EPIP O
100 - Station Group Director's Duties 100-1 Supervision of Emergencies, Drills and Exercises (Primary Responsibility - Station Director)
Rev.1 5/81 100-C1 Station Director - Checklist of Initial GSEP Responsibilities Rev. 2 3/82 100-C2 Operations Director - Checklist of Initial GSEP Responsibilities Rev.1 1 /81 i
100-C3 Technical Director - Checklist of Initial GSEP Responsibilities Rev. 2 2/82 100-C4 Maintenance Director - Checklist of Initial GSEP Responsibilities Rev.1 3/81 100-C5 Stores Director - Checklist of Initial GSEP Responsibilities Rev.1 7 /81 100-C6 Administrative Director - Checklist of Initial GSEP Responsibilities Rev. 2 10/81-100-C7 Security Director - Checklist of Initial GSEP
~
Responsibilities Bev.1 1 /81 100-C8 Rad / Chem Director - Checklist of Initial GSEP Responsibilities Rev.1 1 /81 100-C9 Emergency Reports Checklist (Primary Responsibility - Operations Director)
Rev.1 3 /81 100 410 Record Of GSEP Activities Rev. 0 1 /81 100-C11 Environs Director - Checklist of Initial GSEP Respor#h414 ties Hav. 0 7/81
't I
L i
i.
O WAR 011982 5
8203240546 820318
- {
.__ PDR ADOCK 05000010 F
_ 7)
I
EPIP 100-C1 STATION DIRECTOR Revision 2 (Checklist of Initial GSEP Responsibilities)
March 1982 NOTE This checklist is provided solely for the convenience of the Station Director.
It is not necessary to follow this checklist step by step.
Its completion is not required and its use is determined by the Station Director.
I.
Classify GSEP Condition - Refer to Classification of GSEP Conditions (EPIP 200-TI).
Transportation Accident Unusual Event Alert Site Emergency General Emergency NOTE O
If the condition is not a GSEP, review Operating Order or Sections B.2, 8.3 or B.4 of EPIP 300-1 for other notifications.
II. Use pre-printed NARS Form or the Nuclear Accident Report System Fonn (EPIP 300-Cl) to ensure notifications contain all essential and required infonnation. Refer to Table I of EPIP 300-1 for Recommended Off-Site Protective Actions for gaseous plume ex-posure.
- III. Verify notifications of or notify applicable personnel as listed below in accordance with EPIP Notifications Phone List.
A.
General Emergency only.
Illinois Emergency Services and Disaster Agency.
Department of Nuclear Safety.
Will County Emergency Operations Center.
Grundy County Sheriff.
O
- statioa oirector caaaot aeie9 ate these resPoasibiiities-APPROVED 1 of 4 MAR 01*82 u.Q.S.R.
t
^
EPIP 100-C1 Revision 2 Q
B.
Transportation Accident, Unusual Event, Alert, Site Emergency and General Emergency.
1.
System Power Dispatcher.
2.
NRC Operations Center.
3.
Appropriate local agencies as needed.
i a.
Illinois State Police.
b.
Coal City Fire Department.
c.
Morris Fire Department.
d.
Coal City Emergency Squad.
e.
St. Joseph Hospital of Joliet.
f.
Bureau of Environmental Health, Illinois Department of Health, g.
Army Corp. of Engineers.
h.
U.S. Coast Guard.
O i-c e "ia est ruei aeProcessias eiaat-IV. Samples and surveys during Post Accident Conditions should be performed in accordance with the following prioritized guidelines:
a.
Perform Area Surveys and collect Air Surveys in the Centrol Room, Assembly Areas, TSC and OSC if a gaseous release is occurring or if radiation levels in Primary Containment are greater than the unusual event classi-fication.
b.
Collect air or liquid samples as close as possible to the point of any effluent release that is occurring as a result of the event.
c.
Collect Reactor Water, Torus Water, Drywell Air and Sump Water samples as necessary to accommodate safe operation of the plant, d.
Perfonn local area surveys and collect air samples as appropriate to accomplish required maintenance activities.
e.
In the absence of the Environs Director and once personnel become available, perfonn offsite surveys and collect offsite air and water samples.
I O
APPROVED
'1 2 of 4 MAR 01'82 D.O.S.R.
c
l EPIP 100-C1 Revision 2 V.
Assess the need for assembly and evacuation of non-essential personnel (required for Site or General Emergency).
s VI. Verify or have verified that augmentation requirements as specified in Table II of EPIP 300-1 are met.
NOTE Numbers needed are for the Site and General Emergency. Refer to Table II of EPIP 300-1 to detennine requirements for the Unusual Event or Alert categories.
Station Director (1)
On-Site Assessment (1)
Operations Director (1)
In-Plant Assessment (1)
Maintenance Director (1)
Rad./ Chem. (Lab) (1)
Technical Director (1)
Nuclear Engineer (1)
Adninistrative Director (1)
Electrical Engineer * (1)
Stores Director (1)
Mechanical Engineer * (1)
Rad./ Chem. Director (1)
Mechanical Foreman * (1)
Security Director (1)
Electrical Foreman * (1)
Environs Director (1)
Radwaste Foreman * (1)
Communications (5)
I.M. Foreman * (1)
Off-Site Assessment (4)
Rad. Protection (4)
- May substitute personnel of equivalent experience or background.
VII. Establish on-going communications per On-Going Emergency Communications (EPIP 300-2).
TSC/ Control Room TSC/NRC TSC/ Corporate Command Center and Nearsite E0F Control Room /TSC Control Room /0SJ VIII. Activate the Station Group as required by Table II of Initial Notifications and GSEP Responses (EPIP 300-1),
Technical SupNrt Center (EPIP 400-1) and Operational Support Center (EPIP 400-2).
l A.
Notify the Shift Engineer:
l 1.
When the Technical Support Center (TSC) is activated and is ready to assume responsibility l
for off-site communications.
l O APPROVED 3 of 4 MAR 01'82 cx.S.R.
I
EPIP 100-C1 Revision 2 2.
When the Station Director assumes command 0
(formal statement of turnover).
B.
Note the name of the person in charge at the Opera-tional Support Center (OSC) and the time it is acti va ted.
1.
Name of person in charge.
2.
Time activated.
NOTE TSC and OSC must be activated within 60 minutes for Site Energency and General Emergency.
IX. Direct the Administrative Director and Security Director to establish control of access to the TSC.
X.
Assess the need for the Security Director to control access to roads entering the plant property.
XI. Assess the need for assistance from the Department of Energy, Chicago Operations Office (contact will normally be made by CCC or EOF).
()
XII. Note additional support requested from the Corporate Command Center Director or the Recovery Manager.
XIII. Note any direction of major consequence or concern received from the Corporate Command Center Director or the Recovery Manager.
XIV. Record subsequent GSEP related activities on Record of GSEP Activities (EPIP 100-C10).
l O APPROVED 4 of 4 (FINAL)
WR 01.T2 l
u.0.S.R.