-3 3/4 8-4 t

?

~.

e

t 3..

ELECTRICAL POWER SYSTEM SURVEILLANCE REQUIREMENTS (Continued)

S.

Verifying the generator is synchronized, loaded to greater than or equal to 4700 kW in less than or equal to 77 seconds *, and operates with a load greater than or equal to 4700 kW for at i

least an additional 60 minutes, and.

6.

Verifying'the diesel generator is aligned to provide standby P

power to the associated emergency busses, b.

At least'once per 31 days and after each operation of the diesel I

where the period of operation was greater than or equal to I hour by i

checking for and removing aceumulated water from the day tank.

c.1. At least once per 92 days and from new fuel prior to addition to the storage tanks by verifying-that a sample obtained in accordance with ASTM-D4057-81 has a water and sediment content of less than or equal to.05. volume percent and a kinematic viscosity 9 40'C of greater than or equal to 1.9 but less than or equal to 4.1 when tested in accordance with ASTM-0975-81.

2. At least once every 92 days by obtaining a sample of fuel oil in accordance with' ASTM-D4057-81 and verifying that particulate con-tamination is -less than 10mg/ liter when checked in accordance with ASTM D2276-83, Method A.

d.

At least once per refueling interval ** (the provisions of Technical Specification 4.0.2 are not applicable) by:

1.

Subjecting the diesel to an inspection in accordance with procedures prepared in conjunction with its manufacturer's recommendations for this class of standby service.

2.

Verifying the generator capability to reject a load of greater than or equal to 655.7 kW while maintaining voltage at 4360 + 436 volts and frequency at 60 + 6.0 Hz.'

3.

Verifying the generator capability to reject a load of 4700 kW without tripping.

The generator voltage shall not exceed 5450 volts during and following the load rejection.

  • All engine starts for the purpose of this surveillance testing may be pre-ceded by an engine prelube period and/or other warmup procedures recommended by the manufacturer so that mechanical stress and wear on the diesel engine l

l is minimized.

l

    • For Cycle 4 only, this surveillance interval may exceed the 24-month refueling i

interval but may not exceed 25 months, t

l SAN ONOFRE-UNIT 3 3/4 8-3 AMENDMENT NO. 75

. _. _ _ _ _. _ _. ~ _ _._ _

]

i

[;t:*r::a; p0vt sys*!ws 1

i

$Uh!:;;aw:t atoe:erutw s ( e tinyee) i I

4, Simwisting a loss of offsite power by itself, and a)

Verifying de energitation of the emergency busses anc icac sheeting from the emergency busses.

b)

Verifying the. diesel starts en the auto start signal energites the emergency busses.with persanently conne,:tec j

loses within 30 secones and operates for greater than c' etwal to 5 minwtes while its permanently connected loess. generator is leases with the After energitation, the steasy state voltage and frecuency of the emergency tusses snall be saintaines at 4HO a 4M volts ane 60 a 1.2 e:

outing this test.

Ye'ifying that on an ($F test signal, without loss of of f site' pe=er, the eiesel generator starts en the auto start signal anc omiies on standoy for greater than er eewel to 5 minutes.

The stency state generator voltage and frecuency shall be 4360 t 416 volts one 60 a 1.2 Mt within 10 seconds after the i

aute start signal; the generater voltage and frecency shall te maintainec within these limits during this test.

6.

Deletet 7.

Simuisting a loss of offsite power in conjunction with an ESF test signal, and a)

Verifying ee energitation of the energency busses and 1cac

)

shescing from the energency busses.

b)

Verifying'the diesel. starts on the auto start signal, energites the emergency busses with permanently conne:tec loses within 10 seconds, energites the auto connectee emergency (accident) leads through the load seguence and operates for greater than er equal to 5 minutes while its j)eneratorisloadedwiththeesePgencyleads. After-casing, the stency state voltage and frequency of the emergency busses shall be asiatained-at 4HO a 4M volts and 60 + 1.2/ 0.3 Ha during this test, c)

Verifying that all automatic diesel generator trips, excect enjjine overspeed, generator differential, and low-low 1wbe ci pressure, tre automatically bypassed.

i t

$AN ONDFRE UNIT 3 3/4 g 4 AM[Nl MINT NO. 48

.. -.,. ~.. -,,...,. - -. -.....,

.,n,.,..,

m..,,,,,,.,.

,,w

.,r.,,

=,.,-.,,,nw,_,.,

-~

q p

TABLE 4.3-2 (Contimsed]

ENGINEERED SAFETY FEATURE ACTUATION SYSTEM INSTRepIENTATION SURVEILtNEE !!E;

.o 5

~

'm7 CNA881El MOES FOR %#1ICM -

~

CNANNEL CHANNEL FUNCTIONAL SURVEILLANCE

.l E

FUNCTIONAL UNIT q

_ CHECK CALIBRATION TEST

_ 15 REqWIRED l

1

11. FUEL HANDLING ISOLATION (FMIS) a.

Manual (Trip Buttons)

M.A.

M.A.

R N. A.

b.

Airborne Radiation

i. Gaseous S

R M

1

11. Particulate / Iodine 5

R M

c.

Automatic Actuation Logic M.A.

N.A.

R(3)

12. CONTAINMENT PURGE ISOLATION (CPIS) a.

Manual (Trip Buttons)

M.A.

N.A.

(5)

N. A.

l i

b.

Airborne Radiation i.

Gaseous S

(6)

M 1.2.3,4,5 t*

ii. Particulate W

(6)

M 1.2.3.4.5 i

iii. Iodine W

(6)

M Y'

c.

Containment Area Radiatten 5

(Gamma) s m

M 2.2.3..,6 I

i d.

Amtematic Actestion Logic N.A.

N. A. ~

(3), (6) 1,2,3,4,5 i

TABLE IIOTATION (1)

Each train er logic channel shall be tested at least every 52 days en a STmcram TEST htSIS.

(2) Deleted.

(3) Testing of Aetematic Actuation Logic shall include energfratten/de-energinetten of each inttfatten relay and verification of the OPERABILITY of each initiglion relay.

(4)

A subgroup relay test shall be perfereed which shall ischmie the enegtretten/C x.,".zation of each 3

->g subgroup relay and verification of the OPERABILITY of each subgroup velay.

@g during plant operation shall be limited to only these relays associated with plant egulpment uhtchNelays enem wg cannot be operated during plant operation.

Nelays not testable during plant operetten shall be tested mi during each COLD SNUTDonel exceeding 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> unless tested dorfas the preefeus 5 months.

a

$'g (5) Actuated equipment only; does not result in CIAS.

(6) 'At least once per refueling interval.

With irradiated fuel in the storage pool.

.-l-.\\

]NSTRUMENTATION 3/4.3.3 MONITORING IN$TRUMERTATION

\\

RADIATION MONITORING INSTRUMENTATION LIM) TING CONDITION FOR OPERATION 1

3.3.3.1 shall be OPERABLE with their alam/ trip setpoints within i

i APPLICA81L17Y: As shown in Table 3.3-4.

AC710N:

i With a radiation monitoring channel alarm / trip sttpoint onceeding the a.

value shown in Table 3.3-6, adjust the setpoint to within the limit within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> or declare the channel inepar&ble.

b.

ACTION shown in Table 3.3 6.With one or more radiation monitori The provisions of Specifications 3.0.3 and 3.0.4 are not applicable.

c.

t EURVIILLANE REQUIREMENTS 4.3.3.1 Esch radiation monitoring instrumentation channel shall be demonstrated OPERABLE by the performance of the CHANNEL CHECK, CHANNEL CALIBR FUNCTIONAL TEST operations for the MODES and at the frequencies shown in Table 4.3 3.

l s'

SAN ON0fRE-UNIT 2 3/4 3-34 AMENDMENT NO. 83 l

i

' ',. ~.

~

~

TABLE 4.3-9 (Continued)-

TABLE NOTATION

    • 0uring waste gas holdup system operation (treatment for primary system offgases).

(1) The CHANNEL CALIBRATION shall include the use of standard gas samples containing a norninal:

1.

One volume percent hydrogen,' balance nitrogen, and 2.

Four volume percent hydrogen, balance nitrogen.

(2) -The CHANNEL CALIBRATION shall include the use of standard gas samples containing a nominal:

1.

One ve!eme percent oxygen, balance nitrogen, and 2.

Font vv'iume percent oxygen, balance nitrogen.

L I

i l

I

. SAN ONOFRE - UNIT 3 3/4 3-69 AMEN 0 MENT NO. 73 1

f.

i i

e A

I l

u 5

j s

.t t

r if i

t r

THIS PAGE INTENTIONALLY LEFT BLANK!

<i SAN ONOFRE - UNIT 3 3/4 3-70 AMENDMENT NO. 73.

t 4

g

(

i f

i l

e.g 4 -

',-g

'o

- I

..'4

, e ..

g -

s f

s.,

w 5

t

+

e 6

t l

1 I-l l-THIS PAGE INTENTIONALLY LEFT BLANK a

1

?

'.1 i

. SAN ON0FRE - UNIT 3 3/4 3-71 AMENDMENT N0. 73

.g

4,-:

'.p J]f's /

e *

-e Y

t I

-[

t i

THIS'PAGE INTENTIONALLY.LEFT. BLANK 1

+

1 4

o I

SAN ONOFRE - UNIT 3 3/4 3-72 AMEN 0 MENT NO. 73

k
  • 4

'9 i

$h ?-

y te

.. 'if_ f

~

THIS PAGE INTENTIONALLY'LEFT BLANK i

i I

i SAN ON0FRE - UNIT 3 3/4 3-73 AMENOMENT NO. 73

..-q i.t aI..

(9 4

e 4

-..g g

p 4, -

e" aP, J

'1 1

i l

THIS PAGE INTENTI0'NALLY LEFT BLANK l

t l

1 SAN ONOFRE - UNIT 3 3/4 3-74 AMENDMENT NO. 73 I

< i,

,g', j
  • I' 1 8 4

]

r l

l-4 e

(

THIS PAGE INTENTIONAL 1Y LEFT BLANK 4

SAN ON0FRE - UNIT 3 3/4 3-75 AMENDMENT N0. 73 3

i

r; s

'w

,'t;;

RE:n.E: i wu

. l-I N S TRUME N* AT I_O_N '

L 05E-PART DETECTION INSTRUMENTATION LIMITING CONDITION FOR OPERATION 3.3.3.10 The loose part! detection' system shall.be OPERABLE; APPLICABILITY:

MODES 1 and 2.

ACTION:

With one or more loose part detection; system channels. inoperable for a.

more than 30 days, prepare and submit a Special Report to the Commission pursuant-to Specification 6.9.2 within the next 10 days outlining the~cause of the malfunction and the plans for restoring-the channel (s) to OPERABLE status, The provisions of Specifications 3.0;3 and'3.0.4'are not applicable.

b,-

1 i

SURVEILLANCE REQUIREMENTS-j 4.3.3.10 Each channel of the loose part detection system shall be demonstrated i

?

OPERABLE by performance of a:

\\

CHANNEL CHECK at least once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />, I

a.

'l CHANNEL FUNCTIONAL TEST at least once per 31 days, and b.

CHANNEL CALIBRATION at least once per refueling interval.

c.

l 1:

l.

f

~

i I

4 SAN ONOFRE - UNIT.3 3/4 3-76 AMENOMENT NO. 63 t

l.