ML20042D402

From kanterella
Jump to navigation Jump to search
Forwards Proprietary Response to Request for Addl Info Re Application for Amend to License NPF-12 to Replace Existing Resistance Temp Detector (RTD) Bypass Manifold Sys W/Fast Response Rtds.Encl Withheld
ML20042D402
Person / Time
Site: Summer South Carolina Electric & Gas Company icon.png
Issue date: 01/02/1990
From: Bradham O
SOUTH CAROLINA ELECTRIC & GAS CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML19310C595 List:
References
NUDOCS 9001090095
Download: ML20042D402 (2)


Text

gy a

z.:

south c ronne ti.ctric a c e comp.ny -

ome s. ar.ohem I[g:/seens' Ou7t.7$>$riians l

L scaso

[

.m, i

January 2, 1990 I

i r.

1 Document Control Desk U. S. Nuclear Regulatory Commission

)

Washington, DC 20555

Subject:

Virgil C. Summer Nuclear Station Docket No. 50/395 Operating License No. NPF-12 b

Technical Specifications Change Request - RTD Bypass Elimination 1

Gentlemen:

As requested in your letter dated December 7, 1989, attached is additional informationontheSouthCarolinaElectric&GasCompany(SCE&G) Technical Specifications change request for RTD Bypass Elimination.

Specifically, this proposed amendment supports a plant modification to replace the existing resistance temperature detector (RTD) bypass manifold system with fast response RTDs located in the reactor coolant hot and cold leg piping. SCE&G is proposing this change to eliminate the operating obstacles associated with.

the bypass system such as leakage through valves and flanges and radiation exposure during reactor building maintenance.

The original Technical Specifications change request, submitted July 21, 1989, contains the Westinghouse Letter, " Application for Withholding Proprietary Information from Public Disclosure" (CAW-89-065) and Affidavit CAW-88-131. These documents are required because the change request includes WCAP-12189 which involves information proprietary to Westinghouse Corporation.

Attachment I contains SCE&G's response to the request for additional information. Because Attachment 1 contains detailed infermation pertaining to WCAP-12189, SCE&G requests the NRC to treat the attacned response as part of the original submittal and, as such, to withhold from public disclosure that information which is proprietary to Westinghouse.

I declare that the statements and matters set forth herein are true and correct to the best of my knowledge, information and belief.

1 lPOl 0

{

\\

9001090095 900102

PDR ADOCK 03000395

.P PDC

y 1

3,

I i.

Document Control Desk L

January 2, 1990 Page 2 of 2.

l Should you have any questions, please call at your convenience.

o Very truly yours, 5p I

O. S. Bradham t

l EWR/OSB:1bs-j.1

' Attachments c:

D. A. Nauman/0. W. Dixon, Jr./T. C. Nichols, Jr.

E. C. Roberts R. V. Tanner t

S. D. Ebneter J. J. Hayes, Jr.

General Managers-C. A.. Price R. B. Clary K. E.,Nodland J. C. Snelson R. L. Prevatte 1

H. G. ' Shealy J. B. Knotts, Jr.

E. W. Rumfelt.

NSRC NPCF RTS (TSP 890009)

File (813.20)~

i f

l l

o'