Forwards IE Insp Rept 50-293/82-05 on 820201-05 & Notice of Violation
ML20042B656
Person / Time
Site: Pilgrim
Issue date: 03/09/1982
From: Martin T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Harrington W
BOSTON EDISON CO.
Shared Package
ML20042B657 List:
References
NUDOCS 8203250492
Download: ML20042B656 (2)


See also: IR 05000293/1982005

Text

.

e

.

0 9 MAR 1982

Docket No. 50-293

P 'D

s

Boston Edison Company M/C Nuclear

3

q

ATTN: Mr. William D. Harrington

p17

.

I

-

Senior Vice Presidert, Nuclear

[f/

' " ' 'MN

~

h6

800 Boylston Street

' '

g

aqM 9 .,[n2

Boston, Mesachusetts

02199

Gentlemen:

(

A[

v

Subject:

Inspection 82-05

\\ m ij ip F

This refers to the routine inspection conducted by Mr. G. Napuda of this

office on February 1-5, 1982 at Pilgrim Nuclear Power Station, Plymouth,

Massachusetts and at your Boston, Massachusetts corporate office of activities

authorized by NRC License No. DPR-35 and to the discussions of our findings

held by Mr. Napuda with yourself and other members of your staff at the

conclusion of the inspection.

Areas examined during this inspection are described in the NRC Region I

Inspection Report which is enclosed with this letter. Within these areas,

the inspection consisted of selective examinations of procedures and re-

presentative records, interviews with personnel, and observations by the

inspector.

Based on the results of this inspection, it appears that one of your activities

was not conducted in full compliance with NRC requirements, as set forth in

the Notice of Violation, enclosed herewith as Appendix A.

This item of

noncompliance has been categorized into the levels described in the Federal

Register Notice (45 FR 66754) dated October 7, 1980.

You are required to

respond to this letter and in preparing your response, you should follow

the instructions in Appendix A.

In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosures

will be placed in the NRC Public Document Room unless you notify this

office, by telephone, within ten days of the date of this letter and submit

written application to withhold information contained therein within thirty

days of the date of this letter. Such application must be consistent with

the requirements of 2.790(b)(1). The telephone notification of your intent

to request withholding, or any request for an extension of the 10 day

period which you believe necessary, should be made to the Supervisor,

Files, Mail and Records, USNRC Region I, at (215) 337-5223.

R1:DETP

R1:DETP

R1:DETP,e

Na

2/wb

Caphton

Ebnetep

3

2

pg 40

dfiv

F

'I 0FFICIAL RECORD COPY

3bfe>

8203250492 820309

%gDI

PDR ADOCK 05000293

O

PDR

3

II

__

.-

.

.

.

Boston Edison Company M/C Nuclear

2

Your cooperation with us in this matter is appreciated.

Sincerely,

'

w;c_.101&ned By s S E.f A

Thomas T. Martin, Director

~

Division of Engineering and Techn1 cal

Programs

Enclosures:

1.

Appendix A, Notice of Violation

2.

Office of Inspection and Enforcement Inspection

Report Number 50-293/82-05

cc w/encls:

A. V. Morist, Manager, Nuclear Operations Support

R. D. Machon, Nuclear Operations Manager - Pilgrim Station

Public Document Room (PDR)

Local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector

Commonwealth of Massachusetts (2)

bec w/encis:

Region I Do:ket Room (with concurrences)

Chief, Operational Support Section (w/o encis)

T.C. Elsasser

0FFICIAL RECORD COPY