o AC40 - RA l

1 NRC MONTHLY OPERATING REPORT DOCKET NO.

50-206 DATE 19 / 9/A1 COMPLETED BY T. Raidv TELEPHONE 1 71a A92-7700 OPERATING STATUS SAN ONOFRE NUCLEAR GENERATING STATION

1. Unit Name:

1 November 1981 through 30 November 1981

2. Reporting Period:

1347

3. Licensed Thermal Power (MWt):
4. Nameplate Rating (Gross MWe):

436

5. Design Electrical Rating (Net MWe):

4 456

6. Maximum Dependable Capacity (Gross MWe):

436

7. Maximum Dependable Capacity (Net MWe):
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Imt Report. Give Reasons:
9. Power Level To Which Restricted. lf Any (Net MWe):

N/A N/A

10. Reasons For Restrictions.If Any:

This Month Yr.-to.Date Cumulative 720 8016 122,017 I1. Hours in Reporting Period b9.6 1720.8 86.332.1

12. Number Of Hours Reactor Was Critical
13. Reactor Reserve Shutdown Hours 0

0 3

14. Hours Generator On.Line fog 2,3

"""l 1601.6 32,9/5

15. Unit Reserve Shutdown Ilours 0

0 0

16. Gross Thermal EnerEy Generated (MWH) 743,867 1,728,900 105,813,161 248,400 582,000 36.422,244 17 Gross Electrical Energy Generated (MWH)
18. Net Electrical Energy Generated (MWH) 233,832 536,241 34,210,283 90.08%

19.98%

68.00% *

19. Unit Service Factor
20. Unit Availability Factor 90.08%

19.98%

68.00% *

21. Unit Capacity Factor IUsing MDC Nett 74.49%

-15:34%

65.35% *

22. Unit Capacity Factor IUsing DER Net) 74.49%

T5c34%

65.35%

  • 6./%

79.96%

22.J/%

23. Unit Forced Outage Rate
24. Shutdowns Scheduled Oser Nest 6 Months (Type. Date.and Duration of Each 3:

Twn scheduled outaaes: Fahroarv 14A>

1 ria v. an,.41 1982. g won'tey

25. If Shur Down At End Of Report Period Estimated Date of Startup:
26. Units In Test Status (Prior o Commercial Operation): _

Forecast Achiesed INI TIA L CRITICALITY INITI \\L ELECTRICITY Cott\\lERCIA L Ol'ER A IION' 0203250443 011214 PDR ADOCK 05000206 R

PDR

(I'-

REFUELING INFORMATION DGCKET NO.

50-206 UNIT SONGS 1 DATE 12/2/81 COMPLETED BY T. Raidv TELEPHONE 714-492 7700 EXT:

702 1.

Scheduled date for next refueling shutdown.

March 1983 2.

Scheduled date for restart following refueling.

May 1983 3.

Will refueling or. resumption of operation thereafter require a Technical Specification change or other license amendment?

Not yet detennined.

What will these be?

I 4.

Scheduled date for so' omitting proposed licensing action and supporting information.

Not yet detennined 5.

Important licensing considerations associated with refueling, e.g.

new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures.

Not yet determined.

6.

The number of fuel assemblies.

a)

In the core 157 b)

In the spent fuel storage pool.

94 7.

Licensed spent fuel storage capacity.

21 6 Intended change in spent fuel storage capacity. NONE 8.

Projected date of last refueling that can be discharged to spent fuel storage pool assuming present capacity.

October 1984

  • sso(sj ars ag e esta

SUMMARY

OF OPERATING EXPERIENCE FOR THE_ MONTH DOCKET NO.

50-206 UNIT SONGS 1 DATE 1 2/2/81 COMPLETED BY T. Raidy TELEPHONE 714-492-7700 EXT: 702 Nov.1, 0001 Unit remains shutdown for modification and testing of Safety injection system. Reactor coolant system heat-up is in progress.

Nov. 2, 0427 Ccmpleted hot functional test of safety injection system. All components operated properly.

~

Nov. 3, 2330 Reactor critical.

Nov. 3, 0523 Unit 1 on Line at 35 MW.

Nov. 3, 1700 Unit load 390 MW.

Nov. 6, 1445 Steam generator carryover found to be.25% on A,.18% on B,.34% on C.

Nov.11, 0830 Feedwater leak noted at flow orifice upstream root valve weld for B steam generator. This leak was repaired by. welding at 0135 on Nov.12.

Nov.13, 0100 Isolation valve CV531 for PORV 545 failed to close during a routine test. On Nov.17 a temporary air supply was installed to the diaphram of CV531 and the valve was closed to stop slight leakage through PORV 545.

Nov.16, 2130 Unit load increased to 400 MW to evaluate steam generator carryover.

l Nov.18,1410 Unit load reduced to 390 MW because of high carryover from steam generators.

Nov. 19, 1314 No.1 Diesel Generator tripped on overspeed while No. 2 diesel generator was out of service for routine preventative maintenance.

Nov.19,1518 No. 2 diesel generator returned to service.

Nov.19, 2240 No.1 diesel generator overspeed problem corrected by adding oil to speed. governor oil reservoir.

Nov.19, 2133 Unit load reduced to 210 MW for condenser cleaning.

Nov. 20, 0545 Unit load 390 MW after condenser cleaning.

l Nov. 21, 0010 Unit load reduced to 382 MW for heat treat of circulating water intake.

A meset.I n. = c.. r,.

.. =.

SUMMARY

OF OPERATING EXPERIENCE FOR THE MONTH e

DOCKET NO. 50-206 UNIT

0NGS 1 DATE 1 2/2/81 COMPLETED BY T. Raidy TELEPHONE 714-492-7700 EXT

702 Nov. 21, 0650 Unit load 390 MW after heat treat.

Nov. 23, 2124 Unit taken off line to perform minor maintenance and to evaluate the performance of safety injection valves HV851A and HV8518.

Nov. 24, 0030 Safety injection test results were evaluated and found to be satisfactory.

Nov. 24, 1143 Reactor critical.

Nov. 24, 2040 Unit load 390 MW.

Nov. 30, 2400 Unit remains on line at 390 ;G.

t e

mo t e l.....,,.

/

e UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-206 UNIT NAME SONr,S 1 DATE Dec 2 1981 CMpl,E E

REPORT MONTH November 10 714-4 7700 hE 3?

Licensee h

Cause & Correctne

=

Date 3g 4

2s E Event g?

93 Action to 5:

e jgg Report a mO

]O H

Prevent Recurrence c5 67 Sept. 3, 81 F

4,T Z

2 LER 020 SF Valves Tests show HV valves will not open 3r 3* g with, design AP.

New design being installed and testing in process.

LER 021 BB Instru Voltage regulator filter choke failed to ground. Regulator was temporarily jumpered for power continuity, and has subsequently been repaired.

68 Nov.19, 81 S

8.75 8

4*

N.A.

HC Htexch Clean condenser water boxes.

69 Nov. 21, 81 S

6.7 B

4*

N.A.

HF 22222 Heat treat of Circ. Water Systems.

70 Nov. 23, 81 S

12.9 8

1 N.A.

SF Valves Testing of Safety injection system Valves.

I 2

1 4

1 I i nrced Reasien :

Method:

Exhibit F. instinctions 5

S. hed uled A.1:quigunent Failure (Explain) 2-Manual Scram.

I:ntr> Sheets for 1.icemee 1-Manual for Preparation of Data H. Maintenance oi Test

}

C. Refueling 1 Automatic Sesam.

I'veni Repius il I R1l~ile iNL'RI G D Regulato:S Restriction 4.O:her ( Explain )

01611 I -Opesains Training & liense Examination F. Admumtraiive 5

t,.Opciasii.n.d I isoi siixplaini FsinbiilI s.nne S.'mee ll-Otheiil splain)

  • Partial Outage Reduced Power.

%ol.).n

... n.

-.y:.

AVER AGE DAILY UNIT POWER LEVEL a

DOCKET NO. 50-206 UNIT SONGS 1 DATE 2 Dec. 81 COMPLETED BY T. Raidy

" TELEPHONE 714 492-7700 EXT:

702 MONTH November DAY AVERAGE DAILY POWER LEVEL DAY AVER AGE DAILY POWER LEVEL (MWe-Net)

Mwe.Neu I

O 380

,g7 2

0 375 gg 3

185 i,

347 4

370 335 2o 5

370

~

358 23 6

370 22 370 7

370 23 297 s

370 96 24 9

370 25 370 to 370 26 370 is 370 27 370 12 370 370 g

13 370 370 29 14 370 30 370 is 370 3

to 370 1

l