UNITED STATES
j
NUCLEAR REGULATORY COMMisslON
j ,) '/ M I
REGION I
- '4 h
a
s31 PAstK AVENUE
i
b
~
E
e,
KING OP PseUSSI A. PENN5Yt.VANI A 19406
k
.
,
.....
Docket Nos. 50-003/
AUG 171977
50-247
-
-
50-286
, . >
-
Consolidated Edison Company of
New York, Inc.
ATTH:
Mr. W. J. Cahill, Jr.
.
Vice President
>
,
.
4 Irving Place
~
~
Gentlemen:
Subject:
Inspections 50-003/77-07, 50-247/77-19, 50-286/77-19
This refers to the inspection conducted by Mr. D. R. Neely of this
office on May 9-13,16-20, 24-28, May 31-June 4, 5-10, and July 14-15,
1977, at Buchanan, New York, of activities authorized by NRC License
Nos. DPR-5, OPR-26 and DPR-64 and to the discussions of our findings
held by Mr. Neely with Mr. E. McGrath of your staff at the conclusion of
the inspection, and to a subsequent telephone discussion between Mr. L.
Thonus and Mr. S. Wisla on July 20, 1977.
,
Areas examined during this inspection are describec' in the Office of
Inspection and Enforcement Inspection Report which is enclosed with this
letter. ' Within these areas, the inspection consisted of selective
examinations of procedures and representative records, interviews with
personnel, measurements made by the inspector, and observations by the
inspector.
l
Based on the results of this inspection, it appears that certain of your
activities were not conducted in full compliance with NRC requirements
as set forth in the Notice of Violation, enclosed herewith as Appendix
A.
These items of noncompliance have been categorized into the levels
as described in our correspondence to you dated December 31, 1974.
This
notice is sent to you pursuant to the provisions of Section 2.201 of the
NRC's " Rules of Practice", Part 2, Title 10, Code of Federal Regulations.
Section 2.201 requires you to submit to this office, within twenty (20)
days of your receipt o# this notice, a written statement or explanation
in rolj including:
(1) corrective steps which have been taken by you
and the results achieved; (2) corrective steps which will be taken to
avoid further items of noncompliance; and (3) the date when full com-
pliance will be achieved.
In addition to the need for corrective action
-
.
8203240579 770817
PDR ADOCK 05000003
G
.
,.
.
Consolidated Edison Company of
2
AUG 171977
f
New York, Inc.
-
!-
l
regarding these specific items of noncompliance, we are concerned about
!
tne implementation of your management control systems that pennitted
them to occur.
Consequently, in your reply, you should describe in
particular, those actions taken or planned to improve the effectiveness
of your management control systems.
Items A, B, C, and D in Appendix A of this letter are recurrent.
In
your reply please gifEspecial attention to the steps which will be
taken to prevent further instances of noncompliance of this nature.
-
Your reply to this letter will be considered in determining whether any,,
i-
further enforcement action, such as modification, suspension, or revoca2
l'
tion of the licenses, is appropriate.
]
In accordance with Section 2.790 of the NRC's " Rules of Practice", Part
2, Title 10, Code of Federal Regulations, a copy of this letter and the
enclosures will be placed in the NRC's Public Document Room.
If this
report contains any information that you (or your contractor) believe to
be proprietary, it is necessary that you make a written application
within 20 days to this office to withhold such information from public
disclosure. Any such application must be accompanied by an affidavit
'
executed by the owner of the information, which identifies the document
or part sought to be withheld, and which contains a statement of reasons
-
which addresses with specificity the items which will be considered by
'
the Comission as listed in subparagraph (b) (4) of Section 2.790.
The
infonnation sought to be withheld shall be incorporated as far as pos-
.
sible into a separate part of the affidavit.
If we do not hear from you
i
l
in this regard within the specified period, the report will be placed in
the Public Document Room.
'
Should you have any questions concerning this inspection, we will be
pleased to discuss them with you.
Sincerely,
.
.
.
i
Boyce H. Grier
l
Director
Enclosures:
1.
Appendix A, Notice of Violation
l
2.
Office of Inspection and Enforcement Inspection Report Numbers
1
50-003/77-07, 50-247/77-19, 50-286/77-19
..
.
.
,
Consolidated Edison Company of
3
AUG 171977
New York, Inc.
cc w/encis:
L. O. Brooks, Project Manager, IP Nuclear (Con Ed)
E. R. McGrath, Manager, Nuclear Power Generation Department (Con Ed)
T. Law, Plant Manager (Con Ed)
J. M. Makepeace, Director, Technical Engineering (Con Ed)
L. M. Trosten, Esquire (Representing Con Ed)
George T. Berry, General Manager and Chief Enginper (PASNY)
Z. E. Chilazi, Manager of Prdjects, Thermal Power Generation (PASNY)
., A. Z. Roisman, Counsel for Citizens Comittee- for Protection of the
Environment (Without Report)
.
.___.. ._.____. _ ... .. .._..
..-
. _ .
bec w/encls:
-
.
IE Mail & Files (For Appropriate Distribution)
l
Central Files
'
Public Document Room (PDR)
!
Local Public Document Room (LPDR)
!
Nuclear Safety Information Center (NSIC)
l
Technical Inforration Center (TIC)
~
'
REG:I Reading Room
Region Directors (III
IV) (Report Only)
'
State of New York
A. Z. Roisman, Counsel for Citizens Comittee for
Protection of the Environment
.
l
l
l
l
1
l
l
-.
. . . .
- " " - - '
.
-