Forwards IE Insp Repts 50-003/76-10,50-247/76-23 & 50-286/76-25 on 760927-1001,12-13 & 19-20 & Notice of Violation
ML20042B160
Person / Time
Site: Indian Point  Entergy icon.png
Issue date: 11/16/1976
From: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: William Cahill
CONSOLIDATED EDISON CO. OF NEW YORK, INC.
Shared Package
ML20042B161 List:
References
NUDOCS 8203250040
Download: ML20042B160 (6)


See also: IR 05000003/1976010

Text

_

-

.i

s

X ':

I

~

'

.

.

%

  1. 8"%,

I

UNITED STATES

t

g.

NUCLEAR REGULATORY COMMISSION

[3.:..,$.., .kM , $

,

8

REGloN I

.

.

g

- e

s31 PARK AVENUE

o, >* J

g

KING oF PRUS$1A, PENNSYLVANI A 19405

'y

g

9

.;

,p

w

...

'

&

N0'l l 61976

lL

.h,

Consolidated Edison Company of

License Nos. DPR-5

-

g

. New York, Incorporated

DPR-26

y

Attention:

Mr. W. J. Cah.o

Jr.

DPR-64

g

Vice President

Inspection Nos. 76-10 '

4..

4 Irving Place

76-23

$

New York, New York 10003

76-25

$

Docket Nos.50-003

4

50-247

h

g2O

Gentlemen:

,

yh

This refers to the special inspection conducted by Mr. D. Neely of this

Y

office on September 27 - October 1, October 12-13 and October 19-20,

4 2

1976 at Buchanan, New York of activities authorized by NRC License Nos.

g

DPR-5 (Unit 1), DPR-26 (Unit 2) and DPR-64 (Unit 3) and to discussions

k.:!

of our findings held by Mr. Neely with Mr. E. Kessig and other members

s

?, t

of your staff on October 1, 1976.

This also refers to the meeting held

Q

by Mr. Neely with Mr. T. Law and other members of your staff on October

3

13, 1976.

, . ,3

y

7E

Areas examined during this inspection are described in the Office of

Y

g

Inspection and Enforcement Inspection Report which is enclosed with this

M

W

letter. Within these areas, the inspection consisted of selective

.

examinations of procedures and representative records, interviews with

%y

personnel, measurements made by the inspector, and observations by the

@

inspector.

Wi.[

Based on the results of this inspection, it appears that certain of your

pi

activities were not conducted in full compliance with NRC requirements,

}

as set forth in the Notice of Violation, enclosed herewith as Appendix

4

A.

These items of noncompliance have been categorized into the levels

ld

as described in our correspondence'to you dated December 31, 1974.

This

A

notice is sent to you pursuant to the provisions of Section 2.201 of the

i

NRC's " Rules of Practice", Part 2, Title 10, Code of Federal Regulations.

j

Section 2.201 requires you to submit to this office, within twenty (20)

4

days of your receipt of this notice, a written statement or explanation

,s

in reply including:

(1) corrective steps which have been taken by you

H

and the results achieved; (2) corrective steps which will be taken to

k"

. avoid further items of noncompliance; and (.3) the date when full compliance

will be achieved.

We note that Item B in the. Notice of Violation was

y

corrected prior to completion of the inspection; and therefore, no

i

response with respect to this matter is required.

.

,.7

r=

L E'cd

l .-

i;

l' i

.

.!

.

8203250040 761116

'k

PDR ADOCK 05000003

'

NO

"I4MU"

~~P

~ ' "W

W ^,N

~ """7 ; #3

, , ,

. , . ,

.

.

.

le

'

'*

.

-

.

.

~

-

'

-2-

.'w

g ' Our inspector also verified the steps you had taken to correct the items

'

of noncompliance brought to your attention in a letter dated June 21,

-

1976. We have no further questions regarding the steps you took to

$

-p

correct Items Numbered 1, 3, 4, 6 and 7.

Item Number 2 will be

7h

reviewed in a subsequent inspection.

With regard to Number 5, as

-

M

noted in Item A of the Notice of Violation, corrective action was not

3

adequate. We note that this item is recurrent, in that, items of this

N

nature wera found during inspections conducted in December, 1975, April,'

72

-

1976 and June, 1976.

in

NYy

We are concerned that your management control system has not been

Y

effective in preventing this recurrence.

Consequently, in your reply,

N

describe those additional actions taken or planned to further improve

j

the effectiveness of your management control, system.

A(

In accordance with Section 2.790 of the NRC's " Rules of Practice", Part

-}

2, Title 10, Code of Federal Regulations, a copy of this letter and the

(

enclosures will be placed in the NRC's Public Document Room.

If this

&

report contains any information that you (or your contractor) believe to

-)}

be proprietary, it is necessary that you make a written application

f

within 20 days to this office to withhold such information from public

17

disclosure.

Any such application must be accompanied by an affidavit

_g

executed by the owner of the information, which identifies the docu=ent

yp;

or part sought to be withheld, and which contains a statement of reasons

t

which addresses with specificity the items which will be considered by

[

h

the Coc=ission as listed in subparagraph (b)(4) of Section 2.790.

The

information sought to be withheld shall be incorporated as far as

-x

@

possible into a separate part of the affidavit.

If we do not hear from

d

you in this regard within the specified period, the report will be

placed in the Public Document Room.

,

l '3_

Your written response to this letter, combined with our findings from

[

our continuing inspection program, will be considered in determining

whether any further enforcement action, such as modification, suspension

t

..

y

or revocation of the licenses is appropriate.

-.

' Sincerely,

5E

A.

M h.

j

ee P. O'Reilly

.

D ector c

-

-

_

q

4

'

.

,!

e

a1

.

LI.

%

., m --

w p

.m -

q

.

R

_ _ . _

-

.

.

r

~

u

.

.

.

..-

-

'l

y

_3_

.

.

dy

-

. . . .

a

h

(

Enclosure:

-

7,

1.

Apnendix A, Notice of Violation

L

2.,

Ir; Inspection Report No. 50-03/76-10, 50-247/76-23

't

and 50-286/76-25

n

-

e

~ce:

A. D. Kohler, Resident Contructica Manager (Con Ed)

[

1

E. Kessig, Acting Manager, Nuclear Power Generation Department (Con-Ed)

__

T. Law, Plant Manager (con Ed)

j

J. M. Makepeace, Director, Technical Engineering (Con Ed)

]

L. M. Trosten, Esquire

George T. Berry, General Manager and Chief Engineer (PASNY)

-

Y

Z. E. Chilazi, Manager of Projects, Thermal Power Generation (PASNY)

  • $

A. Z. Roisman, Counsel for Citizens Committee for

Jg

Protection of the Environment (Without Report)

.

.

,1

6

' ?L

,8=,'

r.

.

f

.g:

.

$

,s

,@

p

.r

[3'

1

f.

9;

.

-.

.v

E,

iv

,%

l

Y

I

$

. . .

.

I

zTy

-

.-

.

.

s

P

i

Jf

'

'

I

ef

L

i

0

-

T,

.

,y,

,,.-- - m - =' '~ . 3 ,

-.<.x

y,

n,

.-

.

.g . . y , - 3 r...-

w p g

-,.-

~ ,,.r ry

, , , ,g ,

,.e2

--,

,

i

. _ . . _ _ -

.__ _.

!

-

-

-

-

-

.

-.

.

_