Forwards IE Insp Repts 50-335/82-02 & 50-389/82-02 on 820202-05.No Noncompliance Noted
ML20042B669
Person / Time
Site: Saint Lucie  NextEra Energy icon.png
Issue date: 03/02/1982
From: Long F
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Robert E. Uhrig
FLORIDA POWER & LIGHT CO.
Shared Package
ML20042B670 List:
References
NUDOCS 8203250508
Download: ML20042B669 (2)


See also: IR 05000335/1982002

Text

{{#Wiki_filter:. . - _ . . i. b MAR 0 2 1982 [[7 Florida Power and Light Company ,, ATTN: Dr. R. E. Uhrig, Vice President Q' Advanced Systems and Technology N Ef m ' "O 'p P. O. Box 529100 j Miami, FL 33152 _] pp 3 ; jggg l--- S 3

  • * "g*m s%-

2 Gentlemen: r_ ~ Subject: Report NosQ-335/82Dnd 50-389/82-02 %n g# w .. This refers to the routine safety inspection conducted by Mr. J. J. B of this office on Februe y 2-5, 1982, of activities authorized by NRC Operating License .No. DPR-67 and Construction Permit No. CPPR-144 for the St. Lucie facility and to the discussion of our findings held with Mr. B. J. Escue, Site Manager, at the conclusion of the inspection. . Areas examined during the inspection and our findings are discussed in the enclosed inspection report. Within these areas, the inspection consisted of selective examinations of procedures and representative records, interviews with personnel, and observations by the inspector. Within the scope of this inspection, no violations or deviations were disclosed. In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure will be placed in the NRC's Public Document Room unless you notify this office, by telephone, within ten days of the date of this letter and submit written appli- cation to withhold information contained therein within thirty days of the date of this letter. Such application must be consistent with the requirements of 2.790(b)(1). Should you have any questions concerning this letter, we will be glad to discuss them with you. Sincerely, 4/ F. J. Long, Acting Chief Reactor Projects Branch 2 Division of Project and Resident Programs -Enclosure: See Page 2 8203250508 820302 PDR ADOCK 05000335 G PDR

- .

. , MAR 0 2 1982 Florida Power and Light Company 2 Enclosure: Inspection Report Nos. 50-335/82-02 and 50-389/82-02 cc w/ encl: C. M. Wethy, Plant Manager N. Weems, Assistant QA Construction Manager B. J. Escue, Plant Manager bcc w/ encl: NRC Resident Inspector Document Management Branch State of Florida RII,,o RI RII RI (yf5 JJBlake:ht ARHerdt KL dis F ong ' 2N /82 9/} /82 7)/& /82 }/p . - - -- -- }}