Notice of Violation from Insp on 900116-0308.Violation Noted:Operability of Two RCS Instrument Line Flow Check Valves Not Verified
ML20042D717
Person / Time
Site: Pilgrim
Issue date: 03/28/1990
From:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To:
Shared Package
ML20042D716 List:
References
50-293-90-05, 50-293-90-5, NUDOCS 9004050156
Download: ML20042D717 (1)


Text

.

r APPENDIX A NOTICE OF VIOLATION i

Boston Edison Company Docket No. 50-293 Pilgrim Nuclear Power $tation License No OPR-35 l

As a result of the inspection conducted on January 16 to March 8, 1990 and in accordance with the NRC Enforcement policy (10 CFR 2 Appendix C), the follow-ing violation was identified:

Technical Specification 4.7 A.2.b.1.d states that at least' once per operat-I ing cycle the operability of the reactor coolant system instrument line flow check valves shall be verified.

Contrary to the above, since procurement in May 1986, the operability of two reactor coolant system instrument line flow check valves had not been j

verified.

This is a Severity Level IV Violation (Supplement 1).

t i

Pursuant to the prov Sions of 10 CFR 2.201, Boston Edison Company is hereby required to submit to this office within thirty days from the receipt of the letter which transmitted this Notice, a written statement or explanation in I

reply, including (: (1) the corrective steps whten have been taken and the re-suits achieved; 2) corrective steps which will be taken to avoid further

(

violations; and (3) the date when full compliance will be achieved. Where good cause it, shown, consideration will be given to extending this response time, t

The response directed by this Notice is not subject to the clearance procedures of the Office of Management and Budget as required by the Paperwork Reduction Act of 1980, PL 96 511.

I t

i I

i I

i, OFFICIAL RECORD COPY IR PILGRIM 90 0004.0.0 11/29/80 9004090bCKODh00293 j

.;6 90 32s l

F'DR AD i

Q PDC

,